Opening the dossier…
Opening the dossier…
Contractor dossier
80 projects on file, including joint ventures this contractor is part of.
Total projects
80
Total budget
₱3.8B
Average progress
94.3%
Completion rate
87.5%
Average risk score
51.7
Medium risk on average, out of 100
Flagged as unusual
7
8.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 80 | ₱3.8B | 51.7 | 7 | 94.3% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 41 | ₱1.4B | 47.5 | 0 | 100.0% |
| Flood Control and Drainage | 23 | ₱1.1B | 48.7 | 1 | 100.0% |
| Buildings and Facilities | 5 | ₱83.1M | 52.5 | 0 | 100.0% |
| Bridges | 4 | ₱150.5M | 47.2 | 0 | 100.0% |
| GAA 2025 OO-2 | 3 | ₱280.8M | 94.2 | 3 | 12.5% |
| OTHER | 3 | ₱657M | 80.5 | 2 | 66.9% |
| GAA 2025 OO-1 | 1 | ₱38M | 92.8 | 1 | 3.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BF0057OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL PROJECT, (SAN JOSE SECTION PHASE II) ROXAS, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱93.6M | 38% | High risk94 | Flagged0.013 |
| 25BF0053OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, (MARCOS SECTION PHASE 2), BARANGAY MARCOS, ROXAS, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱93.6M | 0% | High risk94 | Flagged0.021 |
| 25BF0052OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, (MARCOS SECTION PHASE 1), BARANGAY MARCOS, ROXAS, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱93.6M | 0% | High risk94 | Flagged0.021 |
| 25BF0102OO1: NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MALLIG BYPASS ROAD, PACKAGE 1, ISABELA, MALLIG, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱38M | 3% | High risk93 | Flagged0.022 |
| 19B00044ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: REPLACEMENT OF PERMANENT WEAK BRIDGES: SIFFU BRIDGE (B01157LZ) ALONG SANTIAGO-TUGUEGARAO ROAD, ROXAS, ISABELA | Region II | Region II | On-Going | ₱542.4M | 91% | High risk83 | Flagged0.066 |
| 24BF0068ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTRO | Region II | Isabela 2nd DEO | Completed | ₱96.5M | 100% | High risk81 | —-0.007 |
| 25BF0103CONSTRUCTION OF MULTI-PURPOSE BUILDING, DPWH ISABELA 2ND DEO, ROXAS ISABELA 2ND DEO | Region II | Isabela 2nd DEO | On-Going | ₱18.1M | 10% | High risk77 | Flagged0.027 |
| 17B00016MFO 1: NAT'L ROAD NETWORK SERVICES: NETWORK DEV'T: IMPV'T/WIDENING OF NAT'L ROADS OUTSIDE N1 ALONG SANTIAGO-TUGUEGARAO ROAD, K0399+000 TO K0402+440 (STA. 399+000 TO STA. 402+444), QUEZON, ISABELA | Region II | Region II | Completed | ₱125.7M | 100% | High risk68 | —-0.030 |
| 17B00010MFO 1- NATIONAL ROAD NETWORK SERVICES: NETWORK DEV'T: IMP'T/WIDENING OF NAT'L ROADS-OTHER PRIMARY ROADS-SANTIAGO-TUGUEGARAO ROAD, K0419+100- K0423+800=STA. 419+100-STA. 423+816.60, STA. MARIA, ISABELA | Region II | Region II | Completed | ₱139M | 100% | High risk68 | —-0.025 |
| 17BF0030ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4(HDM-4)-PRIMARY ROADS,SANTIAGO-TUGUEGARAO ROAD K0395+14 | Region II | Isabela 2nd DEO | Completed | ₱52.8M | 100% | High risk67 | —-0.033 |
| 17BF0060CONSTRUCTION OF MULTI-PURPOSE HALL (EMPLOYEES QUARTER) WITH CARPORT, DPWH-ISDEO, ROXAS, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱5.2M | 100% | High risk65 | —-0.059 |
| 17BF0048ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS ALONG NAGUILIAN-SAN MARIANO ROAD; K0397+216-K0397+276, K0401+080-K0401+225, K0401+-145-K0401+080, K0401+300-K0401+ | Region II | Isabela 2nd DEO | Completed | ₱42.4M | 100% | High risk65 | —-0.050 |
| 17BF0032NETWORK DEVELOPMENT: OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE-TERTIARY ROAD ALONG NAGUILIAN-SAN MARIANO ROAD, K0408+000-K0409+000, K0409+794-K0409+821, K0409+821-K0409+934, K0409+976-K0410+112, K0410+203-K0410+280, K0410+280-K0410+520, K0410+540-K04 | Region II | Isabela 2nd DEO | Completed | ₱36.6M | 100% | High risk65 | —-0.051 |
| 17BF0006REPAIR/REHABILITATION/CONCRETING OF ROAD, BRGY. OLD-SAN MARIANO BRGY. MINANGA, SAN MARIANO, ISABELA 2ND LD, SAN MARIANO, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱9.4M | 100% | High risk64 | —-0.053 |
| 24BF0063ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CONT | Region II | Isabela 2nd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.052 |
| 23BG0128OO2 - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL PROJECT, BARANGAY ZONE 1, SAN MARIANO, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱96.3M | 100% | High risk62 | —-0.053 |
| 23BG0126OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHAB OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL PROJECT, BRGY DIPUSU, SAN MARIANO | Region II | Isabela 3rd DEO | Completed | ₱96.4M | 100% | High risk62 | —-0.055 |
| 22BF0076ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT (OLANGO SECTION), MALLIG, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.053 |
| 24BF0032ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- | Region II | Isabela 2nd DEO | Completed | ₱96.2M | 100% | High risk62 | —-0.055 |
| 18B00008OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONST'N / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: FLOOD CONTROL/URGENT RIVER BANK PROTECTION WORKS, PHASE I, SAN PLACIDO, ROXAS, ISABELA | Region II | Region II | Completed | ₱93.3M | 100% | High risk61 | —-0.054 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19B00044ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: REPLACEMENT OF PERMANENT WEAK BRIDGES: SIFFU BRIDGE (B01157LZ) ALONG SANTIAGO-TUGUEGARAO ROAD, ROXAS, ISABELA | Region II | Region II | On-Going | ₱542.4M | 91% | High risk83 | Flagged0.066 |
| 25BF0103CONSTRUCTION OF MULTI-PURPOSE BUILDING, DPWH ISABELA 2ND DEO, ROXAS ISABELA 2ND DEO | Region II | Isabela 2nd DEO | On-Going | ₱18.1M | 10% | High risk77 | Flagged0.027 |
| 25BF0102OO1: NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MALLIG BYPASS ROAD, PACKAGE 1, ISABELA, MALLIG, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱38M | 3% | High risk93 | Flagged0.022 |
| 25BF0053OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, (MARCOS SECTION PHASE 2), BARANGAY MARCOS, ROXAS, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱93.6M | 0% | High risk94 | Flagged0.021 |
| 25BF0052OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, (MARCOS SECTION PHASE 1), BARANGAY MARCOS, ROXAS, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱93.6M | 0% | High risk94 | Flagged0.021 |
| 25BF0057OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL PROJECT, (SAN JOSE SECTION PHASE II) ROXAS, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱93.6M | 38% | High risk94 | Flagged0.013 |
| 17BF0106REPAIR/REHABILITATION OF FLOOD CONTROL AT APIAT SECTION, AURORA, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱5.5M | 100% | Medium risk54 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25BF0057OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL PROJECT, (SAN JOSE SECTION PHASE II) ROXAS, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱93.6M | 38% | High risk94 | Flagged0.013 |
| 2 | 25BF0053OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, (MARCOS SECTION PHASE 2), BARANGAY MARCOS, ROXAS, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱93.6M | 0% | High risk94 | Flagged0.021 |
| 3 | 25BF0052OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, (MARCOS SECTION PHASE 1), BARANGAY MARCOS, ROXAS, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱93.6M | 0% | High risk94 | Flagged0.021 |
| 4 | 25BF0102OO1: NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MALLIG BYPASS ROAD, PACKAGE 1, ISABELA, MALLIG, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱38M | 3% | High risk93 | Flagged0.022 |
| 5 | 19B00044ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: REPLACEMENT OF PERMANENT WEAK BRIDGES: SIFFU BRIDGE (B01157LZ) ALONG SANTIAGO-TUGUEGARAO ROAD, ROXAS, ISABELA | Region II | Region II | On-Going | ₱542.4M | 91% | High risk83 | Flagged0.066 |
| 6 | 24BF0068ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTRO | Region II | Isabela 2nd DEO | Completed | ₱96.5M | 100% | High risk81 | —-0.007 |
| 7 | 25BF0103CONSTRUCTION OF MULTI-PURPOSE BUILDING, DPWH ISABELA 2ND DEO, ROXAS ISABELA 2ND DEO | Region II | Isabela 2nd DEO | On-Going | ₱18.1M | 10% | High risk77 | Flagged0.027 |
| 8 | 17B00016MFO 1: NAT'L ROAD NETWORK SERVICES: NETWORK DEV'T: IMPV'T/WIDENING OF NAT'L ROADS OUTSIDE N1 ALONG SANTIAGO-TUGUEGARAO ROAD, K0399+000 TO K0402+440 (STA. 399+000 TO STA. 402+444), QUEZON, ISABELA | Region II | Region II | Completed | ₱125.7M | 100% | High risk68 | —-0.030 |
| 9 | 17B00010MFO 1- NATIONAL ROAD NETWORK SERVICES: NETWORK DEV'T: IMP'T/WIDENING OF NAT'L ROADS-OTHER PRIMARY ROADS-SANTIAGO-TUGUEGARAO ROAD, K0419+100- K0423+800=STA. 419+100-STA. 423+816.60, STA. MARIA, ISABELA | Region II | Region II | Completed | ₱139M | 100% | High risk68 | —-0.025 |
| 10 | 17BF0030ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4(HDM-4)-PRIMARY ROADS,SANTIAGO-TUGUEGARAO ROAD K0395+14 | Region II | Isabela 2nd DEO | Completed | ₱52.8M | 100% | High risk67 | —-0.033 |
| 11 | 17BF0060CONSTRUCTION OF MULTI-PURPOSE HALL (EMPLOYEES QUARTER) WITH CARPORT, DPWH-ISDEO, ROXAS, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱5.2M | 100% | High risk65 | —-0.059 |
| 12 | 17BF0048ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS ALONG NAGUILIAN-SAN MARIANO ROAD; K0397+216-K0397+276, K0401+080-K0401+225, K0401+-145-K0401+080, K0401+300-K0401+ | Region II | Isabela 2nd DEO | Completed | ₱42.4M | 100% | High risk65 | —-0.050 |
| 13 | 17BF0032NETWORK DEVELOPMENT: OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE-TERTIARY ROAD ALONG NAGUILIAN-SAN MARIANO ROAD, K0408+000-K0409+000, K0409+794-K0409+821, K0409+821-K0409+934, K0409+976-K0410+112, K0410+203-K0410+280, K0410+280-K0410+520, K0410+540-K04 | Region II | Isabela 2nd DEO | Completed | ₱36.6M | 100% | High risk65 | —-0.051 |
| 14 | 17BF0006REPAIR/REHABILITATION/CONCRETING OF ROAD, BRGY. OLD-SAN MARIANO BRGY. MINANGA, SAN MARIANO, ISABELA 2ND LD, SAN MARIANO, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱9.4M | 100% | High risk64 | —-0.053 |
| 15 | 24BF0063ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CONT | Region II | Isabela 2nd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.052 |
| 16 | 23BG0128OO2 - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL PROJECT, BARANGAY ZONE 1, SAN MARIANO, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱96.3M | 100% | High risk62 | —-0.053 |
| 17 | 23BG0126OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHAB OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL PROJECT, BRGY DIPUSU, SAN MARIANO | Region II | Isabela 3rd DEO | Completed | ₱96.4M | 100% | High risk62 | —-0.055 |
| 18 | 22BF0076ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT (OLANGO SECTION), MALLIG, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.053 |
| 19 | 24BF0032ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- | Region II | Isabela 2nd DEO | Completed | ₱96.2M | 100% | High risk62 | —-0.055 |
| 20 | 18B00008OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONST'N / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: FLOOD CONTROL/URGENT RIVER BANK PROTECTION WORKS, PHASE I, SAN PLACIDO, ROXAS, ISABELA | Region II | Region II | Completed | ₱93.3M | 100% | High risk61 | —-0.054 |
| 21 | 24BF0028OO1: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MALLIG BYPASS ROAD, PACKAGE 1, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱94.4M | 100% | Medium risk57 | —-0.040 |
| 22 | 22B00022OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT CONSTRUCTION OF MISSING LINKS/NEW ROAD - ROXAS-PARACELIS ROAD, ISABELA | Region II | Region II | Completed | ₱99.4M | 100% | Medium risk55 | —-0.068 |
| 23 | 17BF0106REPAIR/REHABILITATION OF FLOOD CONTROL AT APIAT SECTION, AURORA, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱5.5M | 100% | Medium risk54 | Flagged0.008 |
| 24 | 24BG0132CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BRIDGE, BARANGAY DISULAP, SAN MARIANO, ISABELA | Region II | Isabela 3rd DEO | On-Going | ₱72.3M | 100% | Medium risk53 | —-0.015 |
| 25 | 18BE0112REHABILITATION OF MULTI-PURPOSE BUILDING(GYMNASIUM) CABAGAN, ISABELA | Region II | Isabela 1st DEO | Completed | ₱23.7M | 100% | Medium risk52 | —-0.080 |