Opening the dossier…
Opening the dossier…
Contractor dossier
54 projects on file, including joint ventures this contractor is part of.
Total projects
54
Total budget
₱4.3B
Average progress
98.9%
Completion rate
48.1%
Below 70%
Average risk score
52.3
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 30 | ₱3B | 60.5 | 0 | 99.6% |
| Region X | 7 | ₱329.9M | 39.2 | 0 | 98.4% |
| Region XII | 7 | ₱187.3M | 25.8 | 0 | 100.0% |
| Region VII | 4 | ₱382.4M | 56.8 | 0 | 100.0% |
| Region V | 2 | ₱163.7M | 64.4 | 0 | 86.0% |
| Cordillera Administrative Region | 2 | ₱103.3M | 51.9 | 0 | 100.0% |
| Region IV-B | 1 | ₱77.9M | 48.4 | 0 | 90.9% |
| Region IV-A | 1 | ₱16.3M | 43.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 32 | ₱2.7B | 53.4 | 0 | 99.1% |
| Flood Control and Drainage | 10 | ₱940.6M | 56.8 | 0 | 100.0% |
| Buildings and Facilities | 10 | ₱513.3M | 43.2 | 0 | 97.0% |
| Bridges, Roads | 2 | ₱146.6M | 56.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24FG0131CONSTRUCTION OF GOA COMMUNITY COLLEGE, GOA, CAMARINES SUR | Region V | Camarines Sur 4th DEO | On-Going | ₱97.6M | 72% | High risk68 | —-0.038 |
| 24LE0054CONSTRUCTION OF MULTI-PURPOSE FACILITIES (EVACUATION CENTER), DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | On-Going | ₱148.5M | 100% | High risk66 | —-0.025 |
| 24LE0007ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF ROADS W/ SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROADS- DAVAO-SARANGANI COASTAL ROAD (MALALAG-MALITA-JAS-G), K1682 + 307 - K1682 +750, DON MARCELINO, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | On-Going | ₱140.4M | 100% | High risk66 | —-0.027 |
| 24LE0006ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF ROADS W/ SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROADS- DAVAO-SARANGANI COASTAL ROAD (MALALAG-MALITA-JAS-G), K1681 + 886 - K1682 + 307, DON MARCELINO, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | On-Going | ₱139.4M | 100% | High risk65 | —-0.027 |
| 24LE0012ASSET PRESERVATION REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-TERTIARY ROADS H-WAY JCT MANA-TICULON-LAGUMIT-LITTLE BAGUIO RD K1657+240 K1657+340, LAGUMIT SECTION, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | On-Going | ₱134.7M | 100% | High risk64 | —-0.032 |
| 24LE0013ASSET PRESERVATION REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-TERTIARY ROADS H-WAY JCT MANA-TICULON-LAGUMIT-LITTLE BAGUIO RD K1657+340 -K1657+440, LAGUMIT SECTION, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | On-Going | ₱134.7M | 100% | High risk64 | —-0.032 |
| 24LE0011ASSET PRESERVATION REHABILITATION/ RECONSTRUCTION OF ROADS W/ SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-TERTIARY ROADS-DEMOLOC-LAGUMIT-LITTLE BAGUIO- ALABEL ROAD, K1646 + 353 -K1646 + 483, MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | On-Going | ₱133.9M | 100% | High risk64 | —-0.033 |
| 24LE0017CONSTRUCTION OF CONCRETE REVETMENT, DEMOLOC FLOOD CONTROL, MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | On-Going | ₱116.6M | 100% | High risk63 | —-0.024 |
| 24LE0019CONSTRUCTION OF CONCRETE REVETMENT, KILALAG FLOOD CONTROL, MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | On-Going | ₱116.6M | 100% | High risk63 | —-0.023 |
| 24LE0015NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS NUING-SAN ISIDRO-MOLMOL-LAGUMIT-GLAN ROAD, DAVAO OCCIDENTAL, JOSE ABAD SANTOS, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | On-Going | ₱96.5M | 100% | High risk62 | —-0.025 |
| 24LE0010ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF ROADS W/ SLIPS, SLOPE COLLAPSE, AND LANDSLIDE- TERTIARY ROADS-DEMOLOC-LITTLE BAGUIO-ALABEL ROAD, K1646 + 228 K1646 + 353, MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | On-Going | ₱128.7M | 100% | High risk62 | —-0.035 |
| 23LE0057CONSTRUCTION OF SEAWALL, BRGY. LACARON, MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | On-Going | ₱96.5M | 100% | High risk62 | —-0.018 |
| 24LE0020CONSTRUCTION OF CONCRETE REVETMENT, LAPUAN FLOOD CONTROL, DON MARCELINO, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱116.6M | 100% | High risk62 | —-0.054 |
| 23LE0046CONSTRUCTION OF ROAD, SITIO ABAG-MT. KYAWA, STA. MARIA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | On-Going | ₱96.5M | 100% | High risk62 | —-0.033 |
| 24LE0023CONSTRUCTION OF WAVE BREAKER, LAMIDAN SEAWALL, DON MARCELINO, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | On-Going | ₱116.6M | 100% | High risk62 | —-0.020 |
| 23LE0050CONSTRUCTION OF PANGIAN-PINALPALAN ROAD, MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | On-Going | ₱96.5M | 100% | High risk62 | —-0.033 |
| 23LE0048CONSTRUCTION OF DEMOLOC-SAN JUAN-MALUNGON BYPASS ROAD, STA. MARIA- MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | On-Going | ₱96.5M | 100% | High risk62 | —-0.034 |
| 23LE0045CONSTRUCTION OF PONGPONG-BUCA-PINALPALAN ROAD, MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.076 |
| 24LE0021CONSTRUCTION OF CULAMAN SHORE PROTECTION, BRGY. CULAMAN, MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | On-Going | ₱106.1M | 100% | High risk62 | —-0.024 |
| 23LE0041CONSTRUCTION OF ROAD, SITIO MAGASAYAP BRGY. POBLACION, MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.075 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 22K00089CONST./IMPRVT. OF ACCESS ROADS LEADING TO AIRPORTS(KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM-KATUPARAN) JCT. KKK ROAD/LANGCATAON,PANGANTUCAN-JCT. DON CARLOS-KADINGILAN ROAD/SAN NICOLAS (LANGCATAON, PANGANTUCAN-KAWILIHAN-MAHAYAHAY-PUALAS, DON CA | Region X | Region X | Completed | ₱137.2M | 100% | Medium risk59 | —-0.071 |
| 27 | 22H00034CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, JCT (TNR) CORTES - BALILIHAN - CATIGBIAN | Region VII | Region VII | Completed | ₱106.2M | 100% | Medium risk59 | —-0.081 |
| 28 | 25LE0001ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - ASPHALT OVERLAY - ALONG DAVAO-SARANGANI COASTAL RD. (MALALAG-MALITA-JAS-G), K1628+269 - K1630+800, MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | On-Going | ₱90.4M | 100% | Medium risk58 | —-0.051 |
| 29 | 20H00005ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SECONDARY ROADS TAGBILARAN EAST RD (TAGBILARAN-JAGNA)-K0214+420- | Region VII | Region VII | Completed | ₱98.3M | 100% | Medium risk56 | —-0.077 |
| 30 | 20H00004ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SECONDARY ROADS TAGBILARAN EAST RD (TAGBILARAN-JAGNA)-K0214+100- | Region VII | Region VII | Completed | ₱98.3M | 100% | Medium risk56 | —-0.077 |
| 31 | 18H00065CONSTRUCTION OF THE DEPARTMENT OF AGRICULTURE REGION 7 (DA-7) BUILDING, GUADALUPE, CEBU CITY | Region VII | Region VII | Completed | ₱79.6M | 100% | Medium risk56 | —-0.012 |
| 32 | 25LE0002ASSET PRESERVATION-PREVENTIVE MAINTENANCE-SECONDARY ROADS - DAVAO-SARANGANI COASTAL RD. (MALALAG-MALITA-JAS-G), STA.MARIA-MALITA-DON MARCELINO, DAVAO OCCIDENTAL, K1612+651 - K1613+000, K1615+000 - K1616+000, K1634+434 - K1634+596, K1671+000 - K1671+130 | Region XI | Davao Occidental DEO | On-Going | ₱58.2M | 96% | Medium risk55 | —-0.054 |
| 33 | 19PL0107ASSET PRESERVATION -REHABILITATION / RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG MT. PROVINCE BDRY.- CALANAN - PINUKPUK - ABBUT RD (CAGALUAN-CALANAN SECTION)K0470+915-K0471+010, K0470+985-K0471+029, | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱53.2M | 100% | Medium risk53 | —-0.076 |
| 34 | 25LE0003ASSET PRESERVATION-PREVENTIVE MAINTENANCE-SECONDARY ROADS - ASPHALT OVERLAY- ALONG DAVAO-SARANGANI COASTAL RD. (MALALAG-MALITA-JAS-G), K1600+936 - K1601+695, STA. MARIA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | On-Going | ₱48.2M | 97% | Medium risk52 | —-0.059 |
| 35 | 23LE0062CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. LAIS, MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱49.5M | 100% | Medium risk52 | —-0.079 |
| 36 | 24LE0043CONSTRUCTION OF BUILDING OF PLANNING AND DESIGN SECTION (PDS) OF DPWH DAVAO OCCIDENTAL DISTRICT ENGINEERING OFFICE, BRGY. BUHANGIN, MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | On-Going | ₱49M | 100% | Medium risk52 | —-0.049 |
| 37 | 25LE0004ASSET PRESERVATION-PREVENTIVE MAINTENANCE-SECONDARY ROADS - DAVAO-SARANGANI COASTAL RD. (MALALAG-MALITA-JAS-G), K1613+000 - K1614+455, STA. MARIA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | On-Going | ₱48.2M | 100% | Medium risk52 | —-0.060 |
| 38 | 25LE0005ASSET PRESERVATION-PREVENTIVE MAINTENANCE-SECONDARY ROADS - ASPHALT OVERLAY- ALONG DAVAO-SARANGANI COASTAL RD. (MALALAG-MALITA-JAS-G), K1626+000 - K1626+733, MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | On-Going | ₱48.2M | 98% | Medium risk52 | —-0.058 |
| 39 | 20PM0001CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, POBLACION,PARACELIS-BANTAY-BURINGAL ROAD IN SUPPORT OF ABACA, BANANA, CACAO,CORN AND TOURISM INDUSTRIES, PARACELIS, MOUNTAIN | Cordillera Administrative Region | Mountain Province 2nd DEO | Completed | ₱50.1M | 100% | Medium risk51 | —-0.058 |
| 40 | 23KB0040CONSTRUCTION OF ROAD IN BRGY. KASIGKOT-BRGY. EMBAYAO-BRGY. SAN ROQUE-BRGY. PUALAS ROAD, DON CARLOS, BUKIDNON (PACKAGE VI), SAN ROQUE, DON CARLOS, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱46.8M | 100% | Medium risk49 | —-0.088 |
| 41 | 23E00209PAVING OF UNPAVED ROADS- SECONDARY ROADS QUEZON PUNTA BAJA ROAD, K0168+233-K0168+285; K0169+058-K0169+131; K0169+175-K0169+211; K0171+252-K0171+490; K0174+361-K0174+684; K0175+125.31-K0175+177; K0181+950-K0181+1014; K0192+542-K0193+033; K0197+565-K0197+95 | Region IV-B | Region IV-B | On-Going | ₱77.9M | 91% | Medium risk48 | —-0.022 |
| 42 | 23KB0049CONSTRUCTION OF BRGY ANAHAWON-BRGY SAN ROQUE-BRGY NEW TUBIGON-BRGY PANALSALAN ROAD, MARAMAG, BUKIDNON (PACKAGE V), MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱43.1M | 91% | Medium risk46 | —-0.040 |
| 43 | 18KF0054CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG MAJOR RIVER BASINS AND PRINCIPAL RIVERS, MANDULOG RIVER, LAMBAGUHON SECTION (ALONG EMERALD HOMES), INCLUDING ROW, BRGY. SAN ROQUE, ILIGAN CITY | Region X | Lanao del Norte 1st DEO | Completed | ₱43.7M | 100% | Medium risk45 | —-0.082 |
| 44 | 25KL0035CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MOOG, LAGUINDINGAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | On-Going | ₱4.9M | 98% | Medium risk44 | —-0.064 |
| 45 | 18DO0111CONSTRUCTION OF TWO (2) STOREY FOUR (4) CLASSROOM SCHOOL BUILDING AT MALASYA UYUNGAN ELEMENTARY SCHOOL, RODRIGUEZ (MONTALBAN), RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱16.3M | 100% | Medium risk44 | —-0.057 |
| 46 | 25MG0003PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-MIDSAYAP-MARBEL RD-K1775+000-K1775+570, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱38M | 100% | Low risk28 | —-0.086 |
| 47 | 25MG0001PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-MIDSAYAP-MARBEL RD-K1770+(-904)-K1770+(-243), SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱44M | 100% | Low risk27 | —-0.086 |
| 48 | 17KD0064CONST OF 4 STOREY 20 CL SCHOOL BUILDING FOR SOUTH CITY CS | Region X | Cagayan de Oro City 2nd DEO | Completed | ₱50M | 100% | Low risk27 | —-0.010 |
| 49 | 25MG0005PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-MIDSAYAP-MARBEL RD-K1779+485-K1779+738, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱16.8M | 100% | Low risk27 | —-0.087 |
| 50 | 20M00111CONSTRUCTION OF REVETMENT ALONG BUAL RIVER, BRGY. MINAPAN,TULUNAN, NORTH COTABATO | Region XII | Region XII | Completed | ₱35.1M | 100% | Low risk27 | —-0.073 |