Opening the dossier…
Opening the dossier…
Contractor dossier
304 projects on file, including joint ventures this contractor is part of.
Total projects
304
Total budget
₱5.7B
Average progress
95.6%
Completion rate
85.9%
Average risk score
40.5
Medium risk on average, out of 100
Flagged as unusual
31
10.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VI | 300 | ₱5.5B | 40.4 | 31 | 95.5% |
| Negros Island Region | 4 | ₱281.4M | 51.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 121 | ₱3.5B | 46.4 | 2 | 97.0% |
| Buildings and Facilities | 114 | ₱756.8M | 28.9 | 16 | 95.1% |
| Flood Control and Drainage | 32 | ₱745.9M | 41.2 | 1 | 99.0% |
| Water Provision and Storage | 12 | ₱42.9M | 28.1 | 0 | 96.9% |
| OTHER | 9 | ₱332.7M | 81.4 | 8 | 77.6% |
| Bridges | 8 | ₱107.5M | 40.9 | 0 | 100.0% |
| GAA 2025 SSP | 4 | ₱39.3M | 91.3 | 3 | 73.8% |
| GAA 2025 OO-1 | 2 | ₱81.6M | 91.7 | 1 | 90.9% |
| GAA 2025 OO-2 | 1 | ₱41.8M | 88.8 | 0 | 71.2% |
| Bridges, Roads | 1 | ₱69.8M | 52.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GE0005CONSTRUCTION OF CONCRETE ROAD-CONSTRUCTION OF SITIO COMIAN-SITIO DULIT, SAN ROQUE-SITIO CALIAN-SITIO PROPER-JCT. CIRCUMFERENTIAL ROAD, BARANGAY SAN ROQUE AND BARANGAY SALVACION, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱14.7M | 100% | High risk95 | Flagged0.011 |
| 25GE0037CONSTRUCTION OF MULTI PURPOSE BUILDING-CONSTRUCTION OF MULTI-PURPOSE BUILDING BLDG 5 IN MUNICIPALITY OF JORDAN, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱12.9M | 26% | High risk95 | Flagged0.034 |
| 25GE0017ROAD WIDENING-AT SPECIFIC LOCATIONS ALONG GUIMARAS CIRCUMFERENTIAL RD (S00028GR) K0084+460 - K0085+570 | Region VI | Guimaras DEO | On-Going | ₱66.7M | 82% | High risk94 | Flagged0.003 |
| 25GE0036ROAD SAFETY: ROADWAY LIGHTING - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) AT SPECIFIC LOCATIONS ALONG RIZAL-JORDAN WHARF RD (S00026GR) K0008 + (-632) - K0008 + 565 | Region VI | Guimaras DEO | On-Going | ₱6.8M | 69% | High risk92 | Flagged0.023 |
| 25GE0056ROAD WIDENING - AT SPECIFIC LOCATIONS ALONG GUIMARAS CIRCUMFERENTIAL RD (S00028GR) K0020+180 - K0020+480 | Region VI | Guimaras DEO | Completed | ₱14.9M | 100% | High risk89 | —-0.034 |
| 24G00088REHABILITATION OF THREE-STOREY ICT AND MULTIMEDIA CENTER, SAN ENRIQUE CAMPUS - ILOILO STATE UNIVERSITY OF FISHERIES SCIENCE AND TECHNOLOGY | Region VI | Region VI | On-Going | ₱14.9M | 56% | High risk89 | Flagged0.059 |
| 24GP0076CONSTRUCTION OF 2- STOREY 4- CLASSROOM SCHOOL BUILDING IN AGLALANA INTEGRATED SCHOOL, BRGY. AGLALANA, DUMARAO, CAPIZ | Region VI | Capiz 2nd DEO | On-Going | ₱15.6M | 100% | High risk89 | Flagged0.048 |
| 25GP0050CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER BASIN, BARANGAY POBLACION ILAWOD (UPSTREAM OF GUINOTOS OVERFLOW), DUMARAO, CAPIZ | Region VI | Capiz 2nd DEO | On-Going | ₱41.8M | 71% | High risk89 | —-0.006 |
| 25GE0008CONSTRUCTION OF MULTI-PURPOSE BUILDING-CONSTRUCTION OF MULTI-PURPOSE BUILDING, SALVACION NATIONAL HIGH SCHOOL, BARANGAY SALVACION, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱4.9M | 100% | High risk83 | —-0.019 |
| 24G00022ILOILO CIRCUMFERENTIAL RD 3, ILOILO | Region VI | Region VI | On-Going | ₱76.5M | 82% | High risk82 | Flagged0.013 |
| 24G00026PASSI BYPASS ROAD, ILOILO | Region VI | Region VI | On-Going | ₱86.3M | 48% | High risk82 | Flagged0.024 |
| 23GE0061CONSTRUCTION OF WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, MUNICIPALITY OF NUEVA VALENCIA, PROVINCE OF GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱29.4M | 71% | High risk79 | Flagged0.018 |
| 24GE0011CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF JCT. GUIMARAS CIRCUMFERENTIAL ROAD, SITIO ILAWOD, BARANGAY SALVACION TO SITIO BADANG, BARANGAY LUCMAYAN, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱21.8M | 99% | High risk79 | Flagged0.003 |
| 23GE0072CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OF MULTI-PURPOSE BUILDING, DR. CATALINO GALLEGO NAVA PROVINCIAL HOSPITAL EXTENSION BUILDING, SAN MIGUEL, JORDAN, GUIMARAS (PHASE II) | Region VI | Guimaras DEO | On-Going | ₱19.7M | 97% | High risk79 | Flagged0.007 |
| 25GE0022CONSTRUCTION OF OTHER BUILDING - CONSTRUCTION OF QUALITY ASSURANCE BUILDING, DPWH GUIMARAS DEO, SAN MIGUEL, JORDAN, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱29.3M | 45% | High risk78 | Flagged0.012 |
| 21GH0077CONSTRUCTION OF CONCRETE ROAD - NRJ PUERTO PRINCESA-SAN FRANCISCO ROAD LEADING TO BALARING BEACH RESORTS AND SITIO MIAO BEACH RESORTS, BAROTAC VIEJO, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱39.2M | 100% | High risk75 | —-0.030 |
| 24GE0072CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OF DR. CATALINO GALLEGO NAVA PROVINCIAL HOSPITAL, BRGY. SAN MIGUEL, JORDAN, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱19.7M | 0% | High risk72 | Flagged0.014 |
| 24GE0054CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OF MULTI-PURPOSE BUILDING (ACADEMIC BUILDING), MOSQUEDA CAMPUS, GUIMARAS STATE UNIVERSITY, ALAGUISOC, JORDAN, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱29.6M | 100% | High risk71 | —-0.056 |
| 24GE0017CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL SYSTEM IN BARANGAY STO. ROSARIO, BUENAVISTA, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱27.6M | 75% | High risk70 | Flagged0.003 |
| 25GE0025CONSTRUCTION OF SLOPE PROTECTION STRUCTURE-CONSTRUCTION OF ATGANG RIVER BANK SLOPE PROTECTION STRUCTURE ALONG GUIMARAS CIRCUMFERENTIAL ROAD, BARANGAY SAN ISIDRO, SIBUNAG, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱29.3M | 93% | High risk69 | —-0.014 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24G00088REHABILITATION OF THREE-STOREY ICT AND MULTIMEDIA CENTER, SAN ENRIQUE CAMPUS - ILOILO STATE UNIVERSITY OF FISHERIES SCIENCE AND TECHNOLOGY | Region VI | Region VI | On-Going | ₱14.9M | 56% | High risk89 | Flagged0.059 |
| 24GE0063CONSTRUCTION OF 2-STOREY 4-CLASSROOM SCHOOL BUILDING IN JORDAN NATIONAL HIGH SCHOOL, BRGY. POBLACION, JORDAN, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱15.6M | 0% | High risk62 | Flagged0.053 |
| 24GP0076CONSTRUCTION OF 2- STOREY 4- CLASSROOM SCHOOL BUILDING IN AGLALANA INTEGRATED SCHOOL, BRGY. AGLALANA, DUMARAO, CAPIZ | Region VI | Capiz 2nd DEO | On-Going | ₱15.6M | 100% | High risk89 | Flagged0.048 |
| 24G00113CONSTRUCTION OF MULTI-PURPOSE BUILDING, DON JUSTO V. VALMAYOR CAMPUS - CENTRAL PHILIPPINES STATE UNIVERSITY | Region VI | Region VI | On-Going | ₱9.9M | 0% | High risk61 | Flagged0.046 |
| 24GE0057CONCRETING OF SITIO BADYANG I TO SITIO BADYANG II, BRGY. IGCAWAYAN FMR, BRGY. IGCAWAYAN, SAN LORENZO, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱14.7M | 87% | High risk68 | Flagged0.035 |
| 24G00091COMPLETION/EQUIPPING OF SUPER HEALTH CENTERS- SIBALOM SUPER HEALTH CENTER, ANTIQUE | Region VI | Region VI | On-Going | ₱6M | 44% | Medium risk56 | Flagged0.034 |
| 25GE0037CONSTRUCTION OF MULTI PURPOSE BUILDING-CONSTRUCTION OF MULTI-PURPOSE BUILDING BLDG 5 IN MUNICIPALITY OF JORDAN, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱12.9M | 26% | High risk95 | Flagged0.034 |
| 18GE0150CONSTRUCTION OF 2STY2CL, SCIENCE LAB. G.I. ROOF SCHOOL BUILDING, AYANGAN NATIONAL HIGH SCHOOL | Region VI | Guimaras DEO | On-Going | ₱8.6M | 100% | Medium risk46 | Flagged0.025 |
| 18GE0149CONSTRUCTION OF 2STY2CL, ICT LAB. G.I. ROOF SCHOOL BUILDING, AYANGAN NATIONAL HIGH SCHOOL | Region VI | Guimaras DEO | On-Going | ₱8.6M | 100% | Medium risk46 | Flagged0.025 |
| 24G00026PASSI BYPASS ROAD, ILOILO | Region VI | Region VI | On-Going | ₱86.3M | 48% | High risk82 | Flagged0.024 |
| 25GE0036ROAD SAFETY: ROADWAY LIGHTING - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) AT SPECIFIC LOCATIONS ALONG RIZAL-JORDAN WHARF RD (S00026GR) K0008 + (-632) - K0008 + 565 | Region VI | Guimaras DEO | On-Going | ₱6.8M | 69% | High risk92 | Flagged0.023 |
| 24G00096CONSTRUCTION OF TRAINING CENTER BUILDING, JESUS FERMIN CAMPUS- CARLOS HILADO MEMORIAL STATE UNIVERSITY | Region VI | Region VI | On-Going | ₱14.7M | 29% | Medium risk45 | Flagged0.020 |
| 24G00073EXPANSION OF ITRDC BUILDING, SALVADOR CAMPUS | Region VI | Region VI | On-Going | ₱14.9M | 92% | High risk63 | Flagged0.019 |
| 23GE0061CONSTRUCTION OF WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, MUNICIPALITY OF NUEVA VALENCIA, PROVINCE OF GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱29.4M | 71% | High risk79 | Flagged0.018 |
| 24G00124CONSTRUCTION OF CLASSROOMS IN SIBALOM CAMPUS - UNIVERSITY OF ANTIQUE | Region VI | Region VI | On-Going | ₱14.8M | 37% | Medium risk45 | Flagged0.017 |
| 24G00122REHABILITATION OF EXISTING HOMEMAKING BUILDING, LEON CAMPUS - ILOILO SCIENCE AND TECHNOLOGY UNIVERSITY | Region VI | Region VI | On-Going | ₱7.9M | 86% | Medium risk60 | Flagged0.017 |
| 24G00123CONSTRUCTION OF SICOGON ISLAND WILDLIFE SANCTUARY PROTECTED AREA MANAGEMENT OFFICE (SIWS-PAMO) | Region VI | Region VI | On-Going | ₱3M | 87% | Low risk30 | Flagged0.017 |
| 24G00116LGU HOSPITALS- MAASIN, ILOILO INFIRMARY, ILOILO | Region VI | Region VI | On-Going | ₱19.8M | 91% | High risk62 | Flagged0.016 |
| 24G00132CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU- ALIMODIAN SUPER HEALTH CENTER, ILOILO | Region VI | Region VI | On-Going | ₱11.9M | 87% | High risk61 | Flagged0.016 |
| 24GE0072CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OF DR. CATALINO GALLEGO NAVA PROVINCIAL HOSPITAL, BRGY. SAN MIGUEL, JORDAN, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱19.7M | 0% | High risk72 | Flagged0.014 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 22GE0014ROAD WIDENING-AT SPECIFIC LOCATIONS ALONG GUIMARAS CIRCUMFERENTIAL RD (S00028GR) K0057+681-K0059+020 | Region VI | Guimaras DEO | Completed | ₱76.7M | 100% | Medium risk52 | —-0.077 |
| 52 | 24GE0020RECONSTRUCTION TO CONCRETE PAVEMENT - AT SPECIFIC LOCATIONS ALONG GUIMARAS CIRCUMFERENTIAL RD (S00028GR) K0019+300 - K0020+180 | Region VI | Guimaras DEO | On-Going | ₱84.9M | 62% | Medium risk52 | —-0.031 |
| 53 | 20GE0092PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-AT SPECIFIC LOCATIONS ALONG GUIMARAS CENTRAL RD, SAN MIGUEL-CONSTANCIA-CABANO-IGCAWAYAN (S00025GR) K0051+(-1127)-K0063+780, JORDAN/ SAN LORENZO, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱80.6M | 100% | Medium risk52 | —-0.076 |
| 54 | 22GE0024ROAD WIDENING-AT SPECIFIC LOCATIONS ALONG GUIMARAS CIRCUMFERENTIAL ROAD (S00028GR) K0037+000 - K0038+626 | Region VI | Guimaras DEO | Completed | ₱78.5M | 100% | Medium risk52 | —-0.077 |
| 55 | 18GE0079ROAD WIDENING-CENTRAL RD (SN MIGUEL-CONSTANCIA-CABANO-IGCAWAYAN) INCL. ROW-K0054+000-K0055+557 | Region VI | Guimaras DEO | Completed | ₱69.8M | 100% | Medium risk52 | —-0.079 |
| 56 | 22GE0038ROAD WIDENING-AT SPECIFIC LOCATIONS ALONG GUIMARAS CIRCUMFERENTIAL ROAD (S00028GR) K0031+000 - K0032+480 | Region VI | Guimaras DEO | Completed | ₱69.8M | 100% | Medium risk52 | —-0.080 |
| 57 | 22GE0037ROAD WIDENING - AT SPECIFIC LOCATIONS ALONG GUIMARAS CIRCUMFERENTIAL ROAD (S00028GR) K0034+459 - K0035+680 | Region VI | Guimaras DEO | Completed | ₱68.1M | 100% | Medium risk52 | —-0.080 |
| 58 | 24GE0024PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-AT SPECIFIC LOCATIONS ALONG GUIMARAS CIRCUMFERENTIAL RD (S00028GR) K0001+250-K0006+593 | Region VI | Guimaras DEO | Completed | ₱58.5M | 100% | Medium risk52 | —-0.082 |
| 59 | 18GE0091ROAD WIDENING-GUIMARAS CIRCUMFERENTIAL RD INCL. ROW - K0008+000-K0009+578 | Region VI | Guimaras DEO | Completed | ₱60.6M | 100% | Medium risk52 | —-0.082 |
| 60 | 23GE0029CONSTRUCTION OF FLOOD MITIGATION STRUCTURE- CONSTRUCTION OF RIVER CONTROL DIKE WITH ESPLANADE (PHASE III), BARANGAY POBLACION, JORDAN, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱72.4M | 100% | Medium risk51 | —-0.066 |
| 61 | 23GE0039CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF FLOOD CONTROL SYSTEM IN BARANGAY CANHAWAN, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱57.9M | 100% | Medium risk51 | —-0.067 |
| 62 | 18G00091CONSTRUCTION OF DILG GUIMARAS PROVINCIAL FIELD OFFICE | Region VI | Region VI | Completed | ₱4.7M | 100% | Medium risk50 | —-0.023 |
| 63 | 19GE0006CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE-ON SPECIFIC LOCATIONS ALONG GUIMARAS CIRCUMFERENTIAL RD (S00028GR) K0067+190-K0081+660 | Region VI | Guimaras DEO | Completed | ₱53.1M | 100% | Medium risk50 | —-0.076 |
| 64 | 22GB0051CONSTRUCTION OF BARANGAY IGBICAL-BONGBONGAN I-BRGY MASANAG, HAMTIC, ANTIQUE | Region VI | Antique DEO | Completed | ₱49.5M | 100% | Medium risk49 | —-0.082 |
| 65 | 22GI0024CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - JCT BANCAL LEON-ANTIQUE BDRY RD K0048+560-K0048+640 | Region VI | Iloilo 4th DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.085 |
| 66 | 22GA0032CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER BRGY. BAKHAW SUR, KALIBO, AKLAN | Region VI | Aklan DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.069 |
| 67 | 22GA0026CONSTRUCTION OF REVETMENT WALL ALONG AKLAN RIVER BRGY. MINA, LEZO, AKLAN | Region VI | Aklan DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.070 |
| 68 | 23GA0105CONSTRUCTION OF FLOOD CONTROL/REVETMENT WALL ALONG AKLAN RIVER BARANGAY TINIGAW, KALIBO, AKLAN | Region VI | Aklan DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.071 |
| 69 | 24GM0012REHABILITATION/MAJOR REPAIR OF BRIDGE-HILABANGAN BR. (B00269NR) ALONG KABANKALAN-BAIS RD, BRGY. HILAMONAN, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.057 |
| 70 | 22GM0034CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE AT SPECIFIC LOCATIONS ALONG CANDONI SIPALAY ROAD (S00256NR) K0146+150-K0162+300, SIPALAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱49M | 100% | Medium risk48 | —-0.087 |
| 71 | 22GJ0020CONSTRUCTION OF REVETMENT-CONSTRUCTION OF SLOPE PROTECTION, BRGY. TABUC-SUBA, JARO | Region VI | Iloilo City DEO | Completed | ₱49.8M | 100% | Medium risk48 | —-0.059 |
| 72 | 23GE0042CONSTRUCTION OF FLOOD MITIGATION FACILITY-CONSTRUCTION OF FLOOD MITIGATION FACILITY, BARANGAY RIZAL, JORDAN, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱49M | 100% | Medium risk48 | —-0.070 |
| 73 | 19GE0080CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-CONSTRUCTION OF RIVER CONTROL DIKE WITH ESPLANADE AT BRGY. POBLACION, JORDAN, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱49.1M | 100% | Medium risk48 | —-0.062 |
| 74 | 25GE0015CONSTRUCTION OF MULTI-PURPOSE BUILDING-CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, DPWH GUIMARAS DEO, SAN MIGUEL, JORDAN, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱19.5M | 96% | Medium risk48 | —-0.050 |
| 75 | 23GP0023CONSTRUCTION OF MULTI-PURPOSE BUILDING, DUMARAO, CAPIZ | Region VI | Capiz 2nd DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.084 |