Contractor dossier
10 projects on file, including joint ventures this contractor is part of.
Total projects
10
Total budget
₱681.1M
Average progress
80.1%
Completion rate
60.0%
Below 70%
Average risk score
55.7
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 9 | ₱676.1M | 57.6 | 0 | 77.9% |
| Negros Island Region | 1 | ₱5M | 39.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 5 | ₱450.1M | 60.1 | 0 | 100.0% |
| Buildings and Facilities | 3 | ₱135.5M | 51.6 | 0 | 66.7% |
| Roads | 2 | ₱95.5M | 50.9 | 0 | 50.7% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OB0140CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG LABASAN RIVER (WEST BANK), PHASE 1, PACKAGE 6, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱94.6M | 100% | High risk65 | —-0.051 |
| 25OB0233CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG TAGUIG RIVER LAKESHORE AREA (PHASE 2), TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱93.8M | 100% | High risk65 | —-0.052 |
| 24OB0173CONSTRUCTION OF SLOPE PROTECTION ALONG STA. ANA RIVER, TAGUIG CITY (PHASE 1) | National Capital Region | Metro Manila 1st DEO | Completed | ₱94.6M | 100% | High risk64 | —-0.077 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25OB0140CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG LABASAN RIVER (WEST BANK), PHASE 1, PACKAGE 6, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱94.6M | 100% | High risk65 | —-0.051 |
| 2 | 25OB0233CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG TAGUIG RIVER LAKESHORE AREA (PHASE 2), TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱93.8M | 100% | High risk65 | —-0.052 |
| 3 | 24OB0173CONSTRUCTION OF SLOPE PROTECTION ALONG STA. ANA RIVER, TAGUIG CITY (PHASE 1) | National Capital Region | Metro Manila 1st DEO | Completed | ₱94.6M | 100% | High risk64 | —-0.077 |
| 4 | 25OB0208CONSTRUCTION (COMPLETION) OF TAGUIG NATIONAL HIGH SCHOOL, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱63.9M | 0% | Medium risk58 | —-0.027 |
| 5 | 23OB0437CONSTRUCTION OF MULTI-PURPOSE BUILDING AT PAMPANGA ROAD CORNER ZAMBALES ST., BARANGAY PINAGSAMA, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱66.5M | 100% | Medium risk58 | —-0.082 |
| 6 | 24OB0198CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG LABASAN RIVER (WEST BANK) PACKAGE 4, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱91.6M | 100% | Medium risk54 | —-0.078 |
| 7 | 24OB0289CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG LABASAN RIVER (EAST BANK), PACKAGE 1, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱75.5M | 100% | Medium risk53 | —-0.085 |
| 8 | 25OB0171IMPROVEMENT OF ROAD AND DRAINAGE STRUCTURE ALONG TAGUIG RIVER EASEMENT, BARANGAY WAWA, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱48.5M | 1% | Medium risk51 | —-0.036 |
| 9 | 23OB0354REHABILITATION OF ST. PETER ST., ST. JOHN ST., ST. THERESE ST. AT PERPETUAL VILLAGE, BARANGAY BAGONG TANYAG, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱47M | 100% | Medium risk51 | —-0.095 |
| 10 | 23GO0098CONSTRUCTION OF 1 STOREY 2 CLASSROOM AT TEOFILO GENSOLI SR. NATIONAL HIGH SCHOOL , BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | Completed | ₱5M | 100% | Medium risk39 | —-0.047 |