Opening the dossier…
Opening the dossier…
Contractor dossier
223 projects on file, including joint ventures this contractor is part of.
Total projects
223
Total budget
₱9.9B
Average progress
94.7%
Completion rate
86.1%
Average risk score
51.7
Medium risk on average, out of 100
Flagged as unusual
6
2.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Negros Island Region | 147 | ₱4.9B | 50.9 | 3 | 94.9% |
| Region VI | 68 | ₱4.3B | 53.6 | 3 | 93.7% |
| Region X | 8 | ₱645.6M | 49.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 116 | ₱5B | 49.3 | 0 | 96.3% |
| Flood Control and Drainage | 43 | ₱2B | 48.4 | 0 | 94.7% |
| Bridges | 29 | ₱1.5B | 50.7 | 2 | 91.2% |
| Buildings and Facilities | 15 | ₱276.3M | 45.9 | 1 | 95.3% |
| OTHER | 13 | ₱686.5M | 72.2 | 1 | 98.9% |
| GAA 2025 OO-1 | 4 | ₱163M | 92.3 | 0 | 93.8% |
| GAA 2025 SSP | 1 | ₱19.5M | 94.9 | 1 | 27.3% |
| GAA 2025 OO-2 | 1 | ₱70M | 92.5 | 1 | 17.1% |
| Bridges, Roads | 1 | ₱176.1M | 65.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GL0097IMPROVEMENT OF INTERSECTION AT BACOLOD SOUTH RD - K0052 + 335 | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱19.5M | 27% | High risk95 | Flagged0.028 |
| 25GN0002ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - BACOLOD SOUTH ROAD (OLD ROAD) - K0019+(-184) - K0020+200, K0020+768 - K0020+948 | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱67.5M | 98% | High risk94 | —-0.009 |
| 25RE0020PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG JCT CURVA HAGNAYA-POBLACION-MAASWA RD (S00018NR) K0111 + (-530) - K0112 + 929, K0115 + 460 - K0115 + 921, K0116 + 550 - K0116 + 792, K0116 + 798 - K0117 + 105 | Negros Island Region | Negros Occidental 5th DEO | On-Going | ₱58M | 98% | High risk93 | —-0.009 |
| 25GN0049CONSTRUCTION OF VALLADOLID SEAWALL ALONG BACOLOD SOUTH ROAD (S00127NR), VALLADOLID, NEGROS OCCIDENTAL | Negros Island Region | Negros Island Region | On-Going | ₱70M | 17% | High risk93 | Flagged0.002 |
| 25GQ0044RECONSTRUCTION TO CONCRETE PAVEMENT ALONG PROSPERIDAD-QUEZON-CABARON RD (S00402NR) - K0075+542 - K0076+224 | Negros Island Region | Negros Occidental 5th DEO | On-Going | ₱15M | 100% | High risk91 | —-0.012 |
| 25GQ0004RECONSTRUCTION TO CONCRETE PAVEMENT ALONG BACOLOD-MURCIA-DS BENEDICTO-SN CARLOS CITY RD (S00427NR) - K0076+000 - K0077+000 | Negros Island Region | Negros Occidental 5th DEO | On-Going | ₱22.6M | 80% | High risk91 | —-0.004 |
| 24GN0035CONSTRUCTION OF RIVER BANK PROTECTION ALONG SUM-AG RIVER, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱96.5M | 86% | High risk81 | Flagged0.007 |
| 20GL0058REPLACEMENT OF PERMANENT WEAK BRIDGE TANOLO BR. 3 (B00354NR) ALONG BACOLOD SOUTH RD, BINALBAGAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.022 |
| 17GD0029IMP/WIDENING OF NATL RD-SEC RD, ILO EAST COAST-CPZ RD K0152+111-K0152+897,K0153+000-K0154+173,ETC.. | Region VI | Capiz 1st DEO | Completed | ₱90.8M | 100% | High risk77 | —-0.012 |
| 22GN0078ROAD WIDENING-DON JORGE ARANETA-AYUNGON-YUNGUE-GURREA-LA CARLOTA CITY ROAD (S00208NR) CHAINAGE 155 - CHAINAGE 2253, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱67.3M | 100% | High risk76 | —-0.033 |
| 22GN0079ROAD WIDENING - TERTIARY ROADS, JCT. MURCIA - CANSILAYAN - DAMSITE - ABUANAN - BAGO CITY ROAD, K0025+(-013) - K0027+200, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱71.5M | 100% | High risk76 | —-0.031 |
| 23GN0044OFFCARRIAGEWAY IMPROVEMENT - TERTIARY ROADS, BAGO-MAMBUCAL ROAD, K0055+000.00 - K0060+588.00, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱57.3M | 100% | High risk76 | —-0.030 |
| 19GN0055PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ALONG JCT. MURCIA - CANSILAYAN - DAMSITE - ABUANAN - BAGO CITY ROAD (S00168NR), K0031+302 TO K0032+800, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱12.7M | 100% | High risk73 | —-0.036 |
| 19GN0001PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ALONG JCT. BAGONAWA - LA CASTELLANA - ISABELA ROAD (S00175NR), K0053+967 TO K0056+188LA CARLOTA CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱19.6M | 100% | High risk73 | —-0.034 |
| 20GL0023REPLACEMENT OF PERMANENT WEAK BRIDGE TANOLO BR. 2 (B00353NR) ALONG BACOLOD SOUTH RD, HINIGARAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱9.8M | 100% | High risk73 | —-0.035 |
| 19GN0004REHABILITATION OF ASPHALT ROAD: ASPHALT RECONSTRUCTION INCLUDING DRAINAGE ALONG BACOLOD SOUTH ROAD (GEN. LUNA - BAGO HIGH SCHOOL ROAD) (S00158NR), K0022+ (-488) TO K0022+(-169), BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱19.1M | 100% | High risk73 | —-0.034 |
| 20GL0022REPLACEMENT OF PERMANENT WEAK BRIDGE TANOLO BR. 1 (B00352NR) ALONG BACOLOD SOUTH RD, HINIGARAN, NEGROS | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱11.8M | 100% | High risk72 | —-0.035 |
| 16R00087IMPROVEMENT/WIDENING OF NATIONAL ROADS ALONG BACOLOD SOUTH RD INCLUDING RROW (S00127NR), K0028+747 - K0034+000, SAN ENRIQUE, VALLADOLID, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱140.8M | 100% | High risk71 | —-0.036 |
| 17R00016IMPROVEMENT/ WIDENING OF BACOLOD SOUTH ROAD (KABANKALAN - HINOBAAN SECTION) INCLUDING DRAINAGE AND SLOPE PROTECTION (S00224NR), K0095+978 - K0096+772; K0096+772 - K0097+112; K0097+112 - K0098+033.43; K0108+000 - K0108+562; K0108+581 - K0108+992.70; K0109+ | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱138M | 100% | High risk71 | —-0.028 |
| 16R00086IMPROVEMENT/WIDENING OF NATIONAL ROADS ALONG BACOLOD SOUTH RD INCLUDING RROW (S00127NR), K0024+450 - K0024+894; K0024+912 - K0027+1003, PULUPANDAN, VALLADOLID, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱103.7M | 100% | High risk71 | —-0.043 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24G00079CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU- DON SALVADOR BENEDICTO SUPER HEALTH CENTER, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱11.9M | 30% | High risk61 | Flagged0.037 |
| 23G00036REPLACEMENT OF BRIDGE- TALAVE BR. (B00182NR) ALONG BACOLOD NORTH RD. | Region VI | Region VI | On-Going | ₱95.5M | 16% | High risk63 | Flagged0.031 |
| 25GL0097IMPROVEMENT OF INTERSECTION AT BACOLOD SOUTH RD - K0052 + 335 | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱19.5M | 27% | High risk95 | Flagged0.028 |
| 20G00094IMPROVEMENT OF BRIDGE, CABIA-AN RIVER, BRGY, CABIA-AN | Region VI | Region VI | Completed | ₱72.1M | 100% | Medium risk54 | Flagged0.019 |
| 24GN0035CONSTRUCTION OF RIVER BANK PROTECTION ALONG SUM-AG RIVER, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱96.5M | 86% | High risk81 | Flagged0.007 |
| 25GN0049CONSTRUCTION OF VALLADOLID SEAWALL ALONG BACOLOD SOUTH ROAD (S00127NR), VALLADOLID, NEGROS OCCIDENTAL | Negros Island Region | Negros Island Region | On-Going | ₱70M | 17% | High risk93 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25GL0097IMPROVEMENT OF INTERSECTION AT BACOLOD SOUTH RD - K0052 + 335 | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱19.5M | 27% | High risk95 | Flagged0.028 |
| 2 | 25GN0002ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - BACOLOD SOUTH ROAD (OLD ROAD) - K0019+(-184) - K0020+200, K0020+768 - K0020+948 | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱67.5M | 98% | High risk94 | —-0.009 |
| 3 | 25RE0020PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG JCT CURVA HAGNAYA-POBLACION-MAASWA RD (S00018NR) K0111 + (-530) - K0112 + 929, K0115 + 460 - K0115 + 921, K0116 + 550 - K0116 + 792, K0116 + 798 - K0117 + 105 | Negros Island Region | Negros Occidental 5th DEO | On-Going | ₱58M | 98% | High risk93 | —-0.009 |
| 4 | 25GN0049CONSTRUCTION OF VALLADOLID SEAWALL ALONG BACOLOD SOUTH ROAD (S00127NR), VALLADOLID, NEGROS OCCIDENTAL | Negros Island Region | Negros Island Region | On-Going | ₱70M | 17% | High risk93 | Flagged0.002 |
| 5 | 25GQ0044RECONSTRUCTION TO CONCRETE PAVEMENT ALONG PROSPERIDAD-QUEZON-CABARON RD (S00402NR) - K0075+542 - K0076+224 | Negros Island Region | Negros Occidental 5th DEO | On-Going | ₱15M | 100% | High risk91 | —-0.012 |
| 6 | 25GQ0004RECONSTRUCTION TO CONCRETE PAVEMENT ALONG BACOLOD-MURCIA-DS BENEDICTO-SN CARLOS CITY RD (S00427NR) - K0076+000 - K0077+000 | Negros Island Region | Negros Occidental 5th DEO | On-Going | ₱22.6M | 80% | High risk91 | —-0.004 |
| 7 | 24GN0035CONSTRUCTION OF RIVER BANK PROTECTION ALONG SUM-AG RIVER, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱96.5M | 86% | High risk81 | Flagged0.007 |
| 8 | 20GL0058REPLACEMENT OF PERMANENT WEAK BRIDGE TANOLO BR. 3 (B00354NR) ALONG BACOLOD SOUTH RD, BINALBAGAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.022 |
| 9 | 17GD0029IMP/WIDENING OF NATL RD-SEC RD, ILO EAST COAST-CPZ RD K0152+111-K0152+897,K0153+000-K0154+173,ETC.. | Region VI | Capiz 1st DEO | Completed | ₱90.8M | 100% | High risk77 | —-0.012 |
| 10 | 22GN0078ROAD WIDENING-DON JORGE ARANETA-AYUNGON-YUNGUE-GURREA-LA CARLOTA CITY ROAD (S00208NR) CHAINAGE 155 - CHAINAGE 2253, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱67.3M | 100% | High risk76 | —-0.033 |
| 11 | 22GN0079ROAD WIDENING - TERTIARY ROADS, JCT. MURCIA - CANSILAYAN - DAMSITE - ABUANAN - BAGO CITY ROAD, K0025+(-013) - K0027+200, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱71.5M | 100% | High risk76 | —-0.031 |
| 12 | 23GN0044OFFCARRIAGEWAY IMPROVEMENT - TERTIARY ROADS, BAGO-MAMBUCAL ROAD, K0055+000.00 - K0060+588.00, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱57.3M | 100% | High risk76 | —-0.030 |
| 13 | 19GN0055PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ALONG JCT. MURCIA - CANSILAYAN - DAMSITE - ABUANAN - BAGO CITY ROAD (S00168NR), K0031+302 TO K0032+800, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱12.7M | 100% | High risk73 | —-0.036 |
| 14 | 19GN0001PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ALONG JCT. BAGONAWA - LA CASTELLANA - ISABELA ROAD (S00175NR), K0053+967 TO K0056+188LA CARLOTA CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱19.6M | 100% | High risk73 | —-0.034 |
| 15 | 20GL0023REPLACEMENT OF PERMANENT WEAK BRIDGE TANOLO BR. 2 (B00353NR) ALONG BACOLOD SOUTH RD, HINIGARAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱9.8M | 100% | High risk73 | —-0.035 |
| 16 | 19GN0004REHABILITATION OF ASPHALT ROAD: ASPHALT RECONSTRUCTION INCLUDING DRAINAGE ALONG BACOLOD SOUTH ROAD (GEN. LUNA - BAGO HIGH SCHOOL ROAD) (S00158NR), K0022+ (-488) TO K0022+(-169), BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱19.1M | 100% | High risk73 | —-0.034 |
| 17 | 20GL0022REPLACEMENT OF PERMANENT WEAK BRIDGE TANOLO BR. 1 (B00352NR) ALONG BACOLOD SOUTH RD, HINIGARAN, NEGROS | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱11.8M | 100% | High risk72 | —-0.035 |
| 18 | 16R00087IMPROVEMENT/WIDENING OF NATIONAL ROADS ALONG BACOLOD SOUTH RD INCLUDING RROW (S00127NR), K0028+747 - K0034+000, SAN ENRIQUE, VALLADOLID, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱140.8M | 100% | High risk71 | —-0.036 |
| 19 | 17R00016IMPROVEMENT/ WIDENING OF BACOLOD SOUTH ROAD (KABANKALAN - HINOBAAN SECTION) INCLUDING DRAINAGE AND SLOPE PROTECTION (S00224NR), K0095+978 - K0096+772; K0096+772 - K0097+112; K0097+112 - K0098+033.43; K0108+000 - K0108+562; K0108+581 - K0108+992.70; K0109+ | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱138M | 100% | High risk71 | —-0.028 |
| 20 | 16R00086IMPROVEMENT/WIDENING OF NATIONAL ROADS ALONG BACOLOD SOUTH RD INCLUDING RROW (S00127NR), K0024+450 - K0024+894; K0024+912 - K0027+1003, PULUPANDAN, VALLADOLID, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱103.7M | 100% | High risk71 | —-0.043 |
| 21 | 17R00012RECONSTRUCTION OF DAMAGED PAVED INCLUDING DRAINAGE ALONG BACOLOD SOUTH ROAD (KABANKALAN-HINOBAAN) K0127+770 - K0128+963; K0132+000 - K0132+327; K0132+327 - K0133+055; K0168+000-K0168+160; K0173+(-034) - K0173+480; K0173+740 - K0174+100; K0180+000 - K0180 | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱107.6M | 100% | High risk70 | —-0.050 |
| 22 | 17G00038ROAD WIDENING-ILOILO-ANTIQUE RD INCLUDING RROW, K00221+000 - K0223+029 | Region VI | Region VI | Completed | ₱64.7M | 100% | High risk69 | —-0.047 |
| 23 | 17G00039ROAD WIDENING - ILOILO - ANTIQUE RD INCLUDING RROW, K0223+029 - K0225+000 | Region VI | Region VI | Completed | ₱64.4M | 100% | High risk69 | —-0.047 |
| 24 | 16R00091CONSTRUCTION OF REGIONAL EVACUATION CENTER AT BRGY. LAG-ASAN, BAGO CITY, NEGROS OCCIDENTAL, NEGROS OCCIDENTAL 4TH LD | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱32M | 100% | High risk68 | —-0.047 |
| 25 | 18GN0039REHABILITATION OF MULTI-PURPOSE BUILDING GYMNASIUM, BRGY. 1, LA CARLOTA CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱9.6M | 100% | High risk67 | —-0.061 |