Contractor dossier
347 projects on file, including joint ventures this contractor is part of.
Total projects
347
Total budget
₱25.1B
Average progress
96.2%
Completion rate
90.8%
Average risk score
45.9
Medium risk on average, out of 100
Flagged as unusual
8
2.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 345 | ₱24.8B | 45.8 | 8 | 96.2% |
| Region I | 2 | ₱268.4M | 62.3 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 197 | ₱13.9B | 45.2 | 2 | 95.6% |
| Flood Control and Drainage | 141 | ₱10.5B | 46.0 | 4 | 96.8% |
| Bridges | 3 | ₱55.9M | 29.2 | 0 | 100.0% |
| GAA 2025 SSP | 2 | ₱280.8M | 94.4 | 2 | 97.8% |
| OTHER | 2 | ₱141.6M | 69.5 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱96.5M | 91.2 | 0 | 100.0% |
| Buildings and Facilities | 1 | ₱24.7M | 40.4 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CG0150SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF EAST LATERAL MEGADIKE ROAD, BARANGAY DEL ROSARIO - BARANGAY LARA S | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 99% | High risk95 | Flagged0.014 |
| 25CG0151SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF EAST LATERAL MEGADIKE ROAD, BARANGAY SAN VICENTE - BARANGAY SAN IS | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 97% | High risk94 | Flagged0.013 |
| 25CD0082CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUAYAN RIVER AND ITS TRIBUTARIES, CAINGIN - MEYLAND SECTION, STA. 9+613 - STA. 9+850, MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 100% | High risk91 | —-0.018 |
| 25CD0171CONSTRUCTION OF CONSTANTINO - UBIHAN ROAD DIKE, STA. 0+000 STA. 0+120, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 4% | High risk81 | Flagged0.004 |
| 25CD0020CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SAN JOSE RIVER RIVER, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 100% | High risk81 | —-0.026 |
| 25CD0021CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG NCR/BULACAN BDRY. - BIGTE - IPO DAM ROAD, SAN JOSE RIVER, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 71% | High risk81 | —-0.015 |
| 25CG0153SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD ALONG SETBACK LEVEE, PHASE II, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 2% | High risk77 | Flagged0.003 |
| 25CG0152SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD ALONG SETBACK LEVEE, PHASE I, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 0% | High risk77 | Flagged0.004 |
| 24CD0150CONSTRUCTION OF BYPASS (ALTERNATE) ROAD (PHASE V), BARANGAY MUZON, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱95M | 100% | High risk76 | —-0.056 |
| 24CD0152CONSTRUCTION OF MUZON TO GAYA-GAYA BYPASS ROAD (PHASE V), CITY OF SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱61.2M | 100% | High risk74 | —-0.065 |
| 25CD0182REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS GEN. ALEJO SANTOS HIGHWAY - K0064+000 - K0064+260, K0064+470 - K0064+800, K0065+000 - K0065+140, K0065+355 - K0065+405, K0065+576 - K0065+848, K0065+877 - K0065+1022, K0066 | Region III | Bulacan 2nd DEO | On-Going | ₱68M | 46% | High risk74 | —-0.024 |
| 25CG0255SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF MEXICO-ANGELES ROAD (DIVISORIA AND NUEVA VICTORIA SECTION), MEXICO | Region III | Pampanga 1st DEO | On-Going | ₱56.1M | 0% | High risk73 | —-0.009 |
| 17CJ0033NETWORK DEVELOPMENT - IMPROVEMENT/WIDENING OF NATIONAL ROADS; CAPAS-SAN JOSE-MAYANTOC-MALACAMPA RD, KO125+436 - KO128+000 & KO141+000- KO144+175 | Region III | Tarlac DEO | Completed | ₱126.9M | 100% | High risk73 | —-0.048 |
| 24CG0331FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK, PHASE 3, BARANGAY LACQUIOS, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 22% | High risk72 | Flagged0.047 |
| 24CG0330FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK, PHASE 2, BARANGAY LACQUIOS, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 72% | High risk72 | Flagged0.032 |
| 24CG0329FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK, PHASE 1, BARANGAY LACQUIOS, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 90% | High risk72 | Flagged0.030 |
| 20CJ0150ASSET PRESERVATION PROGRAM CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS MANILA NORTH RD - K0137 + 317 - K0139 + 553 | Region III | Tarlac DEO | Completed | ₱86.8M | 100% | High risk71 | —-0.030 |
| 17CJ0035NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE; TARLAC CITY-SN JOSE VIA TIBAG-BURGOS RD; KO129+214 - KO129+284; KO129+290 - KO131+000; KO129+-827 - KO129+202; KO135+533 - KO136+464; KO136+476-KO136+983 & KO131+000 - KO132+038 | Region III | Tarlac DEO | Completed | ₱78.4M | 100% | High risk71 | —-0.058 |
| 24CD0126UPGRADING OF DAMAGED PAVED ROADS TERTIARY ROADS STA. MARIA-NORZAGARAY RD K0038+000 K0039+000 | Region III | Bulacan 2nd DEO | Completed | ₱40.2M | 100% | High risk70 | —-0.066 |
| 25CD0203REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS STA MARIA-NORZAGARAY RD - K0036+760 - K0036+991, K0037+000 - K0037+080 | Region III | Bulacan 2nd DEO | On-Going | ₱9.8M | 43% | High risk70 | —-0.027 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CG0331FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK, PHASE 3, BARANGAY LACQUIOS, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 22% | High risk72 | Flagged0.047 |
| 24CG0330FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK, PHASE 2, BARANGAY LACQUIOS, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 72% | High risk72 | Flagged0.032 |
| 24CG0329FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK, PHASE 1, BARANGAY LACQUIOS, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 90% | High risk72 | Flagged0.030 |
| 25CG0150SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF EAST LATERAL MEGADIKE ROAD, BARANGAY DEL ROSARIO - BARANGAY LARA S | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 99% | High risk95 | Flagged0.014 |
| 25CG0151SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF EAST LATERAL MEGADIKE ROAD, BARANGAY SAN VICENTE - BARANGAY SAN IS | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 97% | High risk94 | Flagged0.013 |
| 25CD0171CONSTRUCTION OF CONSTANTINO - UBIHAN ROAD DIKE, STA. 0+000 STA. 0+120, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 4% | High risk81 | Flagged0.004 |
| 25CG0152SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD ALONG SETBACK LEVEE, PHASE I, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 0% | High risk77 | Flagged0.004 |
| 25CG0153SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD ALONG SETBACK LEVEE, PHASE II, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 2% | High risk77 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 326 | 23CG0014BRIDGE PROGRAM: RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - GUGU BR. (BO1464LZ) ALONG SN FERNANDO-LUBAO RD | Region III | Pampanga 1st DEO | Completed | ₱23.8M | 100% | Low risk29 | —-0.065 |
| 327 | 18CJ0038CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION/IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG TARLAC RIVER CONTROL LEFT DIKE, PANIQUI SECTION, PANIQUI, TARLAC | Region III | Tarlac DEO | Completed | ₱28.1M | 100% | Low risk29 | —-0.087 |
| 328 | 19CJ0036FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION OF SLOPE PROTECTION ALONG TARLAC RIVER CONTROL, SAN BARTOLOME-SEMBRANO SECTION, GERONA, TARLAC | Region III | Tarlac DEO | Completed | ₱28.3M | 100% | Low risk29 | —-0.087 |
| 329 | 21CK0002ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE ALONG CONCEPCION - CAPAS ROAD, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱6.7M | 100% | Low risk29 | —-0.101 |
| 330 | 18CJ0117ASSET PRESERVATION PROGRAM CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS TARLAC STA. ROSA RD - K0137 + 087 - K0137 + 711 (L/S) | Region III | Tarlac DEO | Completed | ₱9.2M | 100% | Low risk29 | —-0.104 |
| 331 | 18CJ0094CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG TARLAC RIVER CONTROL (RIGHT DIKE), CARANGIAN SECTION (PHASE IV), CARANGIAN, TARLAC CITY | Region III | Tarlac DEO | Completed | ₱23.5M | 100% | Low risk29 | —-0.090 |
| 332 | 22CG0097SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BRIDGE AT CALIBUTBUT, BACOLOR, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱23.6M | 100% | Low risk29 | —-0.062 |
| 333 | 20CG0130BRIDGE PROGRAM: RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - RR CROSSING BR. (B01470LZ) ALONG JOSE ABAD SANTOS AVE (JASA), CITY OF SAN FERNANDO, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱8.5M | 100% | Low risk29 | —-0.062 |
| 334 | 18CJ0014CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION/IMPROVEMENT OF SLOPE PROTECTION ALONG TARLAC RIVER CONTROL RIGHT DIKE, CARDONA SECTION, GERONA, TARLAC | Region III | Tarlac DEO | Completed | ₱23.3M | 100% | Low risk29 | —-0.088 |
| 335 | 18CJ0018CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION/IMPROVEMENT OF SLOPE PROTECTION ALONG TARLAC RIVER CONTROL RIGHT DIKE, VILLA PAZ - CARDONA SECTION, GERONA, TARLAC | Region III | Tarlac DEO | Completed | ₱23.3M | 100% | Low risk29 | —-0.088 |
| 336 | 18CJ0003CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF SLOPE PROTECTION ALONG MASALASA CREEK, BINAUGANAN-MALIWALO SECTION, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱18.7M | 100% | Low risk29 | —-0.090 |
| 337 | 18CK0021REHAB/IMPT OF EXISTING DIKE ALONG RIO CHICO RIVER (LA PURISIMA SECT., R/B), U/S OF RIO CHICO BR., LA | Region III | Tarlac 2nd DEO | Completed | ₱25.4M | 100% | Low risk29 | —-0.093 |
| 338 | 19CJ0033FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG TARLAC RIVER CONTROL RIGHT DIKE, CARDONA - MALAYEP SECTION, GERONA, TARLAC | Region III | Tarlac DEO | Completed | ₱41.4M | 100% | Low risk29 | —-0.089 |
| 339 | 22CJ0123FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MASALASA CREEK, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱43.4M | 100% | Low risk29 | —-0.090 |
| 340 | 19CJ0034FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG TARLAC RIVER CONTROL RIGHT DIKE, MALAYEP - AYSON SECTION (PHASE IV), GERONA, TARLAC | Region III | Tarlac DEO | Completed | ₱34M | 100% | Low risk29 | —-0.090 |
| 341 | 18CJ0065FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION/DESILTING OF UNGOT CREEK, TARLAC CITY (PHASE VI) | Region III | Tarlac DEO | Completed | ₱46.5M | 100% | Low risk29 | —-0.090 |
| 342 | 18CJ0064FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION/DESILTING OF UNGOT CREEK, TARLAC CITY (PHASE V) | Region III | Tarlac DEO | Completed | ₱46.5M | 100% | Low risk29 | —-0.090 |
| 343 | 18CJ0005CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION/IMPROVEMENT OF SLOPE PROTECTION ALONG MASALASA CREEK, STA. 0+000 - STA. 0+282.40, MALIWALO SECTION, LEFT BANK, MALIWALO, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱27.1M | 100% | Low risk29 | —-0.091 |
| 344 | 18CJ0004CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS REHABILITATION/IMPROVEMENT OF SLOPE PROTECTION ALONG MASALASA CREEK, STA. 0+000 - STA. 0+262, SAN MANUEL, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱26.2M | 100% | Low risk29 | —-0.091 |
| 345 | 22CG0067SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF DRAINAGE SYSTEM AT SAN ISIDRO, MACABACLE AND MAGLIMAN, BACOLOR, P | Region III | Pampanga 1st DEO | Completed | ₱37.8M | 100% | Low risk29 | —-0.092 |
| 346 | 22CD0169CONSTRUCTION OF FARM-TO-MARKET ROAD, BARANGAY DULONG BAYAN, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱9.9M | 100% | Low risk26 | —-0.043 |
| 347 | 23CD0073ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE TERTIARY ROADS STA. MARIA BY-PASS RD K0032 + 567 K0032+568, K0033 + 078 K0033 + 239, K00 + 376 K0033 + 379, K0033 + 900 K0033 + 901 | Region III | Bulacan 2nd DEO | Completed | ₱3.1M | 100% | Low risk15 | —-0.100 |