Contractor dossier
304 projects on file, including joint ventures this contractor is part of.
Total projects
304
Total budget
₱5.7B
Average progress
95.6%
Completion rate
85.9%
Average risk score
40.5
Medium risk on average, out of 100
Flagged as unusual
31
10.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VI | 300 | ₱5.5B | 40.4 | 31 | 95.5% |
| Negros Island Region | 4 | ₱281.4M | 51.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 121 | ₱3.5B | 46.4 | 2 | 97.0% |
| Buildings and Facilities | 114 | ₱756.8M | 28.9 | 16 | 95.1% |
| Flood Control and Drainage | 32 | ₱745.9M | 41.2 | 1 | 99.0% |
| Water Provision and Storage | 12 | ₱42.9M | 28.1 | 0 | 96.9% |
| OTHER | 9 | ₱332.7M | 81.4 | 8 | 77.6% |
| Bridges | 8 | ₱107.5M | 40.9 | 0 | 100.0% |
| GAA 2025 SSP | 4 | ₱39.3M | 91.3 | 3 | 73.8% |
| GAA 2025 OO-1 | 2 | ₱81.6M | 91.7 | 1 | 90.9% |
| GAA 2025 OO-2 | 1 | ₱41.8M | 88.8 | 0 | 71.2% |
| Bridges, Roads | 1 | ₱69.8M | 52.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GE0005CONSTRUCTION OF CONCRETE ROAD-CONSTRUCTION OF SITIO COMIAN-SITIO DULIT, SAN ROQUE-SITIO CALIAN-SITIO PROPER-JCT. CIRCUMFERENTIAL ROAD, BARANGAY SAN ROQUE AND BARANGAY SALVACION, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱14.7M | 100% | High risk95 | Flagged0.011 |
| 25GE0037CONSTRUCTION OF MULTI PURPOSE BUILDING-CONSTRUCTION OF MULTI-PURPOSE BUILDING BLDG 5 IN MUNICIPALITY OF JORDAN, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱12.9M | 26% | High risk95 | Flagged0.034 |
| 25GE0017ROAD WIDENING-AT SPECIFIC LOCATIONS ALONG GUIMARAS CIRCUMFERENTIAL RD (S00028GR) K0084+460 - K0085+570 | Region VI | Guimaras DEO | On-Going | ₱66.7M | 82% | High risk94 | Flagged0.003 |
| 25GE0036ROAD SAFETY: ROADWAY LIGHTING - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) AT SPECIFIC LOCATIONS ALONG RIZAL-JORDAN WHARF RD (S00026GR) K0008 + (-632) - K0008 + 565 | Region VI | Guimaras DEO | On-Going | ₱6.8M | 69% | High risk92 | Flagged0.023 |
| 25GE0056ROAD WIDENING - AT SPECIFIC LOCATIONS ALONG GUIMARAS CIRCUMFERENTIAL RD (S00028GR) K0020+180 - K0020+480 | Region VI | Guimaras DEO | Completed | ₱14.9M | 100% | High risk89 | —-0.034 |
| 24G00088REHABILITATION OF THREE-STOREY ICT AND MULTIMEDIA CENTER, SAN ENRIQUE CAMPUS - ILOILO STATE UNIVERSITY OF FISHERIES SCIENCE AND TECHNOLOGY | Region VI | Region VI | On-Going | ₱14.9M | 56% | High risk89 | Flagged0.059 |
| 24GP0076CONSTRUCTION OF 2- STOREY 4- CLASSROOM SCHOOL BUILDING IN AGLALANA INTEGRATED SCHOOL, BRGY. AGLALANA, DUMARAO, CAPIZ | Region VI | Capiz 2nd DEO | On-Going | ₱15.6M | 100% | High risk89 | Flagged0.048 |
| 25GP0050CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER BASIN, BARANGAY POBLACION ILAWOD (UPSTREAM OF GUINOTOS OVERFLOW), DUMARAO, CAPIZ | Region VI | Capiz 2nd DEO | On-Going | ₱41.8M | 71% | High risk89 | —-0.006 |
| 25GE0008CONSTRUCTION OF MULTI-PURPOSE BUILDING-CONSTRUCTION OF MULTI-PURPOSE BUILDING, SALVACION NATIONAL HIGH SCHOOL, BARANGAY SALVACION, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱4.9M | 100% | High risk83 | —-0.019 |
| 24G00022ILOILO CIRCUMFERENTIAL RD 3, ILOILO | Region VI | Region VI | On-Going | ₱76.5M | 82% | High risk82 | Flagged0.013 |
| 24G00026PASSI BYPASS ROAD, ILOILO | Region VI | Region VI | On-Going | ₱86.3M | 48% | High risk82 | Flagged0.024 |
| 23GE0061CONSTRUCTION OF WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, MUNICIPALITY OF NUEVA VALENCIA, PROVINCE OF GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱29.4M | 71% | High risk79 | Flagged0.018 |
| 24GE0011CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF JCT. GUIMARAS CIRCUMFERENTIAL ROAD, SITIO ILAWOD, BARANGAY SALVACION TO SITIO BADANG, BARANGAY LUCMAYAN, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱21.8M | 99% | High risk79 | Flagged0.003 |
| 23GE0072CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OF MULTI-PURPOSE BUILDING, DR. CATALINO GALLEGO NAVA PROVINCIAL HOSPITAL EXTENSION BUILDING, SAN MIGUEL, JORDAN, GUIMARAS (PHASE II) | Region VI | Guimaras DEO | On-Going | ₱19.7M | 97% | High risk79 | Flagged0.007 |
| 25GE0022CONSTRUCTION OF OTHER BUILDING - CONSTRUCTION OF QUALITY ASSURANCE BUILDING, DPWH GUIMARAS DEO, SAN MIGUEL, JORDAN, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱29.3M | 45% | High risk78 | Flagged0.012 |
| 21GH0077CONSTRUCTION OF CONCRETE ROAD - NRJ PUERTO PRINCESA-SAN FRANCISCO ROAD LEADING TO BALARING BEACH RESORTS AND SITIO MIAO BEACH RESORTS, BAROTAC VIEJO, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱39.2M | 100% | High risk75 | —-0.030 |
| 24GE0072CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OF DR. CATALINO GALLEGO NAVA PROVINCIAL HOSPITAL, BRGY. SAN MIGUEL, JORDAN, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱19.7M | 0% | High risk72 | Flagged0.014 |
| 24GE0054CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OF MULTI-PURPOSE BUILDING (ACADEMIC BUILDING), MOSQUEDA CAMPUS, GUIMARAS STATE UNIVERSITY, ALAGUISOC, JORDAN, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱29.6M | 100% | High risk71 | —-0.056 |
| 24GE0017CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL SYSTEM IN BARANGAY STO. ROSARIO, BUENAVISTA, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱27.6M | 75% | High risk70 | Flagged0.003 |
| 25GE0025CONSTRUCTION OF SLOPE PROTECTION STRUCTURE-CONSTRUCTION OF ATGANG RIVER BANK SLOPE PROTECTION STRUCTURE ALONG GUIMARAS CIRCUMFERENTIAL ROAD, BARANGAY SAN ISIDRO, SIBUNAG, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱29.3M | 93% | High risk69 | —-0.014 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24G00088REHABILITATION OF THREE-STOREY ICT AND MULTIMEDIA CENTER, SAN ENRIQUE CAMPUS - ILOILO STATE UNIVERSITY OF FISHERIES SCIENCE AND TECHNOLOGY | Region VI | Region VI | On-Going | ₱14.9M | 56% | High risk89 | Flagged0.059 |
| 24GE0063CONSTRUCTION OF 2-STOREY 4-CLASSROOM SCHOOL BUILDING IN JORDAN NATIONAL HIGH SCHOOL, BRGY. POBLACION, JORDAN, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱15.6M | 0% | High risk62 | Flagged0.053 |
| 24GP0076CONSTRUCTION OF 2- STOREY 4- CLASSROOM SCHOOL BUILDING IN AGLALANA INTEGRATED SCHOOL, BRGY. AGLALANA, DUMARAO, CAPIZ | Region VI | Capiz 2nd DEO | On-Going | ₱15.6M | 100% | High risk89 | Flagged0.048 |
| 24G00113CONSTRUCTION OF MULTI-PURPOSE BUILDING, DON JUSTO V. VALMAYOR CAMPUS - CENTRAL PHILIPPINES STATE UNIVERSITY | Region VI | Region VI | On-Going | ₱9.9M | 0% | High risk61 | Flagged0.046 |
| 24GE0057CONCRETING OF SITIO BADYANG I TO SITIO BADYANG II, BRGY. IGCAWAYAN FMR, BRGY. IGCAWAYAN, SAN LORENZO, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱14.7M | 87% | High risk68 | Flagged0.035 |
| 24G00091COMPLETION/EQUIPPING OF SUPER HEALTH CENTERS- SIBALOM SUPER HEALTH CENTER, ANTIQUE | Region VI | Region VI | On-Going | ₱6M | 44% | Medium risk56 | Flagged0.034 |
| 25GE0037CONSTRUCTION OF MULTI PURPOSE BUILDING-CONSTRUCTION OF MULTI-PURPOSE BUILDING BLDG 5 IN MUNICIPALITY OF JORDAN, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱12.9M | 26% | High risk95 | Flagged0.034 |
| 18GE0150CONSTRUCTION OF 2STY2CL, SCIENCE LAB. G.I. ROOF SCHOOL BUILDING, AYANGAN NATIONAL HIGH SCHOOL | Region VI | Guimaras DEO | On-Going | ₱8.6M | 100% | Medium risk46 | Flagged0.025 |
| 18GE0149CONSTRUCTION OF 2STY2CL, ICT LAB. G.I. ROOF SCHOOL BUILDING, AYANGAN NATIONAL HIGH SCHOOL | Region VI | Guimaras DEO | On-Going | ₱8.6M | 100% | Medium risk46 | Flagged0.025 |
| 24G00026PASSI BYPASS ROAD, ILOILO | Region VI | Region VI | On-Going | ₱86.3M | 48% | High risk82 | Flagged0.024 |
| 25GE0036ROAD SAFETY: ROADWAY LIGHTING - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) AT SPECIFIC LOCATIONS ALONG RIZAL-JORDAN WHARF RD (S00026GR) K0008 + (-632) - K0008 + 565 | Region VI | Guimaras DEO | On-Going | ₱6.8M | 69% | High risk92 | Flagged0.023 |
| 24G00096CONSTRUCTION OF TRAINING CENTER BUILDING, JESUS FERMIN CAMPUS- CARLOS HILADO MEMORIAL STATE UNIVERSITY | Region VI | Region VI | On-Going | ₱14.7M | 29% | Medium risk45 | Flagged0.020 |
| 24G00073EXPANSION OF ITRDC BUILDING, SALVADOR CAMPUS | Region VI | Region VI | On-Going | ₱14.9M | 92% | High risk63 | Flagged0.019 |
| 23GE0061CONSTRUCTION OF WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, MUNICIPALITY OF NUEVA VALENCIA, PROVINCE OF GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱29.4M | 71% | High risk79 | Flagged0.018 |
| 24G00124CONSTRUCTION OF CLASSROOMS IN SIBALOM CAMPUS - UNIVERSITY OF ANTIQUE | Region VI | Region VI | On-Going | ₱14.8M | 37% | Medium risk45 | Flagged0.017 |
| 24G00122REHABILITATION OF EXISTING HOMEMAKING BUILDING, LEON CAMPUS - ILOILO SCIENCE AND TECHNOLOGY UNIVERSITY | Region VI | Region VI | On-Going | ₱7.9M | 86% | Medium risk60 | Flagged0.017 |
| 24G00123CONSTRUCTION OF SICOGON ISLAND WILDLIFE SANCTUARY PROTECTED AREA MANAGEMENT OFFICE (SIWS-PAMO) | Region VI | Region VI | On-Going | ₱3M | 87% | Low risk30 | Flagged0.017 |
| 24G00116LGU HOSPITALS- MAASIN, ILOILO INFIRMARY, ILOILO | Region VI | Region VI | On-Going | ₱19.8M | 91% | High risk62 | Flagged0.016 |
| 24G00132CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU- ALIMODIAN SUPER HEALTH CENTER, ILOILO | Region VI | Region VI | On-Going | ₱11.9M | 87% | High risk61 | Flagged0.016 |
| 24GE0072CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OF DR. CATALINO GALLEGO NAVA PROVINCIAL HOSPITAL, BRGY. SAN MIGUEL, JORDAN, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱19.7M | 0% | High risk72 | Flagged0.014 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 226 | 21GE0063CONSTRUCTION OF ACCESSIBILITY FACILITY-CONSTRUCTION OF FOOTBRIDGE IN NAOWAY ISLAND, BARANGAY SAN ISIDRO, SIBUNAG, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱3.2M | 100% | Low risk23 | —-0.084 |
| 227 | 19G00081CONSTRUCTION OF 20 RAINWATER COLLECTION SYSTEM (RWCS) ON VARIOUS PUBLIC SCHOOLS AND OFFICES | Region VI | Region VI | Completed | ₱3.7M | 100% | Low risk23 | —-0.056 |
| 228 | 19GE0162CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - RAINWATER COLLECTOR SYSTEM | Region VI | Guimaras DEO | Completed | ₱3.5M | 100% | Low risk23 | —-0.054 |
| 229 | 18GE0092CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - RAINWATER COLLECTOR SYSTEM | Region VI | Guimaras DEO | Completed | ₱3.1M | 100% | Low risk23 | —-0.054 |
| 230 | 18G00076CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS) IN REGION VI | Region VI | Region VI | Completed | ₱3.2M | 100% | Low risk23 | —-0.056 |
| 231 | 22GE0057CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAINWATER COLLECTOR SYSTEM | Region VI | Guimaras DEO | Completed | ₱3.4M | 100% | Low risk23 | —-0.055 |
| 232 | 23GE0054CONSTRUCTION OF RAINWATER COLLECTOR-CONSTRUCTION OF RAIN WATER COLLECTOR, MUNICIPALITY OF SAN LORENZO AND NUEVA VALENCIA, PROVINCE OF GUIMARAS | Region VI | Guimaras DEO | Completed | ₱2.3M | 100% | Low risk23 | —-0.050 |
| 233 | 23GJ0131(RE-AD) PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DELGADO ST. (S00087PN) - K0001+391 - K0001+459 | Region VI | Iloilo City DEO | Completed | ₱2.1M | 100% | Low risk23 | —-0.082 |
| 234 | 21GJ0023CONSTRUCTION OF MULTI PURPOSE BUILDING - CONSTRUCTION OF MULTI-PURPOSE BUILDING SOUTH FUNDIDOR, MOLO, ILOILO CITY | Region VI | Iloilo City DEO | Completed | ₱4.5M | 100% | Low risk22 | —-0.085 |
| 235 | 21GF0019CONSTRUCTION OF MULTI-PURPOSE BUILDING, MIAGAO NHS HOME ECONOMICS BUILDING, MIAG-AO, ILOILO | Region VI | Iloilo 1st DEO | Completed | ₱4M | 100% | Low risk21 | —-0.083 |
| 236 | 20G00131CONSTRUCTION OF PERMANENT EVACUATION CENTER/MULTI-PURPOSE COVERED COURT (STANDARD) | Region VI | Region VI | Completed | ₱3.4M | 100% | Low risk21 | —-0.082 |
| 237 | 21GJ0021CONSTRUCTION OF MULTI PURPOSE BUILDING - CONSTRUCTION OF MULTI-PURPOSE BUILDING IN MANDURRIAO, ILOILO CITY | Region VI | Iloilo City DEO | Completed | ₱3.2M | 100% | Low risk21 | —-0.085 |
| 238 | 21GJ0018CONSTRUCTION OF MULTI PURPOSE BUILDING - CONSTRUCTION OF MULTI PURPOSE BUILDING IN COMPANIA CENTRAL, MOLO, ILOILO CITY | Region VI | Iloilo City DEO | Completed | ₱4.1M | 100% | Low risk21 | —-0.085 |
| 239 | 21GJ0022CONSTRUCTION OF MULTI PURPOSE BUILDING - CONSTRUCTION OF MULTI-PURPOSE BUILDING IN RIZAL, LAPUZ, ILOILO CITY | Region VI | Iloilo City DEO | Completed | ₱4.3M | 100% | Low risk21 | —-0.085 |
| 240 | 18GE0083CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY MCLAIN, BUENAVISTA, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱2.8M | 100% | Low risk21 | —-0.082 |
| 241 | 21GE0051CONSTRUCTION OF MULTI-PURPOSE BUILDING-CONSTRUCTION (PHASE II) OF MULTI-PURPOSE BUILDING, BARANGAY SEBASTE, SIBUNAG, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱2.8M | 100% | Low risk21 | —-0.078 |
| 242 | 18GE0140CONSTRUCTION OF MULTI-PURPOSE BUILDING AT SAN LORENZO NATIONAL HIGH SCHOOL, BRGY. SUCLARAN, SAN LORENZO, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱2.8M | 100% | Low risk21 | —-0.080 |
| 243 | 21GJ0012CONSTRUCTION OF MULTI PURPOSE BUILDING - CONSTRUCTION OF MULTI-PURPOSE BUILDING (NABITASAN ELEMENTARY SCHOOL), ILOILO CITY, ILOILO | Region VI | Iloilo City DEO | Completed | ₱2.7M | 100% | Low risk21 | —-0.082 |
| 244 | 20GE0037CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN MIGUEL, JORDAN, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱2.8M | 100% | Low risk21 | —-0.084 |
| 245 | 21GE0065CONSTRUCTION OF MULTI-PURPOSE BUILDING-CONSTRUCTION (PHASE II) OF MULTI-PURPOSE BUILDING, BRGY. M. CHAVEZ, SAN LORENZO, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱2.5M | 100% | Low risk21 | —-0.080 |
| 246 | 21GE0072CONSTRUCTION OF MULTI-PURPOSE BUILDING-CONSTRUCTION (PHASE II) OF MULTI-PURPOSE BUILDING, BRGY. ORACON, SIBUNAG, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱2.1M | 100% | Low risk21 | —-0.081 |
| 247 | 20G00103CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAINWATER COLLECTORS-RAINWATER COLLECTOR IN PUBLIC FACILITIES IN REGION VI-NINE (9) UNITS AT ILOILO AREA FOR VARIOUS NATIONAL GOVERNMENT AGENCIES | Region VI | Region VI | Terminated | ₱1.4M | 100% | Low risk20 | —-0.034 |
| 248 | 21GJ0037CONSTRUCTION OF DRAINAGE STRUCTURE - CONSTRUCTION/REHABILITATION OF DRAINAGE SYSTEM IN BARANGAY CAMALIG, JARO, ILOILO CITY | Region VI | Iloilo City DEO | Completed | ₱1.9M | 100% | Low risk19 | —-0.069 |
| 249 | 20GE0028PREVENTIVE MAINTENANCE OF ROAD: CONCRETE REBLOCKING 280MM - AT SPECIFIC LOCATIONS ALONG CENTRAL RD (SN MIGUEL-CONSTANCIA-CABANO-IGCAWAYAN) (S00025GR) K0061+825 - K0062+000 | Region VI | Guimaras DEO | Completed | ₱977.4K | 100% | Low risk18 | —-0.081 |
| 250 | 20G00144CONSTRUCTION OF ACCESSIBILITY FACILITIES, TALAVE ELEMENTARY SCHOOL, SAN CARLOS CITY, NEGROS OCCIDENTAL | Region VI | Region VI | Completed | ₱480K | 100% | Low risk14 | —-0.078 |