Contractor dossier
63 projects on file, including joint ventures this contractor is part of.
Total projects
63
Total budget
₱4B
Average progress
90.0%
Completion rate
74.6%
Average risk score
50.1
Medium risk on average, out of 100
Flagged as unusual
9
14.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 54 | ₱3.5B | 49.0 | 8 | 89.3% |
| Region VII | 6 | ₱384.9M | 60.9 | 1 | 91.6% |
| Region X | 3 | ₱128.6M | 47.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 34 | ₱1.8B | 44.7 | 3 | 88.2% |
| Flood Control and Drainage | 14 | ₱1.1B | 48.2 | 1 | 99.6% |
| Bridges | 4 | ₱367.3M | 52.9 | 0 | 96.8% |
| GAA 2025 SSP | 3 | ₱84.1M | 94.5 | 2 | 50.2% |
| Buildings and Facilities | 3 | ₱33.7M | 20.5 | 0 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱197.2M | 94.2 | 2 | 71.9% |
| OTHER | 2 | ₱304.8M | 84.4 | 1 | 97.4% |
| Bridges, Roads | 1 | ₱81.2M | 48.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25N00205INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG MAHARLIKA HIGHWAY (LIPATA-SURIGAO SECT)-K1116+320-K1120+550 | Region XIII | Region XIII | On-Going | ₱64M | 4% | High risk95 | Flagged0.033 |
| 25NG0095CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. TRINIDAD, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱9.9M | 46% | High risk95 | Flagged0.019 |
| 25HB0002ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - LOAY INTERIOR RD - K0161 + 000 - K0162 + 056, K0164 + 000 - K0166 + 35 | Region VII | Bohol 3rd DEO | On-Going | ₱71.4M | 50% | High risk94 | Flagged0.015 |
| 25N00007MAHARLIKA HIGHWAY (SURIGAO- AGUSAN SECT)- K1151+360 - K1152+012.20 - K1152+298 - K1153+461.8, K1153+728 - K1155+683, K1155+711 - K1155+765.8, K1155+861 - K1156+128 | Region XIII | Region XIII | On-Going | ₱125.8M | 94% | High risk94 | Flagged0.008 |
| 25N00009PREVENTIVE MAINTENANCE-PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (SURIGAO-AGUSAN SECT)- K1147+093 - K1147+590 | Region XIII | Region XIII | Completed | ₱10.2M | 100% | High risk93 | —-0.021 |
| 24N00128CONSTRUCTION OF REVETMENT ALONG SURIGAO RIVER, PHASE 2, LUNA SECTION, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Region XIII | On-Going | ₱192.7M | 95% | High risk91 | Flagged0.063 |
| 21N00009ACCESS ROAD (TAGBUYAWAN, MAINIT ROAD) LEADING TO WEST COASTAL PEBBLE BEACH, SURIGAO DEL NORTE | Region XIII | Region XIII | Completed | ₱112.1M | 100% | High risk78 | —-0.018 |
| 23NG0088CONSTRUCTION OF REVETMENT ALONG SURIGAO RIVER, BONIFACIO SECTION, SURIGAO CITY, SURIGAO DEL NORTE/BRGY. BONIFACIO, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱110.8M | 94% | High risk67 | Flagged0.035 |
| 22H00003ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, MARCELO FERNAN BR. (B00619CB) ALONG MARCELO B. FERNAN BR. & APPROACHES, CEBU PROVINCE | Region VII | Region VII | Completed | ₱144.7M | 100% | High risk65 | —-0.033 |
| 23HO0026ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL AT SITIO LUWAK - SITIO PARALE, BRGY. SALM | Region VII | Cebu 7th DEO | Completed | ₱96.3M | 100% | High risk64 | —-0.066 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24N00128CONSTRUCTION OF REVETMENT ALONG SURIGAO RIVER, PHASE 2, LUNA SECTION, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Region XIII | On-Going | ₱192.7M | 95% | High risk91 | Flagged0.063 |
| 23NG0088CONSTRUCTION OF REVETMENT ALONG SURIGAO RIVER, BONIFACIO SECTION, SURIGAO CITY, SURIGAO DEL NORTE/BRGY. BONIFACIO, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱110.8M | 94% | High risk67 | Flagged0.035 |
| 25N00205INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG MAHARLIKA HIGHWAY (LIPATA-SURIGAO SECT)-K1116+320-K1120+550 | Region XIII | Region XIII | On-Going | ₱64M | 4% | High risk95 | Flagged0.033 |
| 23NG0099ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (SURIGAO-AGUSAN SECTION) - K1126+982.75 - K1127+903.08, BRGY. BONIFACIO, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱96.4M | 0% | Medium risk57 | Flagged0.032 |
| 23NG0102PREVENTIVE MAINTENANCE SECONDARY ROADS SURIGAO - DAVAO COASTAL ROAD/SURIGAO-DAVAO COASTAL ROAD, K1150+300 - K1152+000.00 | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱68.8M | 0% | Medium risk51 | Flagged0.029 |
| 25NG0095CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. TRINIDAD, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱9.9M | 46% | High risk95 | Flagged0.019 |
| 25HB0002ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - LOAY INTERIOR RD - K0161 + 000 - K0162 + 056, K0164 + 000 - K0166 + 35 | Region VII | Bohol 3rd DEO | On-Going | ₱71.4M | 50% | High risk94 | Flagged0.015 |
| 25N00007MAHARLIKA HIGHWAY (SURIGAO- AGUSAN SECT)- K1151+360 - K1152+012.20 - K1152+298 - K1153+461.8, K1153+728 - K1155+683, K1155+711 - K1155+765.8, K1155+861 - K1156+128 | Region XIII | Region XIII | On-Going | ₱125.8M | 94% | High risk94 | Flagged0.008 |
| 24NG0066CONCRETING OF SITIO LAPAZ, BRGY. SERNA TO BRGY. POCTOY FMR, BRGY. SERNA AND BRGY.POCTOY / BRGY. SERNA - BRGY.POCTOY, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱14.9M | 82% | Medium risk42 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25N00205INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG MAHARLIKA HIGHWAY (LIPATA-SURIGAO SECT)-K1116+320-K1120+550 | Region XIII | Region XIII | On-Going | ₱64M | 4% | High risk95 | Flagged0.033 |
| 2 | 25NG0095CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. TRINIDAD, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱9.9M | 46% | High risk95 | Flagged0.019 |
| 3 | 25HB0002ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - LOAY INTERIOR RD - K0161 + 000 - K0162 + 056, K0164 + 000 - K0166 + 35 | Region VII | Bohol 3rd DEO | On-Going | ₱71.4M | 50% | High risk94 | Flagged0.015 |
| 4 | 25N00007MAHARLIKA HIGHWAY (SURIGAO- AGUSAN SECT)- K1151+360 - K1152+012.20 - K1152+298 - K1153+461.8, K1153+728 - K1155+683, K1155+711 - K1155+765.8, K1155+861 - K1156+128 | Region XIII | Region XIII | On-Going | ₱125.8M | 94% | High risk94 | Flagged0.008 |
| 5 | 25N00009PREVENTIVE MAINTENANCE-PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (SURIGAO-AGUSAN SECT)- K1147+093 - K1147+590 | Region XIII | Region XIII | Completed | ₱10.2M | 100% | High risk93 | —-0.021 |
| 6 | 24N00128CONSTRUCTION OF REVETMENT ALONG SURIGAO RIVER, PHASE 2, LUNA SECTION, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Region XIII | On-Going | ₱192.7M | 95% | High risk91 | Flagged0.063 |
| 7 | 21N00009ACCESS ROAD (TAGBUYAWAN, MAINIT ROAD) LEADING TO WEST COASTAL PEBBLE BEACH, SURIGAO DEL NORTE | Region XIII | Region XIII | Completed | ₱112.1M | 100% | High risk78 | —-0.018 |
| 8 | 23NG0088CONSTRUCTION OF REVETMENT ALONG SURIGAO RIVER, BONIFACIO SECTION, SURIGAO CITY, SURIGAO DEL NORTE/BRGY. BONIFACIO, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱110.8M | 94% | High risk67 | Flagged0.035 |
| 9 | 22H00003ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES, MARCELO FERNAN BR. (B00619CB) ALONG MARCELO B. FERNAN BR. & APPROACHES, CEBU PROVINCE | Region VII | Region VII | Completed | ₱144.7M | 100% | High risk65 | —-0.033 |
| 10 | 23HO0026ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL AT SITIO LUWAK - SITIO PARALE, BRGY. SALM | Region VII | Cebu 7th DEO | Completed | ₱96.3M | 100% | High risk64 | —-0.066 |
| 11 | 23NG0099ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (SURIGAO-AGUSAN SECTION) - K1126+982.75 - K1127+903.08, BRGY. BONIFACIO, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱96.4M | 0% | Medium risk57 | Flagged0.032 |
| 12 | 23N00181CONSTRUCTION OF REVETMENT ALONG SURIGAO RIVER, SERNA SECTION, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Region XIII | Completed | ₱193M | 100% | Medium risk56 | —-0.038 |
| 13 | 24N00190DAANG MAHARLIKA (SURIGAO-AGUSAN SECT)- K1153+200- K1153+580, K1153+640- K1153+780, K1153+920- K1155+780, K1155+820- K1156+820 | Region XIII | Region XIII | On-Going | ₱183.3M | 40% | Medium risk55 | —-0.026 |
| 14 | 23NG0128REHABILITATION/RECONSTRUCTION OF TINAGO FLOOD CONTROL, RIGHT BANK/BRGY. TINAGO, MALIMONO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱144.7M | 100% | Medium risk54 | —-0.053 |
| 15 | 25NG0040REHABILITATION OF ROAD, NRJ RIZAL - TOGBONGON - MAT-I - MABINI - TRINIDAD ROAD (PACKAGE 1), SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱144.6M | 89% | Medium risk54 | —-0.046 |
| 16 | 23HC0034RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES- CLUSTER I 1.) MAUBID BR. (B00162BH) ALONG TAGBILARAN NORTH RD (TAGBILARAN-JETAFE SECTION)= P4,508,000.00 2.) QUEZON BR. (B00195BH) ALONG TAGBILARAN NORTH RD (TAGBILARAN-JETAFE SECTION)= P22,540,000.00 | Region VII | Bohol 2nd DEO | Completed | ₱62.1M | 100% | Medium risk53 | —-0.052 |
| 17 | 23NG0130REHABILITATION/RECONSTRUCTION OF MAGTIACO FLOOD CONTROL/BRGY. SAN PEDRO, ALEGRIA SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱144.7M | 100% | Medium risk52 | —-0.053 |
| 18 | 20N00013ACCESS ROAD (TAGBUYAWAN- MAINIT ROAD) LEADING TO WEST COASTAL ROAD PEBBLE BEACH, MAINIT, SURIGAO DEL NORTE | Region XIII | Region XIII | Completed | ₱144.7M | 100% | Medium risk52 | —-0.069 |
| 19 | 23NG0102PREVENTIVE MAINTENANCE SECONDARY ROADS SURIGAO - DAVAO COASTAL ROAD/SURIGAO-DAVAO COASTAL ROAD, K1150+300 - K1152+000.00 | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱68.8M | 0% | Medium risk51 | Flagged0.029 |
| 20 | 25NG0015BRIDGE PROGRAM - RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, TAGANITO BR.1 (B00992MN) ALONG SURIGAO - DAVAO COASTAL RD / CLAVER, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱125.4M | 94% | Medium risk51 | —-0.009 |
| 21 | 19KC0030CONSTRUCTION OF CONCRETE ROAD TALAKAG BY-PASS ROAD, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱57.7M | 100% | Medium risk51 | —-0.090 |
| 22 | 17NF0172OFF-CARRIAGEWAY IMPROVEMENT, PRIMARY ROADS / DAANG MAHARLIKA (SURIGAO-AGUSAN SECTION), LSK 1124+273 - K1124+402; K1125+494 - K1125+790;K1126+134 - K1128+716; RSK 1125+494 - K1126+115; K1126+520 - K1128+716; BS5 1132+000 - K1133+127, BRGY. LUNA-BRGY.BONIFA | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱56M | 100% | Medium risk51 | —-0.055 |
| 23 | 23NG0126REHABILITATION/RECONSTRUCTION OF MASGAD FLOOD CONTROL/ BRGY. MASGAD, MALIMONO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱144.7M | 100% | Medium risk51 | —-0.053 |
| 24 | 17N00088OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, DAANG MAHARLIKA 9SURIGAO - AGUSAN SECT.), K1143+853-K1145+437, K1145+540-K1146+000, K1147+092- K1148+000, PLACER, SURIGAO DEL NORTE 1ST | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱73.9M | 100% | Medium risk51 | —-0.054 |
| 25 | 22NG0014CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SURIGAO RIVER / BRGY. QUEZON, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱96.5M | 100% | Medium risk50 | —-0.061 |