Contractor dossier
347 projects on file, including joint ventures this contractor is part of.
Total projects
347
Total budget
₱25.1B
Average progress
96.2%
Completion rate
90.8%
Average risk score
45.9
Medium risk on average, out of 100
Flagged as unusual
8
2.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 345 | ₱24.8B | 45.8 | 8 | 96.2% |
| Region I | 2 | ₱268.4M | 62.3 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 197 | ₱13.9B | 45.2 | 2 | 95.6% |
| Flood Control and Drainage | 141 | ₱10.5B | 46.0 | 4 | 96.8% |
| Bridges | 3 | ₱55.9M | 29.2 | 0 | 100.0% |
| GAA 2025 SSP | 2 | ₱280.8M | 94.4 | 2 | 97.8% |
| OTHER | 2 | ₱141.6M | 69.5 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱96.5M | 91.2 | 0 | 100.0% |
| Buildings and Facilities | 1 | ₱24.7M | 40.4 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CG0150SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF EAST LATERAL MEGADIKE ROAD, BARANGAY DEL ROSARIO - BARANGAY LARA S | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 99% | High risk95 | Flagged0.014 |
| 25CG0151SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF EAST LATERAL MEGADIKE ROAD, BARANGAY SAN VICENTE - BARANGAY SAN IS | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 97% | High risk94 | Flagged0.013 |
| 25CD0082CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUAYAN RIVER AND ITS TRIBUTARIES, CAINGIN - MEYLAND SECTION, STA. 9+613 - STA. 9+850, MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96.5M | 100% | High risk91 | —-0.018 |
| 25CD0171CONSTRUCTION OF CONSTANTINO - UBIHAN ROAD DIKE, STA. 0+000 STA. 0+120, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 4% | High risk81 | Flagged0.004 |
| 25CD0020CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SAN JOSE RIVER RIVER, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 100% | High risk81 | —-0.026 |
| 25CD0021CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG NCR/BULACAN BDRY. - BIGTE - IPO DAM ROAD, SAN JOSE RIVER, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 71% | High risk81 | —-0.015 |
| 25CG0153SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD ALONG SETBACK LEVEE, PHASE II, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 2% | High risk77 | Flagged0.003 |
| 25CG0152SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD ALONG SETBACK LEVEE, PHASE I, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 0% | High risk77 | Flagged0.004 |
| 24CD0150CONSTRUCTION OF BYPASS (ALTERNATE) ROAD (PHASE V), BARANGAY MUZON, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱95M | 100% | High risk76 | —-0.056 |
| 24CD0152CONSTRUCTION OF MUZON TO GAYA-GAYA BYPASS ROAD (PHASE V), CITY OF SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱61.2M | 100% | High risk74 | —-0.065 |
| 25CD0182REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS GEN. ALEJO SANTOS HIGHWAY - K0064+000 - K0064+260, K0064+470 - K0064+800, K0065+000 - K0065+140, K0065+355 - K0065+405, K0065+576 - K0065+848, K0065+877 - K0065+1022, K0066 | Region III | Bulacan 2nd DEO | On-Going | ₱68M | 46% | High risk74 | —-0.024 |
| 25CG0255SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF MEXICO-ANGELES ROAD (DIVISORIA AND NUEVA VICTORIA SECTION), MEXICO | Region III | Pampanga 1st DEO | On-Going | ₱56.1M | 0% | High risk73 | —-0.009 |
| 17CJ0033NETWORK DEVELOPMENT - IMPROVEMENT/WIDENING OF NATIONAL ROADS; CAPAS-SAN JOSE-MAYANTOC-MALACAMPA RD, KO125+436 - KO128+000 & KO141+000- KO144+175 | Region III | Tarlac DEO | Completed | ₱126.9M | 100% | High risk73 | —-0.048 |
| 24CG0331FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK, PHASE 3, BARANGAY LACQUIOS, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 22% | High risk72 | Flagged0.047 |
| 24CG0330FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK, PHASE 2, BARANGAY LACQUIOS, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 72% | High risk72 | Flagged0.032 |
| 24CG0329FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK, PHASE 1, BARANGAY LACQUIOS, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 90% | High risk72 | Flagged0.030 |
| 20CJ0150ASSET PRESERVATION PROGRAM CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS MANILA NORTH RD - K0137 + 317 - K0139 + 553 | Region III | Tarlac DEO | Completed | ₱86.8M | 100% | High risk71 | —-0.030 |
| 17CJ0035NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE; TARLAC CITY-SN JOSE VIA TIBAG-BURGOS RD; KO129+214 - KO129+284; KO129+290 - KO131+000; KO129+-827 - KO129+202; KO135+533 - KO136+464; KO136+476-KO136+983 & KO131+000 - KO132+038 | Region III | Tarlac DEO | Completed | ₱78.4M | 100% | High risk71 | —-0.058 |
| 24CD0126UPGRADING OF DAMAGED PAVED ROADS TERTIARY ROADS STA. MARIA-NORZAGARAY RD K0038+000 K0039+000 | Region III | Bulacan 2nd DEO | Completed | ₱40.2M | 100% | High risk70 | —-0.066 |
| 25CD0203REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS STA MARIA-NORZAGARAY RD - K0036+760 - K0036+991, K0037+000 - K0037+080 | Region III | Bulacan 2nd DEO | On-Going | ₱9.8M | 43% | High risk70 | —-0.027 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CG0331FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK, PHASE 3, BARANGAY LACQUIOS, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 22% | High risk72 | Flagged0.047 |
| 24CG0330FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK, PHASE 2, BARANGAY LACQUIOS, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 72% | High risk72 | Flagged0.032 |
| 24CG0329FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED PAMPANGA RIVER BANK, PHASE 1, BARANGAY LACQUIOS, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 90% | High risk72 | Flagged0.030 |
| 25CG0150SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF EAST LATERAL MEGADIKE ROAD, BARANGAY DEL ROSARIO - BARANGAY LARA S | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 99% | High risk95 | Flagged0.014 |
| 25CG0151SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF EAST LATERAL MEGADIKE ROAD, BARANGAY SAN VICENTE - BARANGAY SAN IS | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 97% | High risk94 | Flagged0.013 |
| 25CD0171CONSTRUCTION OF CONSTANTINO - UBIHAN ROAD DIKE, STA. 0+000 STA. 0+120, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 4% | High risk81 | Flagged0.004 |
| 25CG0152SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD ALONG SETBACK LEVEE, PHASE I, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 0% | High risk77 | Flagged0.004 |
| 25CG0153SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD ALONG SETBACK LEVEE, PHASE II, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 2% | High risk77 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 24CJ0004FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG RIO CHICO RIVER (SECTION C), VICTORIA, TARLAC | Region III | Tarlac DEO | Completed | ₱93M | 100% | Medium risk54 | —-0.077 |
| 102 | 25CG0181NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ARAYAT - MAGALANG BYPASS ROAD, PHASE II PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱140.4M | 83% | Medium risk53 | —-0.050 |
| 103 | 25CJ0264CONSTRUCTION OF ROAD ALONG SAN JOSE TARLAC - PALAUIG ZAMBALES ROAD (SEGMENT 1), SAN JOSE, TARLAC | Region III | Tarlac DEO | On-Going | ₱95.4M | 18% | Medium risk53 | —-0.038 |
| 104 | 25CK0099ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE - TERTIARY ROADS ALONG TARLAC - ZAMBALES ROAD, K0120+500 TO K0121+000, K0122+800 TO K0123+000, K0123+000 TO K0124+811, K0124+811 TO K0125+000, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱94M | 95% | Medium risk53 | —-0.062 |
| 105 | 24CG0223ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE - PRIMARY ROADS - MANILA NORTH RD. K0069+410 - K0069+746, K0071+384 - K0071+614, K0074+351 - K0074+537, K0080+443.50 - K0080+837.60 | Region III | Pampanga 1st DEO | Completed | ₱93.6M | 100% | Medium risk53 | —-0.091 |
| 106 | 20CJ0177CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS CONSTRUCTION OF BYPASS AND DIVERSION ROADS JOSE V. YAP SR. ACCESS ROAD, TARLAC | Region III | Tarlac DEO | Completed | ₱94.6M | 100% | Medium risk53 | —-0.089 |
| 107 | 25CG0041NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ARAYAT - MAGALANG BY-PASS ROAD, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱93.6M | 93% | Medium risk53 | —-0.062 |
| 108 | 24CJ0088CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG O'DONELL RIVER CONTROL, MORIONES - BALANTI SECTION (SECTION D), TARLAC | Region III | Tarlac DEO | Completed | ₱93M | 100% | Medium risk53 | —-0.076 |
| 109 | 24CG0209ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE - PRIMARY ROADS - MANILA NORTH RD - K0077+617 - K0078+990 | Region III | Pampanga 1st DEO | Completed | ₱93.6M | 100% | Medium risk53 | —-0.090 |
| 110 | 25CJ0265CONSTRUCTION OF STO. DOMINGO - LAWACAMULAG DIVERSION ROAD (SEGMENT 4), TARLAC | Region III | Tarlac DEO | On-Going | ₱95.4M | 8% | Medium risk53 | —-0.034 |
| 111 | 22CK0039ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE ALONG BAMBAN POBLACION ROAD, BAMBAN, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱94.5M | 100% | Medium risk52 | —-0.091 |
| 112 | 25CJ0261CONSTRUCTION OF STO. DOMINGO - LAWACAMULAG DIVERSION ROAD (SEGMENT 3), TARLAC | Region III | Tarlac DEO | On-Going | ₱95.5M | 9% | Medium risk52 | —-0.034 |
| 113 | 22CJ0116SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) CONSTRUCTION OF TARLAC RIVER LEFT DIKE DIVERSION ROAD (PACKAGE D), TARLAC | Region III | Tarlac DEO | Completed | ₱94.9M | 100% | Medium risk52 | —-0.088 |
| 114 | 22CJ0106SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) CONSTRUCTION OF TARLAC RIVER LEFT DIKE DIVERSION ROAD (PACKAGE C), TARLAC | Region III | Tarlac DEO | Completed | ₱94.9M | 100% | Medium risk52 | —-0.089 |
| 115 | 22CK0013ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE ALONG TARLAC - ZAMBALES ROAD, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱94.6M | 100% | Medium risk52 | —-0.090 |
| 116 | 24CG0189ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - JOSE ABAD SANTOS AVE (JASA) (S01195LZ) - K0095+030 - K0096+000 | Region III | Pampanga 1st DEO | Completed | ₱93.6M | 100% | Medium risk52 | —-0.093 |
| 117 | 23CG0118NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS * ARAYAT - MAGALANG BY-PASS ROAD, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱93.6M | 100% | Medium risk52 | —-0.093 |
| 118 | 24CG0072NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - ARAYAT - MAGALANG BYPASS ROAD (PACKAGE 1), PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱93.6M | 100% | Medium risk52 | —-0.093 |
| 119 | 22CJ0091SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) CONSTRUCTION OF TARLAC RIVER LEFT DIKE DIVERSION ROAD (PACKAGE B), TARLAC | Region III | Tarlac DEO | Completed | ₱94.8M | 100% | Medium risk52 | —-0.089 |
| 120 | 22CJ0097NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS TARLAC CITY NORTHWESTERN ALTERNATE ROUTE (SAN ISIDRO-AGUSO), TARLAC | Region III | Tarlac DEO | Completed | ₱94.9M | 100% | Medium risk52 | —-0.090 |
| 121 | 24CJ0353REPAIR/REHABILITATION/IMPROVEMENT OF SLOPE PROTECTION ALONG CAMILING RIVER, CACAMILINGAN SUR - CAYAOAN - BACABAC SECTION (SEGMENT A), CAMILING, TARLAC | Region III | Tarlac DEO | Completed | ₱120.6M | 100% | Medium risk52 | —-0.083 |
| 122 | 22CJ0087SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) CONSTRUCTION OF TARLAC RIVER LEFT DIKE DIVERSION ROAD (PACKAGE A), TARLAC | Region III | Tarlac DEO | Completed | ₱94.9M | 100% | Medium risk52 | —-0.089 |
| 123 | 23CJ0230ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE ROMULO H-WAY - K0161 + 206 - K0162 + 770 | Region III | Tarlac DEO | Completed | ₱95.5M | 100% | Medium risk52 | —-0.087 |
| 124 | 22CJ0217SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF MANILA NORTH ROAD TO PCWR VIA SAPANG BURGOS, PANIQUI, TARLAC | Region III | Tarlac DEO | Completed | ₱94.6M | 100% | Medium risk51 | —-0.089 |
| 125 | 23CJ0250SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF TARLAC CITY SOUTHWEST DIVERSION ROAD (PACKAGE P), TARLAC CITY | Region III | Tarlac DEO | Completed | ₱95.5M | 100% | Medium risk51 | —-0.090 |