304 projects on file, including joint ventures this contractor is part of.
Total projects
304
Total budget
₱5.7B
Average progress
95.6%
Completion rate
85.9%
Average risk score
40.5
Medium risk on average, out of 100
Flagged as unusual
31
10.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VI | 300 | ₱5.5B | 40.4 | 31 | 95.5% |
| Negros Island Region | 4 | ₱281.4M | 51.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 121 | ₱3.5B | 46.4 | 2 | 97.0% |
| Buildings and Facilities | 114 | ₱756.8M | 28.9 | 16 | 95.1% |
| Flood Control and Drainage | 32 | ₱745.9M | 41.2 | 1 | 99.0% |
| Water Provision and Storage | 12 | ₱42.9M | 28.1 | 0 | 96.9% |
| OTHER | 9 | ₱332.7M | 81.4 | 8 | 77.6% |
| Bridges | 8 | ₱107.5M | 40.9 | 0 | 100.0% |
| GAA 2025 SSP | 4 | ₱39.3M | 91.3 | 3 | 73.8% |
| GAA 2025 OO-1 | 2 | ₱81.6M | 91.7 | 1 | 90.9% |
| GAA 2025 OO-2 | 1 | ₱41.8M | 88.8 | 0 | 71.2% |
| Bridges, Roads | 1 | ₱69.8M | 52.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GE0005CONSTRUCTION OF CONCRETE ROAD-CONSTRUCTION OF SITIO COMIAN-SITIO DULIT, SAN ROQUE-SITIO CALIAN-SITIO PROPER-JCT. CIRCUMFERENTIAL ROAD, BARANGAY SAN ROQUE AND BARANGAY SALVACION, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱14.7M | 100% | High risk95 | Flagged0.011 |
| 25GE0037CONSTRUCTION OF MULTI PURPOSE BUILDING-CONSTRUCTION OF MULTI-PURPOSE BUILDING BLDG 5 IN MUNICIPALITY OF JORDAN, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱12.9M | 26% | High risk95 | Flagged0.034 |
| 25GE0017ROAD WIDENING-AT SPECIFIC LOCATIONS ALONG GUIMARAS CIRCUMFERENTIAL RD (S00028GR) K0084+460 - K0085+570 | Region VI | Guimaras DEO | On-Going | ₱66.7M | 82% | High risk94 | Flagged0.003 |
| 25GE0036ROAD SAFETY: ROADWAY LIGHTING - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) AT SPECIFIC LOCATIONS ALONG RIZAL-JORDAN WHARF RD (S00026GR) K0008 + (-632) - K0008 + 565 | Region VI | Guimaras DEO | On-Going | ₱6.8M | 69% | High risk92 | Flagged0.023 |
| 25GE0056ROAD WIDENING - AT SPECIFIC LOCATIONS ALONG GUIMARAS CIRCUMFERENTIAL RD (S00028GR) K0020+180 - K0020+480 | Region VI | Guimaras DEO | Completed | ₱14.9M | 100% | High risk89 | —-0.034 |
| 24G00088REHABILITATION OF THREE-STOREY ICT AND MULTIMEDIA CENTER, SAN ENRIQUE CAMPUS - ILOILO STATE UNIVERSITY OF FISHERIES SCIENCE AND TECHNOLOGY | Region VI | Region VI | On-Going | ₱14.9M | 56% | High risk89 | Flagged0.059 |
| 24GP0076CONSTRUCTION OF 2- STOREY 4- CLASSROOM SCHOOL BUILDING IN AGLALANA INTEGRATED SCHOOL, BRGY. AGLALANA, DUMARAO, CAPIZ | Region VI | Capiz 2nd DEO | On-Going | ₱15.6M | 100% | High risk89 | Flagged0.048 |
| 25GP0050CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER BASIN, BARANGAY POBLACION ILAWOD (UPSTREAM OF GUINOTOS OVERFLOW), DUMARAO, CAPIZ | Region VI | Capiz 2nd DEO | On-Going | ₱41.8M | 71% | High risk89 | —-0.006 |
| 25GE0008CONSTRUCTION OF MULTI-PURPOSE BUILDING-CONSTRUCTION OF MULTI-PURPOSE BUILDING, SALVACION NATIONAL HIGH SCHOOL, BARANGAY SALVACION, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱4.9M | 100% | High risk83 | —-0.019 |
| 24G00022ILOILO CIRCUMFERENTIAL RD 3, ILOILO | Region VI | Region VI | On-Going | ₱76.5M | 82% | High risk82 | Flagged0.013 |
| 24G00026PASSI BYPASS ROAD, ILOILO | Region VI | Region VI | On-Going | ₱86.3M | 48% | High risk82 | Flagged0.024 |
| 23GE0061CONSTRUCTION OF WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, MUNICIPALITY OF NUEVA VALENCIA, PROVINCE OF GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱29.4M | 71% | High risk79 | Flagged0.018 |
| 24GE0011CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF JCT. GUIMARAS CIRCUMFERENTIAL ROAD, SITIO ILAWOD, BARANGAY SALVACION TO SITIO BADANG, BARANGAY LUCMAYAN, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱21.8M | 99% | High risk79 | Flagged0.003 |
| 23GE0072CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OF MULTI-PURPOSE BUILDING, DR. CATALINO GALLEGO NAVA PROVINCIAL HOSPITAL EXTENSION BUILDING, SAN MIGUEL, JORDAN, GUIMARAS (PHASE II) | Region VI | Guimaras DEO | On-Going | ₱19.7M | 97% | High risk79 | Flagged0.007 |
| 25GE0022CONSTRUCTION OF OTHER BUILDING - CONSTRUCTION OF QUALITY ASSURANCE BUILDING, DPWH GUIMARAS DEO, SAN MIGUEL, JORDAN, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱29.3M | 45% | High risk78 | Flagged0.012 |
| 21GH0077CONSTRUCTION OF CONCRETE ROAD - NRJ PUERTO PRINCESA-SAN FRANCISCO ROAD LEADING TO BALARING BEACH RESORTS AND SITIO MIAO BEACH RESORTS, BAROTAC VIEJO, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱39.2M | 100% | High risk75 | —-0.030 |
| 24GE0072CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OF DR. CATALINO GALLEGO NAVA PROVINCIAL HOSPITAL, BRGY. SAN MIGUEL, JORDAN, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱19.7M | 0% | High risk72 | Flagged0.014 |
| 24GE0054CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OF MULTI-PURPOSE BUILDING (ACADEMIC BUILDING), MOSQUEDA CAMPUS, GUIMARAS STATE UNIVERSITY, ALAGUISOC, JORDAN, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱29.6M | 100% | High risk71 | —-0.056 |
| 24GE0017CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL SYSTEM IN BARANGAY STO. ROSARIO, BUENAVISTA, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱27.6M | 75% | High risk70 | Flagged0.003 |
| 25GE0025CONSTRUCTION OF SLOPE PROTECTION STRUCTURE-CONSTRUCTION OF ATGANG RIVER BANK SLOPE PROTECTION STRUCTURE ALONG GUIMARAS CIRCUMFERENTIAL ROAD, BARANGAY SAN ISIDRO, SIBUNAG, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱29.3M | 93% | High risk69 | —-0.014 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24G00088REHABILITATION OF THREE-STOREY ICT AND MULTIMEDIA CENTER, SAN ENRIQUE CAMPUS - ILOILO STATE UNIVERSITY OF FISHERIES SCIENCE AND TECHNOLOGY | Region VI | Region VI | On-Going | ₱14.9M | 56% | High risk89 | Flagged0.059 |
| 24GE0063CONSTRUCTION OF 2-STOREY 4-CLASSROOM SCHOOL BUILDING IN JORDAN NATIONAL HIGH SCHOOL, BRGY. POBLACION, JORDAN, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱15.6M | 0% | High risk62 | Flagged0.053 |
| 24GP0076CONSTRUCTION OF 2- STOREY 4- CLASSROOM SCHOOL BUILDING IN AGLALANA INTEGRATED SCHOOL, BRGY. AGLALANA, DUMARAO, CAPIZ | Region VI | Capiz 2nd DEO | On-Going | ₱15.6M | 100% | High risk89 | Flagged0.048 |
| 24G00113CONSTRUCTION OF MULTI-PURPOSE BUILDING, DON JUSTO V. VALMAYOR CAMPUS - CENTRAL PHILIPPINES STATE UNIVERSITY | Region VI | Region VI | On-Going | ₱9.9M | 0% | High risk61 | Flagged0.046 |
| 24GE0057CONCRETING OF SITIO BADYANG I TO SITIO BADYANG II, BRGY. IGCAWAYAN FMR, BRGY. IGCAWAYAN, SAN LORENZO, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱14.7M | 87% | High risk68 | Flagged0.035 |
| 24G00091COMPLETION/EQUIPPING OF SUPER HEALTH CENTERS- SIBALOM SUPER HEALTH CENTER, ANTIQUE | Region VI | Region VI | On-Going | ₱6M | 44% | Medium risk56 | Flagged0.034 |
| 25GE0037CONSTRUCTION OF MULTI PURPOSE BUILDING-CONSTRUCTION OF MULTI-PURPOSE BUILDING BLDG 5 IN MUNICIPALITY OF JORDAN, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱12.9M | 26% | High risk95 | Flagged0.034 |
| 18GE0150CONSTRUCTION OF 2STY2CL, SCIENCE LAB. G.I. ROOF SCHOOL BUILDING, AYANGAN NATIONAL HIGH SCHOOL | Region VI | Guimaras DEO | On-Going | ₱8.6M | 100% | Medium risk46 | Flagged0.025 |
| 18GE0149CONSTRUCTION OF 2STY2CL, ICT LAB. G.I. ROOF SCHOOL BUILDING, AYANGAN NATIONAL HIGH SCHOOL | Region VI | Guimaras DEO | On-Going | ₱8.6M | 100% | Medium risk46 | Flagged0.025 |
| 24G00026PASSI BYPASS ROAD, ILOILO | Region VI | Region VI | On-Going | ₱86.3M | 48% | High risk82 | Flagged0.024 |
| 25GE0036ROAD SAFETY: ROADWAY LIGHTING - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) AT SPECIFIC LOCATIONS ALONG RIZAL-JORDAN WHARF RD (S00026GR) K0008 + (-632) - K0008 + 565 | Region VI | Guimaras DEO | On-Going | ₱6.8M | 69% | High risk92 | Flagged0.023 |
| 24G00096CONSTRUCTION OF TRAINING CENTER BUILDING, JESUS FERMIN CAMPUS- CARLOS HILADO MEMORIAL STATE UNIVERSITY | Region VI | Region VI | On-Going | ₱14.7M | 29% | Medium risk45 | Flagged0.020 |
| 24G00073EXPANSION OF ITRDC BUILDING, SALVADOR CAMPUS | Region VI | Region VI | On-Going | ₱14.9M | 92% | High risk63 | Flagged0.019 |
| 23GE0061CONSTRUCTION OF WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, MUNICIPALITY OF NUEVA VALENCIA, PROVINCE OF GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱29.4M | 71% | High risk79 | Flagged0.018 |
| 24G00124CONSTRUCTION OF CLASSROOMS IN SIBALOM CAMPUS - UNIVERSITY OF ANTIQUE | Region VI | Region VI | On-Going | ₱14.8M | 37% | Medium risk45 | Flagged0.017 |
| 24G00122REHABILITATION OF EXISTING HOMEMAKING BUILDING, LEON CAMPUS - ILOILO SCIENCE AND TECHNOLOGY UNIVERSITY | Region VI | Region VI | On-Going | ₱7.9M | 86% | Medium risk60 | Flagged0.017 |
| 24G00123CONSTRUCTION OF SICOGON ISLAND WILDLIFE SANCTUARY PROTECTED AREA MANAGEMENT OFFICE (SIWS-PAMO) | Region VI | Region VI | On-Going | ₱3M | 87% | Low risk30 | Flagged0.017 |
| 24G00116LGU HOSPITALS- MAASIN, ILOILO INFIRMARY, ILOILO | Region VI | Region VI | On-Going | ₱19.8M | 91% | High risk62 | Flagged0.016 |
| 24G00132CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU- ALIMODIAN SUPER HEALTH CENTER, ILOILO | Region VI | Region VI | On-Going | ₱11.9M | 87% | High risk61 | Flagged0.016 |
| 24GE0072CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OF DR. CATALINO GALLEGO NAVA PROVINCIAL HOSPITAL, BRGY. SAN MIGUEL, JORDAN, GUIMARAS | Region VI | Guimaras DEO | On-Going | ₱19.7M | 0% | High risk72 | Flagged0.014 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 21GE0024CONSTRUCTION OF CONCRETE ROAD-CONCRETING OF ROAD, DOLORES-GUIWAD, BARANGAY DOLORES, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱18.6M | 100% | Medium risk45 | —-0.087 |
| 152 | 25GE0006CONSTRUCTION OF CONCRETE ROAD-CONSTRUCTION OF SITIO ILAWOD-PUBLIC CEMETERY SALVACION-SITIO BADANG, LUCMAYAN ROAD, BARANGAY SALVACION AND BARANGAY LUCMAYAN, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱14.7M | 100% | Medium risk45 | —-0.087 |
| 153 | 20GE0062PREVENTIVE MAINTENANCE OF ROAD: CONCRETE REBLOCKING 280MM - AT SPECIFIC LOCATIONS ALONG GUIMARAS CIRCUMFERENTIAL RD (S00028GR) K0004+981 - K0097+900 | Region VI | Guimaras DEO | Completed | ₱20.5M | 100% | Medium risk45 | —-0.086 |
| 154 | 21G00124ILOILO CIRCUMFERENTIAL ROAD 2 (C2), ILOILO | Region VI | Region VI | Completed | ₱28M | 100% | Medium risk45 | —-0.065 |
| 155 | 22GE0013ROAD WIDENING AT SPECIFIC LOCATIONS ALONG CENTRAL RD (SN MIGUEL-CONSTANCIA-CABANO-IGCAWAYAN) (S00025GR) K0062+000 - K0062+630 | Region VI | Guimaras DEO | Completed | ₱27.7M | 100% | Medium risk45 | —-0.085 |
| 156 | 22GE0045OFF-CARRIAGEWAY IMPROVEMENT-PAVING OF SHOULDERS-AT SPECIFIC LOCATIONS ALONG GUIMARAS CIRCUMFERENTIAL RD (S00028GR) K0024+1010-K0025+800 | Region VI | Guimaras DEO | Completed | ₱26.8M | 100% | Medium risk45 | —-0.085 |
| 157 | 19GE0016CONSTRUCTION OF CONCRETE ROAD-JORDAN-HOSKYN-SANAO ROAD LEADING TO BALA-AN BUKID SHRINE, BARAS BEACH RESORT & BALCON MARINE PROTECTED AREA, CBRT HOSKYN, RORO AND MONKEY SANCTUARY, BRGY. HOSKYN, JORDAN, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱27.9M | 100% | Medium risk45 | —-0.086 |
| 158 | 18GE0058PREVENTIVE MAINTENANCE OF ROAD: CONCRETE REBLOCKING-GUIMARAS CIRCUMFERENTIAL RD K0031+602-K0031+936, K0032+000-K0032+629, K0035+000-K0035+150, K0037+540-K0037+643, K0038+134-K0038+235, K0041+000-K0041+604 | Region VI | Guimaras DEO | Completed | ₱22M | 100% | Medium risk45 | —-0.086 |
| 159 | 20GE0029CONSTRUCTION OF CONCRETE ROAD - STA. TERESA - ESPINOSA ROAD ACCESS LEADING TO CABALING BEACH RESORT AT BARANGAY ESPINOSA, JORDAN, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱27.9M | 100% | Medium risk45 | —-0.086 |
| 160 | 21G00123CONSTRUCTION OF GRAVEL ROAD - ILOILO R-1 BYPASS ROAD, ILOILO | Region VI | Region VI | Completed | ₱27.2M | 100% | Medium risk45 | —-0.086 |
| 161 | 22GE0048REHABILITATION OF CONCRETE ROAD-IMPROVEMENT OF SAN MIGUEL TO SEBASTE ROAD, BRGY. SAN MIGUEL, JORDAN TO BRGY. SEBASTE, SIBUNAG, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱19.6M | 100% | Medium risk45 | —-0.087 |
| 162 | 20GE0052MODIFIED STANDARD DPWH-DEPED TWO (2) STOREY, FOUR (4) CLASSROOM SCHOOL BUILDING, SAN MIGUEL CENTRAL SCHOOL | Region VI | Guimaras DEO | Completed | ₱10.3M | 100% | Medium risk45 | —-0.041 |
| 163 | 22GE0047CONSTRUCTION OF CONCRETE ROAD-CONSTRUCTION OF SITIO PAG-ASA TO SITIO TOONG ROAD, BARANGAY CABALAGNAN, NUEVA VALENCIA, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱4.9M | 100% | Medium risk45 | —-0.083 |
| 164 | 21G00122PASSI BY-PASS ROAD, ILOILO | Region VI | Region VI | Completed | ₱27.7M | 100% | Medium risk45 | —-0.085 |
| 165 | 23GB0005BRGY. SAN RAMON-BRGY. LATAZON-BRGY. LIBERATO ROAD CONNECTING TO ILOILO-ANTIQUE ROAD, PUBLIC MARKET O | Region VI | Antique DEO | Completed | ₱9.8M | 100% | Medium risk45 | —-0.088 |
| 166 | 24GE0010CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF SITIO CALAPARAN TO SITIO PANDAN ROAD, BARANGAY GABAN, SAN LORENZO, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱14.8M | 100% | Medium risk45 | —-0.081 |
| 167 | 19GE0001CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD-ALONG RIZAL-JORDAN WHARF (S00026GR) K0008+(-408) - K0008+565 | Region VI | Guimaras DEO | Completed | ₱18.6M | 100% | Medium risk45 | —-0.085 |
| 168 | 18GE0024CONSTRUCTION OF CONCRETE ROAD-TANGAW BRIDGE-CABANO PROPER ROAD LEADING TO PAYAG PAYAG SA SAN LORENZO, MUNICIPAL HALL, WIND MILL SITE, CABANO RORO WHARF, PASALUBONG CENTER, TUMANDA WHARF, BANANA PLANTATION AND SPRING BLOOM, BRGY. CABANO, SAN LORENZO, GUIM. | Region VI | Guimaras DEO | Completed | ₱18.6M | 100% | Medium risk45 | —-0.086 |
| 169 | 18GE0025CONSTRUCTION OF CONCRETE ROAD-DARAGAN-RIZAL ROAD LEADING TO MINIATURE YACHT/GALLEON MAKER'S & GUIMARAS MOUNTAIN RESORT, MARIAN SHRINE, MARCEILY POINT, BUENAVISTA WHARF, BRGY. RIZAL, BUENAVISTA, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱18.6M | 100% | Medium risk45 | —-0.087 |
| 170 | 18GE0039CONSTRUCTION OF CONCRETE ROAD-SALVACION-ZALDIVAR-DAGSAAN ROAD LEADING TO DAGSA-AN ECO PARK & SALVACION HOSTING CENTER, BRGY. DAGSA-AN, BUENAVISTA, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱18.6M | 100% | Medium risk45 | —-0.087 |
| 171 | 18GE0023CONSTRUCTION OF CONCRETE ROAD-NAVALAS-SAN MIGUEL-GETULIO ROAD LEADING TO NAVALAS CHURCH, ROCA ENCANTADA, SIETE PECADOS BOLANG MOROS CAVE AND RUINS OF PORTLAND CEMENT PLANT, BRGY. NAVALAS, BUENAVISTA, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱18.6M | 100% | Medium risk45 | —-0.087 |
| 172 | 24GE0016CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF UMILIG ROAD SECTION (PLAZA TO LIGUERAN SAMBAG TO UMILIG ROAD SECTION), BARANGAY UMILIG, BUENAVISTA, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱14.8M | 100% | Medium risk45 | —-0.087 |
| 173 | 23GJ0128PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ILOILO - ANTIQUE RD (S00016PN) K0003+(-537) - K0003+(-130), (S00019PN) K0001+000 - K0001+600 | Region VI | Iloilo City DEO | Completed | ₱16.1M | 100% | Medium risk45 | —-0.087 |
| 174 | 22GE0042CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD - AT SPECIFIC LOCATIONS ALONG GUIMARAS CIRCUMFERENTIAL RD (S00028GR) K0008+165 - K0008+235, (S00029GR) K0000+211 - K0000+375 | Region VI | Guimaras DEO | Completed | ₱17M | 100% | Medium risk45 | —-0.087 |
| 175 | 20GE0064CONSTRUCTION OF CONCRETE ROAD-CONCORDIA NORTE-AYANGAN ROAD LEADING TO SPRING BLOOM FARM, CAMP ALFREDO, VALLE VERDE MT. RESORT, OCEAN VIEW MINIATURE GOLF COURSE, SUN SET AND WOODLAND BIKE PARK, BGY. AYANGAN, SIBUNAG, GUIMARAS | Region VI | Guimaras DEO | Completed | ₱19.3M | 100% | Medium risk45 | —-0.086 |