Contractor dossier
347 projects on file, including joint ventures this contractor is part of.
Total projects
347
Total budget
₱25.1B
Average progress
96.2%
Completion rate
90.8%
Average risk score
45.9
Medium risk on average, out of 100
Flagged as unusual
8
2.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 345 | ₱24.8B | 45.8 | 8 | 96.2% |
| Region I | 2 | ₱268.4M | 62.3 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 197 | ₱13.9B | 45.2 | 2 | 95.6% |
| Flood Control and Drainage | 141 | ₱10.5B | 46.0 | 4 | 96.8% |
| Bridges | 3 | ₱55.9M | 29.2 | 0 | 100.0% |
| GAA 2025 SSP | 2 | ₱280.8M | 94.4 | 2 | 97.8% |
| OTHER | 2 | ₱141.6M | 69.5 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱96.5M | 91.2 | 0 | 100.0% |
| Buildings and Facilities | 1 | ₱24.7M | 40.4 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CG0150SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF EAST LATERAL MEGADIKE ROAD, BARANGAY DEL ROSARIO - BARANGAY LARA S | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 99% | High risk95 | Flagged0.014 |
| 25CG0151SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF EAST LATERAL MEGADIKE ROAD, BARANGAY SAN VICENTE - BARANGAY SAN IS | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 97% | High risk94 | Flagged0.013 |
| 25CD0082CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUAYAN RIVER AND ITS TRIBUTARIES, CAINGIN - MEYLAND SECTION, STA. 9+613 - STA. 9+850, MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 100% | High risk91 | —-0.018 |
| 25CD0171CONSTRUCTION OF CONSTANTINO - UBIHAN ROAD DIKE, STA. 0+000 STA. 0+120, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 4% | High risk81 | Flagged0.004 |
| 25CD0020CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SAN JOSE RIVER RIVER, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 100% | High risk81 | —-0.026 |
| 25CD0021CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG NCR/BULACAN BDRY. - BIGTE - IPO DAM ROAD, SAN JOSE RIVER, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 71% | High risk81 | —-0.015 |
| 25CG0153SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD ALONG SETBACK LEVEE, PHASE II, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 2% | High risk77 | Flagged0.003 |
| 25CG0152SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD ALONG SETBACK LEVEE, PHASE I, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 0% | High risk77 | Flagged0.004 |
| 24CD0150CONSTRUCTION OF BYPASS (ALTERNATE) ROAD (PHASE V), BARANGAY MUZON, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱95M | 100% | High risk76 | —-0.056 |
| 24CD0152CONSTRUCTION OF MUZON TO GAYA-GAYA BYPASS ROAD (PHASE V), CITY OF SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱61.2M | 100% | High risk74 | —-0.065 |
| 25CD0182REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS GEN. ALEJO SANTOS HIGHWAY - K0064+000 - K0064+260, K0064+470 - K0064+800, K0065+000 - K0065+140, K0065+355 - K0065+405, K0065+576 - K0065+848, K0065+877 - K0065+1022, K0066 | Region III | Bulacan 2nd DEO | On-Going | ₱68M | 46% | High risk74 | —-0.024 |
| 25CG0255SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF MEXICO-ANGELES ROAD (DIVISORIA AND NUEVA VICTORIA SECTION), MEXICO | Region III | Pampanga 1st DEO | On-Going | ₱56.1M | 0% | High risk73 | —-0.009 |
| 17CJ0033NETWORK DEVELOPMENT - IMPROVEMENT/WIDENING OF NATIONAL ROADS; CAPAS-SAN JOSE-MAYANTOC-MALACAMPA RD, KO125+436 - KO128+000 & KO141+000- KO144+175 | Region III | Tarlac DEO | Completed | ₱126.9M | 100% | High risk73 | —-0.048 |
| 24CG0331FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK, PHASE 3, BARANGAY LACQUIOS, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 22% | High risk72 | Flagged0.047 |
| 24CG0330FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK, PHASE 2, BARANGAY LACQUIOS, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 72% | High risk72 | Flagged0.032 |
| 24CG0329FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK, PHASE 1, BARANGAY LACQUIOS, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 90% | High risk72 | Flagged0.030 |
| 20CJ0150ASSET PRESERVATION PROGRAM CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS MANILA NORTH RD - K0137 + 317 - K0139 + 553 | Region III | Tarlac DEO | Completed | ₱86.8M | 100% | High risk71 | —-0.030 |
| 17CJ0035NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE; TARLAC CITY-SN JOSE VIA TIBAG-BURGOS RD; KO129+214 - KO129+284; KO129+290 - KO131+000; KO129+-827 - KO129+202; KO135+533 - KO136+464; KO136+476-KO136+983 & KO131+000 - KO132+038 | Region III | Tarlac DEO | Completed | ₱78.4M | 100% | High risk71 | —-0.058 |
| 24CD0126UPGRADING OF DAMAGED PAVED ROADS TERTIARY ROADS STA. MARIA-NORZAGARAY RD K0038+000 K0039+000 | Region III | Bulacan 2nd DEO | Completed | ₱40.2M | 100% | High risk70 | —-0.066 |
| 25CD0203REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS STA MARIA-NORZAGARAY RD - K0036+760 - K0036+991, K0037+000 - K0037+080 | Region III | Bulacan 2nd DEO | On-Going | ₱9.8M | 43% | High risk70 | —-0.027 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CG0331FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK, PHASE 3, BARANGAY LACQUIOS, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 22% | High risk72 | Flagged0.047 |
| 24CG0330FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK, PHASE 2, BARANGAY LACQUIOS, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 72% | High risk72 | Flagged0.032 |
| 24CG0329FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK, PHASE 1, BARANGAY LACQUIOS, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 90% | High risk72 | Flagged0.030 |
| 25CG0150SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF EAST LATERAL MEGADIKE ROAD, BARANGAY DEL ROSARIO - BARANGAY LARA S | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 99% | High risk95 | Flagged0.014 |
| 25CG0151SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF EAST LATERAL MEGADIKE ROAD, BARANGAY SAN VICENTE - BARANGAY SAN IS | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 97% | High risk94 | Flagged0.013 |
| 25CD0171CONSTRUCTION OF CONSTANTINO - UBIHAN ROAD DIKE, STA. 0+000 STA. 0+120, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 4% | High risk81 | Flagged0.004 |
| 25CG0152SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD ALONG SETBACK LEVEE, PHASE I, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 0% | High risk77 | Flagged0.004 |
| 25CG0153SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD ALONG SETBACK LEVEE, PHASE II, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 2% | High risk77 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 25CG0135ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROAD - JOSE ABAD SANTOS AVENUE (S01195LZ) - K0094+100 - K0095+000 | Region III | Pampanga 1st DEO | Completed | ₱38.4M | 100% | High risk68 | —-0.067 |
| 27 | 17A00012NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING GAPS CONNECTING NATIONAL ROADS, INCLUDING ROW, MANGATAREM-STA CRUZ ROAD, PANGASINAN 2ND LD, STA.0+000-STA.2+194 | Region I | Region I | Completed | ₱80.4M | 100% | High risk68 | —-0.046 |
| 28 | 24CD0044ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE TERTIARY ROADS STA. MARIA - NORZAGARAY RD K0037+126 K0037+600, K0039+000 K0039+649 | Region III | Bulacan 2nd DEO | Completed | ₱54.9M | 100% | High risk68 | —-0.038 |
| 29 | 16CK0184NETWORK DEV'T., IMPT/WIDENING OF NATL RDS, TERTIARY ROAD ALONG CONCEPCION-LAPAZ ROAD, CONC & LAPAZ, | Region III | Tarlac 2nd DEO | Completed | ₱44.2M | 100% | High risk67 | —-0.066 |
| 30 | 17CJ0061ASSET PRESERVATION OF NATIONAL ROADS, REHAB./ RECONST./UPGRADING OF DAMAGED PAVED NATIONAL ROADS INC. DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4), CAPAS-SAN JOSE-MAYANTOC- MALACAMPA ROAD, KO154+000-KO156+000 | Region III | Tarlac DEO | Completed | ₱29.7M | 100% | High risk66 | —-0.063 |
| 31 | 17CJ0010APNR; REHAB/RECONST/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCL DRAINAGE BASED ON PMS/HDM-4, TARL | Region III | Tarlac DEO | Completed | ₱25.4M | 100% | High risk65 | —-0.067 |
| 32 | 25CD0144CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG STO. CRISTO RIVER, STA. 10+450 STA.10+600, CITY OF SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 56% | High risk63 | —-0.036 |
| 33 | 23CD0157CONCRETING OF BARANGAY STA. LUCIA FMR, BARANGAY STA. LUCIA, ANGAT, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱19.9M | 100% | High risk61 | —-0.011 |
| 34 | 22CG0147SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - IMPROVEMENT OF CANAL SYSTEM AND SERVICE ROAD OF PDRIS, STA. ANA, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱93.1M | 100% | High risk60 | —-0.078 |
| 35 | 16CJ0160CONST. OF SLOPE PROTECTION ALONG RIO CHICO RIVER, VICTORIA, TARLAC, TARLAC 2ND LD | Region III | Tarlac DEO | Completed | ₱22.4M | 100% | Medium risk60 | —-0.007 |
| 36 | 22CD0054CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SAN JOSE RIVER, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱94.6M | 100% | Medium risk59 | —-0.078 |
| 37 | 21CJ0001FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG CAMILING RIVER LEFT BANK, STA. 0+000 - STA. 0+740, CAYAOAN SECTION, CAYAOAN, | Region III | Tarlac DEO | Completed | ₱94.6M | 100% | Medium risk59 | —-0.073 |
| 38 | 21CJ0002FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG CAMILING RIVER RIGHT BANK, STA 0+000 - STA. 0+662, CACAMILINGAN NORTE - TAMB | Region III | Tarlac DEO | Completed | ₱94.6M | 100% | Medium risk59 | —-0.074 |
| 39 | 24CG0003FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION OF ERODED PAMPANGA RIVER BANK AT LACQUIOZ, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱93.6M | 100% | Medium risk59 | —-0.080 |
| 40 | 22CD0004CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG NCR/BULACAN BDRY.-BIGTE IPO DAM ROAD, SAN JOSE RIVER, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱94.2M | 100% | Medium risk59 | —-0.078 |
| 41 | 16CJ0157CONST. OF SLOPE PROTECTION ALONG CAMILING RIVER CONTROL, PAO 1ST SECTION, BRGY. PAO 1ST, CAMILING, T | Region III | Tarlac DEO | Completed | ₱27.8M | 100% | Medium risk59 | —-0.005 |
| 42 | 22CK0097REHABILITATION OF EXISTING DIKE ALONG PARUA RIVER (BRGY. SAN FRANCISCO SECTION, LEFT BANK), STA. 6+675.00 TO 7+119.00), CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱94.5M | 100% | Medium risk59 | —-0.079 |
| 43 | 25CJ0045CONSTRUCTION OF PANIQUI DRAINAGE SYSTEM PHASE 2, PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱94.1M | 49% | Medium risk59 | —-0.030 |
| 44 | 22CK0084REHABILITATION OF EXISTING DIKE ALONG BANGUT RIVER (BRGY. STA. LUCIA SECTION, RIGHT BANK), CAPAS, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱94.5M | 100% | Medium risk59 | —-0.077 |
| 45 | 23CJ0046FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MASALASA CREEK (PHASE II), TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱93.6M | 100% | Medium risk59 | —-0.075 |
| 46 | 22CJ0187FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG CAMILING RIVER RIGHT BANK, SURGUI 1ST - CACAMILINGAN SUR SECTION (PACKAGE | Region III | Tarlac DEO | Completed | ₱93.6M | 100% | Medium risk59 | —-0.073 |
| 47 | 22CK0105REHABILITATION OF EXISTING DIKE ALONG O'DONNELL RIVER (BRGY. STA. JULIANA SECTION, RIGHT BANK), STA. 4+900.00 TO STA. 5+382.00, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱96M | 100% | Medium risk58 | —-0.076 |
| 48 | 22CJ0113SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF SLOPE PROTECTION STRUCTURE WITH STEEL SHEET PILE FOUNDATION ALONG DELINQUENTE CREEK, BACABAC SECTION (PAC | Region III | Tarlac DEO | Completed | ₱94.9M | 100% | Medium risk58 | —-0.073 |
| 49 | 23CJ0025FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OFFLOOD CONTROL STRUCTURE ALONG RIO CHICORIVER (PHASE V), VICTORIA, TARLAC | Region III | Tarlac DEO | Completed | ₱93.6M | 100% | Medium risk58 | —-0.078 |
| 50 | 22CK0101REHABILITATION OF EXISTING DIKE ALONG LUCUNG RIVER (BRGY. SAN RAFAEL SECTION, RIGHT BANK), STA. (-)6+690.00 TO STA. (-)6+310.00, BAMBAN, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱94.5M | 100% | Medium risk58 | —-0.078 |