Contractor dossier
347 projects on file, including joint ventures this contractor is part of.
Total projects
347
Total budget
₱25.1B
Average progress
96.2%
Completion rate
90.8%
Average risk score
45.9
Medium risk on average, out of 100
Flagged as unusual
8
2.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 345 | ₱24.8B | 45.8 | 8 | 96.2% |
| Region I | 2 | ₱268.4M | 62.3 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 197 | ₱13.9B | 45.2 | 2 | 95.6% |
| Flood Control and Drainage | 141 | ₱10.5B | 46.0 | 4 | 96.8% |
| Bridges | 3 | ₱55.9M | 29.2 | 0 | 100.0% |
| GAA 2025 SSP | 2 | ₱280.8M | 94.4 | 2 | 97.8% |
| OTHER | 2 | ₱141.6M | 69.5 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱96.5M | 91.2 | 0 | 100.0% |
| Buildings and Facilities | 1 | ₱24.7M | 40.4 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CG0150SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF EAST LATERAL MEGADIKE ROAD, BARANGAY DEL ROSARIO - BARANGAY LARA S | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 99% | High risk95 | Flagged0.014 |
| 25CG0151SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF EAST LATERAL MEGADIKE ROAD, BARANGAY SAN VICENTE - BARANGAY SAN IS | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 97% | High risk94 | Flagged0.013 |
| 25CD0082CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUAYAN RIVER AND ITS TRIBUTARIES, CAINGIN - MEYLAND SECTION, STA. 9+613 - STA. 9+850, MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 100% | High risk91 | —-0.018 |
| 25CD0171CONSTRUCTION OF CONSTANTINO - UBIHAN ROAD DIKE, STA. 0+000 STA. 0+120, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 4% | High risk81 | Flagged0.004 |
| 25CD0020CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SAN JOSE RIVER RIVER, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 100% | High risk81 | —-0.026 |
| 25CD0021CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG NCR/BULACAN BDRY. - BIGTE - IPO DAM ROAD, SAN JOSE RIVER, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 71% | High risk81 | —-0.015 |
| 25CG0153SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD ALONG SETBACK LEVEE, PHASE II, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 2% | High risk77 | Flagged0.003 |
| 25CG0152SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD ALONG SETBACK LEVEE, PHASE I, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 0% | High risk77 | Flagged0.004 |
| 24CD0150CONSTRUCTION OF BYPASS (ALTERNATE) ROAD (PHASE V), BARANGAY MUZON, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱95M | 100% | High risk76 | —-0.056 |
| 24CD0152CONSTRUCTION OF MUZON TO GAYA-GAYA BYPASS ROAD (PHASE V), CITY OF SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱61.2M | 100% | High risk74 | —-0.065 |
| 25CD0182REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS GEN. ALEJO SANTOS HIGHWAY - K0064+000 - K0064+260, K0064+470 - K0064+800, K0065+000 - K0065+140, K0065+355 - K0065+405, K0065+576 - K0065+848, K0065+877 - K0065+1022, K0066 | Region III | Bulacan 2nd DEO | On-Going | ₱68M | 46% | High risk74 | —-0.024 |
| 25CG0255SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF MEXICO-ANGELES ROAD (DIVISORIA AND NUEVA VICTORIA SECTION), MEXICO | Region III | Pampanga 1st DEO | On-Going | ₱56.1M | 0% | High risk73 | —-0.009 |
| 17CJ0033NETWORK DEVELOPMENT - IMPROVEMENT/WIDENING OF NATIONAL ROADS; CAPAS-SAN JOSE-MAYANTOC-MALACAMPA RD, KO125+436 - KO128+000 & KO141+000- KO144+175 | Region III | Tarlac DEO | Completed | ₱126.9M | 100% | High risk73 | —-0.048 |
| 24CG0331FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK, PHASE 3, BARANGAY LACQUIOS, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 22% | High risk72 | Flagged0.047 |
| 24CG0330FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK, PHASE 2, BARANGAY LACQUIOS, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 72% | High risk72 | Flagged0.032 |
| 24CG0329FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK, PHASE 1, BARANGAY LACQUIOS, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 90% | High risk72 | Flagged0.030 |
| 20CJ0150ASSET PRESERVATION PROGRAM CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS MANILA NORTH RD - K0137 + 317 - K0139 + 553 | Region III | Tarlac DEO | Completed | ₱86.8M | 100% | High risk71 | —-0.030 |
| 17CJ0035NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE; TARLAC CITY-SN JOSE VIA TIBAG-BURGOS RD; KO129+214 - KO129+284; KO129+290 - KO131+000; KO129+-827 - KO129+202; KO135+533 - KO136+464; KO136+476-KO136+983 & KO131+000 - KO132+038 | Region III | Tarlac DEO | Completed | ₱78.4M | 100% | High risk71 | —-0.058 |
| 24CD0126UPGRADING OF DAMAGED PAVED ROADS TERTIARY ROADS STA. MARIA-NORZAGARAY RD K0038+000 K0039+000 | Region III | Bulacan 2nd DEO | Completed | ₱40.2M | 100% | High risk70 | —-0.066 |
| 25CD0203REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS STA MARIA-NORZAGARAY RD - K0036+760 - K0036+991, K0037+000 - K0037+080 | Region III | Bulacan 2nd DEO | On-Going | ₱9.8M | 43% | High risk70 | —-0.027 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CG0331FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK, PHASE 3, BARANGAY LACQUIOS, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 22% | High risk72 | Flagged0.047 |
| 24CG0330FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK, PHASE 2, BARANGAY LACQUIOS, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 72% | High risk72 | Flagged0.032 |
| 24CG0329FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK, PHASE 1, BARANGAY LACQUIOS, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 90% | High risk72 | Flagged0.030 |
| 25CG0150SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF EAST LATERAL MEGADIKE ROAD, BARANGAY DEL ROSARIO - BARANGAY LARA S | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 99% | High risk95 | Flagged0.014 |
| 25CG0151SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF EAST LATERAL MEGADIKE ROAD, BARANGAY SAN VICENTE - BARANGAY SAN IS | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 97% | High risk94 | Flagged0.013 |
| 25CD0171CONSTRUCTION OF CONSTANTINO - UBIHAN ROAD DIKE, STA. 0+000 STA. 0+120, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 4% | High risk81 | Flagged0.004 |
| 25CG0152SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD ALONG SETBACK LEVEE, PHASE I, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 0% | High risk77 | Flagged0.004 |
| 25CG0153SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD ALONG SETBACK LEVEE, PHASE II, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 2% | High risk77 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 23C00065FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONST. OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG CAMILING RIVER (RIGHT BANK), BAYBAYAOAS-TELBANG SECT. (PACKAGE R), CAMILIN | Region III | Region III | Completed | ₱144.7M | 100% | Medium risk58 | —-0.060 |
| 52 | 18CJ0097CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURES (INCLUDING DESILTING) ALONG MASALASA CREEK, (PHASE I) UPSTREAM, TARLAC CITY | Region III | Tarlac DEO | Completed | ₱93.6M | 100% | Medium risk58 | —-0.077 |
| 53 | 18CJ0098CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL STRUCTURES (INCLUDING DESILTING) ALONG MASALASA CREEK, (PHASE II) DOWNSTREAM, TARLAC CITY | Region III | Tarlac DEO | Completed | ₱93.6M | 100% | Medium risk58 | —-0.077 |
| 54 | 22CJ0172SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF CAMILING-AGNO RIVER FLOODWAY PHASE 2, TARLAC | Region III | Tarlac DEO | Completed | ₱94.5M | 100% | Medium risk58 | —-0.071 |
| 55 | 22CJ0183FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG MORIONES - TARLAC RIVER CONTROL (PACKAGE A), BALANTI SECTION, BALANTI, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱93.6M | 100% | Medium risk58 | —-0.077 |
| 56 | 22CJ0186FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG CAMILING RIVER (PACKAQE B - RIGHT BANK), SAWAT - BILAD SECTION, CAMILING, | Region III | Tarlac DEO | Completed | ₱93.6M | 100% | Medium risk58 | —-0.076 |
| 57 | 22CJ0185FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG TARLAC RIVER CONTROL LEFT DIKE, TIBAGAN-TIBAG SECTION PACKAGE C, TARLAC CITV, TARLAC | Region III | Tarlac DEO | Completed | ₱93.6M | 100% | Medium risk58 | —-0.076 |
| 58 | 22CK0100REHABILITATION OF DIKE ALONG RIO CHICO RIVER DOWNSTREAM OF RIO CHICO BRIDGE, STA. 0+943.75 TO STA. 1+349.75 (BRGY. SAN ROQUE SECTION, RIGHT BANK), LA PAZ, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱94.5M | 100% | Medium risk58 | —-0.079 |
| 59 | 22CJ0188FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG CAMILING RIVER RIGHT BANK, SURGUI 1ST - CACAMILINGAN SUR SECTION (PACKAGE | Region III | Tarlac DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.071 |
| 60 | 22CJ0184FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG TARLAC RIVER CONTROL LEFT DIKE, TIBAGAN-TIBAG SECTION PACKAGE B, TARLAC CITV, TARLAC | Region III | Tarlac DEO | Completed | ₱93.6M | 100% | Medium risk58 | —-0.076 |
| 61 | 24CD0057CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN JOSE RIVER (BIGTE IPO DAM ROAD), SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.080 |
| 62 | 25CK0068REHABILITATION OF DIKE ALONG O'DONNELL RIVER, RIGHT BANK OF BARANGAY STA. LUCIA SECTION, SEGMENT B, STA. 2 + 837.75 TO STA. 3 + 119.83, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.5M | 100% | Medium risk58 | —-0.049 |
| 63 | 16CJ0161CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM/REHABILITATION/IMPROVEMENT/ DESILTING OF MASALASA CREEK, AMUCAO SECTION, TARLAC CITY, TARLAC 2ND L.D. | Region III | Tarlac DEO | Completed | ₱10.5M | 100% | Medium risk58 | —-0.010 |
| 64 | 25CJ0027CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BAKET-BAKET RIVER (SEGMENT 12), MONCADA, TARLAC | Region III | Tarlac DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.073 |
| 65 | 22CJ0193FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG CAMILING RIVER, POBLACION D TO G SECTION (PACKAGE C), CAMILING, TARLAC | Region III | Tarlac DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.073 |
| 66 | 24CJ0010FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG RIO CHICO RIVER (SEGMENT K), VICTORIA, TARLAC | Region III | Tarlac DEO | Completed | ₱99M | 100% | Medium risk58 | —-0.075 |
| 67 | 24CJ0013FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG RIO CHICO RIVER (SEGMENT L), VICTORIA, TARLAC | Region III | Tarlac DEO | Completed | ₱99M | 100% | Medium risk58 | —-0.076 |
| 68 | 23CJ0005FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF CAMILING RIVER LEFT BANK, ANOLING 3RD TO PAO 1ST SECTION PACKAGE A, CAMILING, TARLAC | Region III | Tarlac DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.074 |
| 69 | 23CJ0009FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF CAMILING RIVER LEFT BANK, ANOLING 3RD TO PAO 1ST SECTION PACKAGE B, CAMILING, TARLAC | Region III | Tarlac DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.074 |
| 70 | 24CK0032REHABILITATION OF DIKE ALONG O'DONNELL RIVER, (BARANGAY STA. JULIANA SECTION, RIGHT BANK), PHASE 1, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.076 |
| 71 | 24CD0077CONSTRUCTION OF DIKE ALONG SANTO CRISTO RIVER, BARANGAY DULONG BAYAN, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.080 |
| 72 | 22CD0209CONSTRUCTION OF SLOPE PROTECTION, PANAKLAYAN, BRGY. GRACEVILLE TO BRGY. GAYA-GAYA, CITY OF SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.078 |
| 73 | 22C00083FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF CAMILING-AGNO RIVER FLOODWAY, TARLAC (PHASE 3), PROVINCE OF TARLAC | Region III | Region III | Completed | ₱289.5M | 100% | Medium risk57 | —-0.044 |
| 74 | 23CD0062CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG NCR/BULACAN BDRY. BIGTE IPO DAM ROAD, SAN JOSE RIVER, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.078 |
| 75 | 23CD0067CONSTRUCTION OF FLOOD CONTROL STRUCTURE SAN JOSE RIVER, SAN JOSE DEL MONTE CITY, BULACANCONTRACT LOCATION: SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.078 |