Contractor dossier
304 projects on file, including joint ventures this contractor is part of.
Total projects
304
Total budget
₱5.7B
Average progress
95.6%
Completion rate
85.9%
Average risk score
40.5
Medium risk on average, out of 100
Flagged as unusual
31
10.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VI | 300 | ₱5.5B | 40.4 | 31 | 95.5% |
| Negros Island Region | 4 | ₱281.4M | 51.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 121 | ₱3.5B | 46.4 | 2 | 97.0% |
| Buildings and Facilities | 114 | ₱756.8M | 28.9 | 16 | 95.1% |
| Flood Control and Drainage | 32 | ₱745.9M | 41.2 | 1 | 99.0% |
| Water Provision and Storage | 12 | ₱42.9M | 28.1 | 0 | 96.9% |
| OTHER | 9 | ₱332.7M | 81.4 | 8 | 77.6% |
| Bridges | 8 | ₱107.5M | 40.9 | 0 | 100.0% |
| GAA 2025 SSP | 4 | ₱39.3M | 91.3 | 3 | 73.8% |
| GAA 2025 OO-1 | 2 | ₱81.6M | 91.7 | 1 | 90.9% |
| GAA 2025 OO-2 | 1 | ₱41.8M | 88.8 | 0 | 71.2% |
| Bridges, Roads | 1 | ₱69.8M | 52.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GE0005CONSTRUCTION OF CONCRETE ROAD-CONSTRUCTION OF SITIO COMIAN-SITIO DULIT, SAN ROQUE-SITIO CALIAN-SITIO PROPER-JCT. CIRCUMFERENTIAL ROAD, BARANGAY SAN ROQUE AND BARANGAY SALVACION, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱14.7M | 100% | High risk95 | Flagged0.011 |
| 25GE0037CONSTRUCTION OF MULTI PURPOSE BUILDING-CONSTRUCTION OF MULTI-PURPOSE BUILDING BLDG 5 IN MUNICIPALITY OF JORDAN, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱12.9M | 26% | High risk95 | Flagged0.034 |
| 25GE0017ROAD WIDENING-AT SPECIFIC LOCATIONS ALONG GUIMARAS CIRCUMFERENTIAL RD (S00028GR) K0084+460 - K0085+570 | Region VI | Guimaras DEO | On-Going | ₱66.7M | 82% | High risk94 | Flagged0.003 |
| 25GE0036ROAD SAFETY: ROADWAY LIGHTING - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) AT SPECIFIC LOCATIONS ALONG RIZAL-JORDAN WHARF RD (S00026GR) K0008 + (-632) - K0008 + 565 | Region VI | Guimaras DEO | On-Going | ₱6.8M | 69% | High risk92 | Flagged0.023 |
| 25GE0056ROAD WIDENING - AT SPECIFIC LOCATIONS ALONG GUIMARAS CIRCUMFERENTIAL RD (S00028GR) K0020+180 - K0020+480 | Region VI | Guimaras DEO | Completed | ₱14.9M | 100% | High risk89 | —-0.034 |
| 24G00088REHABILITATION OF THREE-STOREY ICT AND MULTIMEDIA CENTER, SAN ENRIQUE CAMPUS - ILOILO STATE UNIVERSITY OF FISHERIES SCIENCE AND TECHNOLOGY | Region VI | Region VI | On-Going | ₱14.9M | 56% | High risk89 | Flagged0.059 |
| 24GP0076CONSTRUCTION OF 2- STOREY 4- CLASSROOM SCHOOL BUILDING IN AGLALANA INTEGRATED SCHOOL, BRGY. AGLALANA, DUMARAO, CAPIZ | Region VI | Capiz 2nd DEO | On-Going | ₱15.6M | 100% | High risk89 | Flagged0.048 |
| 25GP0050CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER BASIN, BARANGAY POBLACION ILAWOD (UPSTREAM OF GUINOTOS OVERFLOW), DUMARAO, CAPIZ | Region VI | Capiz 2nd DEO | On-Going | ₱41.8M | 71% | High risk89 | —-0.006 |
| 25GE0008CONSTRUCTION OF MULTI-PURPOSE BUILDING-CONSTRUCTION OF MULTI-PURPOSE BUILDING, SALVACION NATIONAL HIGH SCHOOL, BARANGAY SALVACION, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱4.9M | 100% | High risk83 | —-0.019 |
| 24G00022ILOILO CIRCUMFERENTIAL RD 3, ILOILO | Region VI | Region VI | On-Going | ₱76.5M | 82% | High risk82 | Flagged0.013 |
| 24G00026PASSI BYPASS ROAD, ILOILO | Region VI | Region VI | On-Going | ₱86.3M | 48% | High risk82 | Flagged0.024 |
| 23GE0061CONSTRUCTION OF WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, MUNICIPALITY OF NUEVA VALENCIA, PROVINCE OF GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱29.4M | 71% | High risk79 | Flagged0.018 |
| 24GE0011CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF JCT. GUIMARAS CIRCUMFERENTIAL ROAD, SITIO ILAWOD, BARANGAY SALVACION TO SITIO BADANG, BARANGAY LUCMAYAN, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱21.8M | 99% | High risk79 | Flagged0.003 |
| 23GE0072CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OF MULTI-PURPOSE BUILDING, DR. CATALINO GALLEGO NAVA PROVINCIAL HOSPITAL EXTENSION BUILDING, SAN MIGUEL, JORDAN, GUIMARAS (PHASE II) | Region VI | Guimaras DEO | On-Going | ₱19.7M | 97% | High risk79 | Flagged0.007 |
| 25GE0022CONSTRUCTION OF OTHER BUILDING - CONSTRUCTION OF QUALITY ASSURANCE BUILDING, DPWH GUIMARAS DEO, SAN MIGUEL, JORDAN, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱29.3M | 45% | High risk78 | Flagged0.012 |
| 21GH0077CONSTRUCTION OF CONCRETE ROAD - NRJ PUERTO PRINCESA-SAN FRANCISCO ROAD LEADING TO BALARING BEACH RESORTS AND SITIO MIAO BEACH RESORTS, BAROTAC VIEJO, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱39.2M | 100% | High risk75 | —-0.030 |
| 24GE0072CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OF DR. CATALINO GALLEGO NAVA PROVINCIAL HOSPITAL, BRGY. SAN MIGUEL, JORDAN, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱19.7M | 0% | High risk72 | Flagged0.014 |
| 24GE0054CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OF MULTI-PURPOSE BUILDING (ACADEMIC BUILDING), MOSQUEDA CAMPUS, GUIMARAS STATE UNIVERSITY, ALAGUISOC, JORDAN, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱29.6M | 100% | High risk71 | —-0.056 |
| 24GE0017CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL SYSTEM IN BARANGAY STO. ROSARIO, BUENAVISTA, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱27.6M | 75% | High risk70 | Flagged0.003 |
| 25GE0025CONSTRUCTION OF SLOPE PROTECTION STRUCTURE-CONSTRUCTION OF ATGANG RIVER BANK SLOPE PROTECTION STRUCTURE ALONG GUIMARAS CIRCUMFERENTIAL ROAD, BARANGAY SAN ISIDRO, SIBUNAG, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱29.3M | 93% | High risk69 | —-0.014 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24G00088REHABILITATION OF THREE-STOREY ICT AND MULTIMEDIA CENTER, SAN ENRIQUE CAMPUS - ILOILO STATE UNIVERSITY OF FISHERIES SCIENCE AND TECHNOLOGY | Region VI | Region VI | On-Going | ₱14.9M | 56% | High risk89 | Flagged0.059 |
| 24GE0063CONSTRUCTION OF 2-STOREY 4-CLASSROOM SCHOOL BUILDING IN JORDAN NATIONAL HIGH SCHOOL, BRGY. POBLACION, JORDAN, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱15.6M | 0% | High risk62 | Flagged0.053 |
| 24GP0076CONSTRUCTION OF 2- STOREY 4- CLASSROOM SCHOOL BUILDING IN AGLALANA INTEGRATED SCHOOL, BRGY. AGLALANA, DUMARAO, CAPIZ | Region VI | Capiz 2nd DEO | On-Going | ₱15.6M | 100% | High risk89 | Flagged0.048 |
| 24G00113CONSTRUCTION OF MULTI-PURPOSE BUILDING, DON JUSTO V. VALMAYOR CAMPUS - CENTRAL PHILIPPINES STATE UNIVERSITY | Region VI | Region VI | On-Going | ₱9.9M | 0% | High risk61 | Flagged0.046 |
| 24GE0057CONCRETING OF SITIO BADYANG I TO SITIO BADYANG II, BRGY. IGCAWAYAN FMR, BRGY. IGCAWAYAN, SAN LORENZO, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱14.7M | 87% | High risk68 | Flagged0.035 |
| 24G00091COMPLETION/EQUIPPING OF SUPER HEALTH CENTERS- SIBALOM SUPER HEALTH CENTER, ANTIQUE | Region VI | Region VI | On-Going | ₱6M | 44% | Medium risk56 | Flagged0.034 |
| 25GE0037CONSTRUCTION OF MULTI PURPOSE BUILDING-CONSTRUCTION OF MULTI-PURPOSE BUILDING BLDG 5 IN MUNICIPALITY OF JORDAN, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱12.9M | 26% | High risk95 | Flagged0.034 |
| 18GE0150CONSTRUCTION OF 2STY2CL, SCIENCE LAB. G.I. ROOF SCHOOL BUILDING, AYANGAN NATIONAL HIGH SCHOOL | Region VI | Guimaras DEO | On-Going | ₱8.6M | 100% | Medium risk46 | Flagged0.025 |
| 18GE0149CONSTRUCTION OF 2STY2CL, ICT LAB. G.I. ROOF SCHOOL BUILDING, AYANGAN NATIONAL HIGH SCHOOL | Region VI | Guimaras DEO | On-Going | ₱8.6M | 100% | Medium risk46 | Flagged0.025 |
| 24G00026PASSI BYPASS ROAD, ILOILO | Region VI | Region VI | On-Going | ₱86.3M | 48% | High risk82 | Flagged0.024 |
| 25GE0036ROAD SAFETY: ROADWAY LIGHTING - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) AT SPECIFIC LOCATIONS ALONG RIZAL-JORDAN WHARF RD (S00026GR) K0008 + (-632) - K0008 + 565 | Region VI | Guimaras DEO | On-Going | ₱6.8M | 69% | High risk92 | Flagged0.023 |
| 24G00096CONSTRUCTION OF TRAINING CENTER BUILDING, JESUS FERMIN CAMPUS- CARLOS HILADO MEMORIAL STATE UNIVERSITY | Region VI | Region VI | On-Going | ₱14.7M | 29% | Medium risk45 | Flagged0.020 |
| 24G00073EXPANSION OF ITRDC BUILDING, SALVADOR CAMPUS | Region VI | Region VI | On-Going | ₱14.9M | 92% | High risk63 | Flagged0.019 |
| 23GE0061CONSTRUCTION OF WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, MUNICIPALITY OF NUEVA VALENCIA, PROVINCE OF GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱29.4M | 71% | High risk79 | Flagged0.018 |
| 24G00124CONSTRUCTION OF CLASSROOMS IN SIBALOM CAMPUS - UNIVERSITY OF ANTIQUE | Region VI | Region VI | On-Going | ₱14.8M | 37% | Medium risk45 | Flagged0.017 |
| 24G00122REHABILITATION OF EXISTING HOMEMAKING BUILDING, LEON CAMPUS - ILOILO SCIENCE AND TECHNOLOGY UNIVERSITY | Region VI | Region VI | On-Going | ₱7.9M | 86% | Medium risk60 | Flagged0.017 |
| 24G00123CONSTRUCTION OF SICOGON ISLAND WILDLIFE SANCTUARY PROTECTED AREA MANAGEMENT OFFICE (SIWS-PAMO) | Region VI | Region VI | On-Going | ₱3M | 87% | Low risk30 | Flagged0.017 |
| 24G00116LGU HOSPITALS- MAASIN, ILOILO INFIRMARY, ILOILO | Region VI | Region VI | On-Going | ₱19.8M | 91% | High risk62 | Flagged0.016 |
| 24G00132CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU- ALIMODIAN SUPER HEALTH CENTER, ILOILO | Region VI | Region VI | On-Going | ₱11.9M | 87% | High risk61 | Flagged0.016 |
| 24GE0072CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OF DR. CATALINO GALLEGO NAVA PROVINCIAL HOSPITAL, BRGY. SAN MIGUEL, JORDAN, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱19.7M | 0% | High risk72 | Flagged0.014 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 276 | 19GE0120CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE II), BRGY. GABAN, SAN LORENZO, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱1.4M | 100% | Low risk13 | —-0.080 |
| 277 | 19GE0038CONSTRUCTION OF MULTI-PURPOSE BUILDING IN GABAN ELEMENTARY SCHOOL, BRGY. GABAN, SAN LORENZO, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱1.4M | 100% | Low risk13 | —-0.080 |
| 278 | 19GE0076CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SEBASTE, SIBUNAG, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱1.4M | 100% | Low risk13 | —-0.080 |
| 279 | 19GE0122CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE II), BRGY. BUGNAY, JORDAN, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱1.4M | 100% | Low risk13 | —-0.081 |
| 280 | 19GE0037CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BUGNAY ELEMENTARY SCHOOL, BRGY. BUGNAY, JORDAN, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱1.4M | 100% | Low risk13 | —-0.081 |
| 281 | 18GE0108CONSTRUCTION OF MULTI-PURPOSE BUILDING AT MILLAN ELEMENTARY SCHOOL, BRGY. MILLAN, SIBUNAG, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱1.4M | 100% | Low risk13 | —-0.081 |
| 282 | 19GE0056CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SAN MIGUEL, JORDAN, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱1.4M | 100% | Low risk13 | —-0.081 |
| 283 | 19GE0107CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MOROBUAN, JORDAN, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱1.4M | 100% | Low risk13 | —-0.081 |
| 284 | 19GE0102CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE 2), BRGY. BALCON MARAVILLA, JORDAN, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱1.4M | 100% | Low risk13 | —-0.081 |
| 285 | 18GE0051CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. HOSKYN, JORDAN, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱1.4M | 100% | Low risk13 | —-0.082 |
| 286 | 19GE0128CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. LAWI, JORDAN, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱1.4M | 100% | Low risk13 | —-0.082 |
| 287 | 19GE0077CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. POBLACION, JORDAN, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱1.4M | 100% | Low risk13 | —-0.082 |
| 288 | 19GE0138CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. HOSKYN, JORDAN, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱1.4M | 100% | Low risk13 | —-0.082 |
| 289 | 19GE0110CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. RIZAL, JORDAN, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱1.4M | 100% | Low risk13 | —-0.082 |
| 290 | 18GE0050CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BRGY. LAPAZ, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱1.4M | 100% | Low risk13 | —-0.083 |
| 291 | 18GE0019CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MABINI, BUENAVISTA, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱1.5M | 100% | Low risk13 | —-0.081 |
| 292 | 19GE0131CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SUCLARAN, SAN LORENZO, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱940.5K | 100% | Low risk13 | —-0.080 |
| 293 | 21GE0059CONSTRUCTION OF MULTI-PURPOSE BUILDING-CONSTRUCTION (PHASE II) OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY SABANG, SIBUNAG, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱633.5K | 100% | Low risk13 | —-0.077 |
| 294 | 20GE0054REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. BUGNAY, JORDAN, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱909.3K | 100% | Low risk13 | —-0.079 |
| 295 | 20GE0047REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. NAZARET, BUENAVISTA, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱980.1K | 100% | Low risk13 | —-0.080 |
| 296 | 20GE0063IMPROVEMENT OF MULTI-PURPOSE BUILDING, BRGY. AGSANAYAN, BUENAVISTA, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱950.1K | 100% | Low risk13 | —-0.080 |
| 297 | 20GE0024CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE 1), SENIOR CITIZEN BUILDING, BRGY. RAVINA NORTE, SIBUNAG, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱949.9K | 100% | Low risk13 | —-0.080 |
| 298 | 20GE0056REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. STA. TERESA, JORDAN, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱949.9K | 100% | Low risk13 | —-0.080 |
| 299 | 19GE0137CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. AGUILAR, SAN LORENZO, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱940.5K | 100% | Low risk13 | —-0.080 |
| 300 | 19GE0133CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SABANG, SIBUNAG, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱940.5K | 100% | Low risk13 | —-0.080 |