Opening the dossier…
Opening the dossier…
Contractor dossier
47 projects on file, including joint ventures this contractor is part of.
Total projects
47
Total budget
₱1.1B
Average progress
90.1%
Completion rate
66.0%
Below 70%
Average risk score
49.1
Medium risk on average, out of 100
Flagged as unusual
3
6.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 47 | ₱1.1B | 49.1 | 3 | 90.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 27 | ₱658M | 43.3 | 0 | 91.6% |
| Buildings and Facilities | 6 | ₱79.9M | 49.0 | 0 | 100.0% |
| Bridges | 4 | ₱165.6M | 51.3 | 1 | 75.0% |
| Water Provision and Storage | 4 | ₱38.9M | 47.2 | 0 | 100.0% |
| OTHER | 2 | ₱29.8M | 78.5 | 2 | 100.0% |
| Flood Control and Drainage | 2 | ₱55M | 57.2 | 0 | 44.8% |
| GAA 2025 OO-1 | 1 | ₱22.8M | 92.4 | 0 | 92.8% |
| GAA 2025 OO-2 | 1 | ₱38.1M | 88.0 | 0 | 80.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DG0004REHAB/RECONST OF RDS W/ SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TAG.-TAAL LAKE RD.-K0063+205 - K0063+ | Region IV-A | Cavite 2nd DEO | On-Going | ₱22.8M | 93% | High risk92 | —-0.015 |
| 25DG0025CONST. OF FLOOD CONTROL STRUCTURE (REVETMENT) ALONG MARAGONDON RIVER, PHASE I, TERNATE, CAVITE | Region IV-A | Cavite 2nd DEO | On-Going | ₱38.1M | 80% | High risk88 | —-0.027 |
| 24DG0111CONC OF SITIO AB-AB,BRGY RAMIREZ FMR PHASE II, BRGY RAMIREZ, MAGALLANES, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱14.9M | 100% | High risk79 | Flagged0.005 |
| 24DG0110CONC OF SITIO AB-AB, BRGY RAMIREZ, FMR, BRGY RAMIREZ, MAGALLANES, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱14.9M | 100% | High risk79 | Flagged0.005 |
| 25DG0021REHAB./RECONST. OF RDS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE -TERNATE-NASUGBU RD - K0068+762-K00 | Region IV-A | Cavite 2nd DEO | On-Going | ₱93.6M | 61% | High risk73 | —-0.026 |
| 25DG0016CONST. OF FLOOD CONTROL STRUCTURE (REVETMENT) ALONG MABACAO BR., PHASE I, MARAGONDON, CAVITE | Region IV-A | Cavite 2nd DEO | On-Going | ₱28.6M | 0% | High risk68 | —-0.000 |
| 25D00121CONSTRUCTION OF MISSING LINKS/ NEW ROADS GENERAL AGUINALDO-MAGALLANES-NASUGBU ROAD (EAST-WEST ROAD), MAGALLANES-GEN. AGUINALDO SECTION, PACKAGE 6, CAVITE | Region IV-A | Region IV-A | On-Going | ₱112.9M | 0% | High risk64 | Flagged0.001 |
| 24D00017FY 2024 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF MISSING LINKS/ NEW ROADSTAGAYTAY-CALAMBA ROAD VIA CANLUBANG, CAVITE | Region IV-A | Region IV-A | On-Going | ₱94.1M | 100% | High risk61 | —-0.067 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DG0111CONC OF SITIO AB-AB,BRGY RAMIREZ FMR PHASE II, BRGY RAMIREZ, MAGALLANES, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱14.9M | 100% | High risk79 | Flagged0.005 |
| 24DG0110CONC OF SITIO AB-AB, BRGY RAMIREZ, FMR, BRGY RAMIREZ, MAGALLANES, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱14.9M | 100% | High risk79 | Flagged0.005 |
| 25D00121CONSTRUCTION OF MISSING LINKS/ NEW ROADS GENERAL AGUINALDO-MAGALLANES-NASUGBU ROAD (EAST-WEST ROAD), MAGALLANES-GEN. AGUINALDO SECTION, PACKAGE 6, CAVITE | Region IV-A | Region IV-A | On-Going | ₱112.9M | 0% | High risk64 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25DG0004REHAB/RECONST OF RDS W/ SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TAG.-TAAL LAKE RD.-K0063+205 - K0063+ | Region IV-A | Cavite 2nd DEO | On-Going | ₱22.8M | 93% | High risk92 | —-0.015 |
| 2 | 25DG0025CONST. OF FLOOD CONTROL STRUCTURE (REVETMENT) ALONG MARAGONDON RIVER, PHASE I, TERNATE, CAVITE | Region IV-A | Cavite 2nd DEO | On-Going | ₱38.1M | 80% | High risk88 | —-0.027 |
| 3 | 24DG0111CONC OF SITIO AB-AB,BRGY RAMIREZ FMR PHASE II, BRGY RAMIREZ, MAGALLANES, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱14.9M | 100% | High risk79 | Flagged0.005 |
| 4 | 24DG0110CONC OF SITIO AB-AB, BRGY RAMIREZ, FMR, BRGY RAMIREZ, MAGALLANES, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱14.9M | 100% | High risk79 | Flagged0.005 |
| 5 | 25DG0021REHAB./RECONST. OF RDS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE -TERNATE-NASUGBU RD - K0068+762-K00 | Region IV-A | Cavite 2nd DEO | On-Going | ₱93.6M | 61% | High risk73 | —-0.026 |
| 6 | 25DG0016CONST. OF FLOOD CONTROL STRUCTURE (REVETMENT) ALONG MABACAO BR., PHASE I, MARAGONDON, CAVITE | Region IV-A | Cavite 2nd DEO | On-Going | ₱28.6M | 0% | High risk68 | —-0.000 |
| 7 | 25D00121CONSTRUCTION OF MISSING LINKS/ NEW ROADS GENERAL AGUINALDO-MAGALLANES-NASUGBU ROAD (EAST-WEST ROAD), MAGALLANES-GEN. AGUINALDO SECTION, PACKAGE 6, CAVITE | Region IV-A | Region IV-A | On-Going | ₱112.9M | 0% | High risk64 | Flagged0.001 |
| 8 | 24D00017FY 2024 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF MISSING LINKS/ NEW ROADSTAGAYTAY-CALAMBA ROAD VIA CANLUBANG, CAVITE | Region IV-A | Region IV-A | On-Going | ₱94.1M | 100% | High risk61 | —-0.067 |
| 9 | 22D00023CONSTRUCTION OF MISSING LINKS / NEW ROADS GENERAL AGUINALDO - MAGALLANES - NASUGBU ROAD (EAST - WEST ROAD), MAGALLANES - GEN. AGUINALDO SECTION, PACKAGE 1, CAVITE | Region IV-A | Region IV-A | Completed | ₱114.4M | 100% | Medium risk60 | —-0.088 |
| 10 | 23DG0015CONST OF ROAD SLOPE PROTECTION STRUCTURE-TERNATE-NASUGBU RD K0071+289-K0071+455 | Region IV-A | Cavite 2nd DEO | Completed | ₱57.9M | 100% | Medium risk53 | —-0.101 |
| 11 | 23DG0052CONST OF MPB (KICKBOXING TRAINING AND BILLETING) BRGY KAYBAGAL SOUTH, TAGAYTAY CITY | Region IV-A | Cavite 2nd DEO | Completed | ₱21.8M | 100% | Medium risk51 | —-0.100 |
| 12 | 23DG0050CONST OF MPB-CONST OF MPB (SCHOOL BLDG), BRGY MALAINEN BAGO, NAIC, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱19.8M | 100% | Medium risk50 | —-0.102 |
| 13 | 25DG0039COST. OF MULTI-PURPOSE BLDG. (BRGY. HALL), BRGY. KABULUSAN, MAGALLANES, CAVITE | Region IV-A | Cavite 2nd DEO | On-Going | ₱7.8M | 100% | Medium risk49 | —-0.070 |
| 14 | 23DG0037CONST OF MPB-BRGY HALL, BRGY. TABORA, GEN EMILIO AGUINALDO, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱6.9M | 100% | Medium risk49 | —-0.098 |
| 15 | 23DG0041CONST OF MPB, BRGY HALL, BRGY KAYPAABA, GEN E AGUINALDO, CAV | Region IV-A | Cavite 2nd DEO | Completed | ₱6.9M | 100% | Medium risk49 | —-0.103 |
| 16 | 23DG0011WIDENING OF BRIDGE-RED BRIDGE (B04768LZ)ALONG MARAGONDON-MAGALLANES-AMUYONG ROAD | Region IV-A | Cavite 2nd DEO | Completed | ₱29.4M | 100% | Medium risk48 | —-0.068 |
| 17 | 23D00009CONSTRUCTION OF MISSING LINKS / NEW ROADSTAGAYTAY-CALAMBA ROAD VIA CANLUBANG, CAVITE SECTION, PACKAGE B, CAVITE | Region IV-A | Region IV-A | On-Going | ₱28.7M | 29% | Medium risk47 | —-0.035 |
| 18 | 24DG0109CONC. OF SITIO TIKWI, BRGY. SAN AGUSTIN FMR, BRGY. SAN AGUSTIN, MAGALLANES, CAVITE | Region IV-A | Cavite 2nd DEO | On-Going | ₱14.9M | 97% | Medium risk47 | —-0.011 |
| 19 | 23DG0055CONST OF WATER SUPPLY SYSTEM-CONST OF SOLAR WATER SYSTEM, BRGY TALIPUSNGO, MARAGONDON, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱9.7M | 100% | Medium risk47 | —-0.073 |
| 20 | 23DG0057CONST OF WATER SUPPLY SYSTEMS-CONST OF SOLAR WATER SYSTEM, BRGY BANCAAN, NAIC, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱9.7M | 100% | Medium risk47 | —-0.072 |
| 21 | 23DG0058CONST OF WATER SUPPLY SYSTEMS-CONST OF SOLAR WATER SYSTEM,BRGY GALICIA 3, MENDEZ, CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱9.8M | 100% | Medium risk47 | —-0.073 |
| 22 | 23DG0056CONST OF WATER SUPPLY SYSTEMS-CONST OF SOLAR WATER SYSTEM,BRGY. SAPANG 1, TERNATE,CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱9.8M | 100% | Medium risk47 | —-0.071 |
| 23 | 25DG0009RD. WIDENING-MARAGONDON-MAGALLANES-AMUYONG RD - K0082+220 - K0082+720 | Region IV-A | Cavite 2nd DEO | On-Going | ₱28.6M | 37% | Medium risk47 | —-0.057 |
| 24 | 24DG0071RETROFITTING/STRENGHTENING OF BRIDGE-CONVENTO BR (B04543LZ) ALONG JUANITO REMULLA SR. ROAD | Region IV-A | Cavite 2nd DEO | Completed | ₱16.6M | 100% | Medium risk47 | —-0.064 |
| 25 | 25DG0013RETROFITTING/STRENGTENING OF PERMANENT BRIDGES-KINAUNURAN BR. (B03148LZ) ALONG MARAGONDON-MAGALLANES | Region IV-A | Cavite 2nd DEO | Completed | ₱6.6M | 100% | Medium risk47 | —-0.065 |