Contractor dossier
80 projects on file, including joint ventures this contractor is part of.
Total projects
80
Total budget
₱3.8B
Average progress
94.3%
Completion rate
87.5%
Average risk score
51.7
Medium risk on average, out of 100
Flagged as unusual
7
8.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 80 | ₱3.8B | 51.7 | 7 | 94.3% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 41 | ₱1.4B | 47.5 | 0 | 100.0% |
| Flood Control and Drainage | 23 | ₱1.1B | 48.7 | 1 | 100.0% |
| Buildings and Facilities | 5 | ₱83.1M | 52.5 | 0 | 100.0% |
| Bridges | 4 | ₱150.5M | 47.2 | 0 | 100.0% |
| GAA 2025 OO-2 | 3 | ₱280.8M | 94.2 | 3 | 12.5% |
| OTHER | 3 | ₱657M | 80.5 | 2 | 66.9% |
| GAA 2025 OO-1 | 1 | ₱38M | 92.8 | 1 | 3.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BF0057OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL PROJECT, (SAN JOSE SECTION PHASE II) ROXAS, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱93.6M | 38% | High risk94 | Flagged0.013 |
| 25BF0053OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, (MARCOS SECTION PHASE 2), BARANGAY MARCOS, ROXAS, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱93.6M | 0% | High risk94 | Flagged0.021 |
| 25BF0052OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, (MARCOS SECTION PHASE 1), BARANGAY MARCOS, ROXAS, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱93.6M | 0% | High risk94 | Flagged0.021 |
| 25BF0102OO1: NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MALLIG BYPASS ROAD, PACKAGE 1, ISABELA, MALLIG, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱38M | 3% | High risk93 | Flagged0.022 |
| 19B00044ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: REPLACEMENT OF PERMANENT WEAK BRIDGES: SIFFU BRIDGE (B01157LZ) ALONG SANTIAGO-TUGUEGARAO ROAD, ROXAS, ISABELA | Region II | Region II | On-Going | ₱542.4M | 91% | High risk83 | Flagged0.066 |
| 24BF0068ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTRO | Region II | Isabela 2nd DEO | Completed | ₱96.5M | 100% | High risk81 | —-0.007 |
| 25BF0103CONSTRUCTION OF MULTI-PURPOSE BUILDING, DPWH ISABELA 2ND DEO, ROXAS ISABELA 2ND DEO | Region II | Isabela 2nd DEO | On-Going | ₱18.1M | 10% | High risk77 | Flagged0.027 |
| 17B00016MFO 1: NAT'L ROAD NETWORK SERVICES: NETWORK DEV'T: IMPV'T/WIDENING OF NAT'L ROADS OUTSIDE N1 ALONG SANTIAGO-TUGUEGARAO ROAD, K0399+000 TO K0402+440 (STA. 399+000 TO STA. 402+444), QUEZON, ISABELA | Region II | Region II | Completed | ₱125.7M | 100% | High risk68 | —-0.030 |
| 17B00010MFO 1- NATIONAL ROAD NETWORK SERVICES: NETWORK DEV'T: IMP'T/WIDENING OF NAT'L ROADS-OTHER PRIMARY ROADS-SANTIAGO-TUGUEGARAO ROAD, K0419+100- K0423+800=STA. 419+100-STA. 423+816.60, STA. MARIA, ISABELA | Region II | Region II | Completed | ₱139M | 100% | High risk68 | —-0.025 |
| 17BF0030ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4(HDM-4)-PRIMARY ROADS,SANTIAGO-TUGUEGARAO ROAD K0395+14 | Region II | Isabela 2nd DEO | Completed | ₱52.8M | 100% | High risk67 | —-0.033 |
| 17BF0060CONSTRUCTION OF MULTI-PURPOSE HALL (EMPLOYEES QUARTER) WITH CARPORT, DPWH-ISDEO, ROXAS, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱5.2M | 100% | High risk65 | —-0.059 |
| 17BF0048ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS ALONG NAGUILIAN-SAN MARIANO ROAD; K0397+216-K0397+276, K0401+080-K0401+225, K0401+-145-K0401+080, K0401+300-K0401+ | Region II | Isabela 2nd DEO | Completed | ₱42.4M | 100% | High risk65 | —-0.050 |
| 17BF0032NETWORK DEVELOPMENT: OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE-TERTIARY ROAD ALONG NAGUILIAN-SAN MARIANO ROAD, K0408+000-K0409+000, K0409+794-K0409+821, K0409+821-K0409+934, K0409+976-K0410+112, K0410+203-K0410+280, K0410+280-K0410+520, K0410+540-K04 | Region II | Isabela 2nd DEO | Completed | ₱36.6M | 100% | High risk65 | —-0.051 |
| 17BF0006REPAIR/REHABILITATION/CONCRETING OF ROAD, BRGY. OLD-SAN MARIANO BRGY. MINANGA, SAN MARIANO, ISABELA 2ND LD, SAN MARIANO, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱9.4M | 100% | High risk64 | —-0.053 |
| 24BF0063ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF SIFFU RIVER FLOOD CONT | Region II | Isabela 2nd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.052 |
| 23BG0128OO2 - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL PROJECT, BARANGAY ZONE 1, SAN MARIANO, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱96.3M | 100% | High risk62 | —-0.053 |
| 23BG0126OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHAB OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL PROJECT, BRGY DIPUSU, SAN MARIANO | Region II | Isabela 3rd DEO | Completed | ₱96.4M | 100% | High risk62 | —-0.055 |
| 22BF0076ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT (OLANGO SECTION), MALLIG, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.053 |
| 24BF0032ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- | Region II | Isabela 2nd DEO | Completed | ₱96.2M | 100% | High risk62 | —-0.055 |
| 18B00008OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM: CONST'N / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: FLOOD CONTROL/URGENT RIVER BANK PROTECTION WORKS, PHASE I, SAN PLACIDO, ROXAS, ISABELA | Region II | Region II | Completed | ₱93.3M | 100% | High risk61 | —-0.054 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19B00044ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: REPLACEMENT OF PERMANENT WEAK BRIDGES: SIFFU BRIDGE (B01157LZ) ALONG SANTIAGO-TUGUEGARAO ROAD, ROXAS, ISABELA | Region II | Region II | On-Going | ₱542.4M | 91% | High risk83 | Flagged0.066 |
| 25BF0103CONSTRUCTION OF MULTI-PURPOSE BUILDING, DPWH ISABELA 2ND DEO, ROXAS ISABELA 2ND DEO | Region II | Isabela 2nd DEO | On-Going | ₱18.1M | 10% | High risk77 | Flagged0.027 |
| 25BF0102OO1: NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MALLIG BYPASS ROAD, PACKAGE 1, ISABELA, MALLIG, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱38M | 3% | High risk93 | Flagged0.022 |
| 25BF0053OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, (MARCOS SECTION PHASE 2), BARANGAY MARCOS, ROXAS, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱93.6M | 0% | High risk94 | Flagged0.021 |
| 25BF0052OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MALLIG RIVER FLOOD CONTROL PROJECT, (MARCOS SECTION PHASE 1), BARANGAY MARCOS, ROXAS, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱93.6M | 0% | High risk94 | Flagged0.021 |
| 25BF0057OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL PROJECT, (SAN JOSE SECTION PHASE II) ROXAS, ISABELA | Region II | Isabela 2nd DEO | On-Going | ₱93.6M | 38% | High risk94 | Flagged0.013 |
| 17BF0106REPAIR/REHABILITATION OF FLOOD CONTROL AT APIAT SECTION, AURORA, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱5.5M | 100% | Medium risk54 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 21BG0023OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY. LABINAB GRANDE, REINA MERCEDES, I | Region II | Isabela 3rd DEO | Completed | ₱46.5M | 100% | Medium risk44 | —-0.066 |
| 52 | 20BG0013OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER FLOOD CONTROL PROJECT, BRGY. MINANGA SECTION, NAGUILIAN, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱45.7M | 100% | Medium risk44 | —-0.066 |
| 53 | 23BG0014OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL PROJECT, BRGY. PALATTAO | Region II | Isabela 3rd DEO | Completed | ₱44.1M | 100% | Medium risk44 | —-0.066 |
| 54 | 20BF0003ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION/ REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - GAMU-ROXAS RD (S00783LZ) - K0404 + 100 - K0404 | Region II | Isabela 2nd DEO | Completed | ₱14.4M | 100% | Medium risk44 | —-0.082 |
| 55 | 19B00040ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF MISSING LINKS/NEW ROAD-ROXAS-PARACELIS ROAD INCLUDING ROW, ISABELA, STA.1+200-STA.7+080, ROXAS, ISABELA | Region II | Region II | Completed | ₱42.1M | 100% | Medium risk44 | —-0.072 |
| 56 | 20B00016ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF MISSING LINKS/NEW ROADS - ROXAS-PARACELIS ROAD, ISABELA; STA. 3+400 - STA.4+230, ROXAS, ISABELA | Region II | Region II | Completed | ₱37.7M | 100% | Medium risk44 | —-0.078 |
| 57 | 22BF0025SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL STRUCTURE (SITIO PAKAK SECTION)BRGY. NUESA, ROXAS, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱41.7M | 100% | Medium risk44 | —-0.068 |
| 58 | 18BE0101ASSET PRESERVATION-PREVENTIVE MAINTENANCE-TERTIARY ROADS, PREVENTIVE MAINTENANCE OF ROAD: CONCRETE REBLOCKING-ILAGAN-DELFIN ALBANO-MALLIG RD.-KO422+000-KO424+500DELFIN ALBANO, ISABELA | Region II | Isabela 1st DEO | Completed | ₱12.1M | 100% | Medium risk44 | —-0.083 |
| 59 | 18BF0063CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL PROJECT (DEL PILAR SECTION), SAN MARIANO, ISABELA, SAN MARIANO, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱46.5M | 100% | Medium risk44 | —-0.066 |
| 60 | 21BE0069REPAIR/MAINTENANCE OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS ABUAN RIVER-BASE ECO-TOURISM SINDUN BAYABO, CITY OF ILAGAN, ISABELA | Region II | Isabela 1st DEO | Completed | ₱14.1M | 100% | Medium risk44 | —-0.082 |
| 61 | 19BF0044PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS -CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF BARAMBAN CREEK FLOOD CONTROL PROJECT (BRGY. RIZAL SECTION), ROXAS, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱25.4M | 100% | Medium risk44 | —-0.063 |
| 62 | 22BF0048ORGANIZATINAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- NETWORK DEVELOPMENT PROGRAM- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS MALLIG BYPASS ROAD,ISABELA | Region II | Isabela 2nd DEO | Completed | ₱23.5M | 100% | Medium risk44 | —-0.083 |
| 63 | 20BG0001ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - GAMU - ROXAS RD - K0398+000-K0399+000, GAMU, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱13.1M | 100% | Medium risk44 | —-0.084 |
| 64 | 19BF0095PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES ANDDRAINAGE SYSTEMS CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL PROJECT (SIMIMBAAN SECTION) ROXAS, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱19M | 100% | Medium risk44 | —-0.069 |
| 65 | 24BF0019OO1: NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - SANTIAGO TUGUEGARAO RD - K0389 + 240 - K0389 + 776, MALLIG, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱19.6M | 100% | Medium risk44 | —-0.085 |
| 66 | 23BF0053ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS MALLIG BYPASS ROAD, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱19.6M | 100% | Medium risk43 | —-0.083 |
| 67 | 23B00003OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS/NEW ROADS- ROXAS-PARACELIS ROAD, ISABELA | Region II | Region II | Completed | ₱24.1M | 100% | Medium risk43 | —-0.085 |
| 68 | 21BF0078CONSTRUCTION OF BYPASS AND DIVERSION ROADS - MALLIG BYPASS ROAD, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱10.7M | 100% | Medium risk43 | —-0.085 |
| 69 | 24BF0010CSSP: BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY BIMONTON, MALLIG, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱4.9M | 100% | Medium risk43 | —-0.085 |
| 70 | 24BF0012BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY SAN VICENTE, QUIRINO, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱4.9M | 100% | Medium risk43 | —-0.084 |
| 71 | 21BE0067REPAIR/MAINTENANCE OF CURILAO BRIDGE ALONG DAANG MAHARLIKA, KO413+856.10-KO413+895 (RS) CITY OF ILAGAN, ISABELA | Region II | Isabela 1st DEO | Completed | ₱4.7M | 100% | Medium risk43 | —-0.044 |
| 72 | 20BG0011OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS-DAANG MAHARLIKA (LZ) K0382+000-K0382+664, NAGUILIAN, ISABELA | Region II | Isabela 3rd DEO | Completed | ₱8.7M | 100% | Medium risk43 | —-0.084 |
| 73 | 24BF0011CSSP: BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY NUESA, ROXAS, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱4.9M | 100% | Medium risk43 | —-0.082 |
| 74 | 24BF0009OO1: NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - SANTIAGO - TUGUEGARAO ROAD - K0381+614 - K0381+735, ROXAS, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱6M | 100% | Medium risk43 | —-0.085 |
| 75 | 19BF0133REPAIR/MAINTENANCE OF MALLIG RIVER FLOOD CONTROL STRUCTURE AT BRGY. MALIGAYA, MALLIG, ISABELA (PHASE II), MALLIG, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱6.4M | 100% | Medium risk42 | —-0.017 |