Contractor dossier
223 projects on file, including joint ventures this contractor is part of.
Total projects
223
Total budget
₱9.9B
Average progress
94.7%
Completion rate
86.1%
Average risk score
51.7
Medium risk on average, out of 100
Flagged as unusual
6
2.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Negros Island Region | 147 | ₱4.9B | 50.9 | 3 | 94.9% |
| Region VI | 68 | ₱4.3B | 53.6 | 3 | 93.7% |
| Region X | 8 | ₱645.6M | 49.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 116 | ₱5B | 49.3 | 0 | 96.3% |
| Flood Control and Drainage | 43 | ₱2B | 48.4 | 0 | 94.7% |
| Bridges | 29 | ₱1.5B | 50.7 | 2 | 91.2% |
| Buildings and Facilities | 15 | ₱276.3M | 45.9 | 1 | 95.3% |
| OTHER | 13 | ₱686.5M | 72.2 | 1 | 98.9% |
| GAA 2025 OO-1 | 4 | ₱163M | 92.3 | 0 | 93.8% |
| GAA 2025 SSP | 1 | ₱19.5M | 94.9 | 1 | 27.3% |
| GAA 2025 OO-2 | 1 | ₱70M | 92.5 | 1 | 17.1% |
| Bridges, Roads | 1 | ₱176.1M | 65.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GL0097IMPROVEMENT OF INTERSECTION AT BACOLOD SOUTH RD - K0052 + 335 | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱19.5M | 27% | High risk95 | Flagged0.028 |
| 25GN0002ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - BACOLOD SOUTH ROAD (OLD ROAD) - K0019+(-184) - K0020+200, K0020+768 - K0020+948 | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱67.5M | 98% | High risk94 | —-0.009 |
| 25RE0020PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG JCT CURVA HAGNAYA-POBLACION-MAASWA RD (S00018NR) K0111 + (-530) - K0112 + 929, K0115 + 460 - K0115 + 921, K0116 + 550 - K0116 + 792, K0116 + 798 - K0117 + 105 | Negros Island Region | Negros Occidental 5th DEO | On-Going | ₱58M | 98% | High risk93 | —-0.009 |
| 25GN0049CONSTRUCTION OF VALLADOLID SEAWALL ALONG BACOLOD SOUTH ROAD (S00127NR), VALLADOLID, NEGROS OCCIDENTAL | Negros Island Region | Negros Island Region | On-Going | ₱70M | 17% | High risk93 | Flagged0.002 |
| 25GQ0044RECONSTRUCTION TO CONCRETE PAVEMENT ALONG PROSPERIDAD-QUEZON-CABARON RD (S00402NR) - K0075+542 - K0076+224 | Negros Island Region | Negros Occidental 5th DEO | On-Going | ₱15M | 100% | High risk91 | —-0.012 |
| 25GQ0004RECONSTRUCTION TO CONCRETE PAVEMENT ALONG BACOLOD-MURCIA-DS BENEDICTO-SN CARLOS CITY RD (S00427NR) - K0076+000 - K0077+000 | Negros Island Region | Negros Occidental 5th DEO | On-Going | ₱22.6M | 80% | High risk91 | —-0.004 |
| 24GN0035CONSTRUCTION OF RIVER BANK PROTECTION ALONG SUM-AG RIVER, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱96.5M | 86% | High risk81 | Flagged0.007 |
| 20GL0058REPLACEMENT OF PERMANENT WEAK BRIDGE TANOLO BR. 3 (B00354NR) ALONG BACOLOD SOUTH RD, BINALBAGAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.022 |
| 17GD0029IMP/WIDENING OF NATL RD-SEC RD, ILO EAST COAST-CPZ RD K0152+111-K0152+897,K0153+000-K0154+173,ETC.. | Region VI | Capiz 1st DEO | Completed | ₱90.8M | 100% | High risk77 | —-0.012 |
| 22GN0078ROAD WIDENING-DON JORGE ARANETA-AYUNGON-YUNGUE-GURREA-LA CARLOTA CITY ROAD (S00208NR) CHAINAGE 155 - CHAINAGE 2253, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱67.3M | 100% | High risk76 | —-0.033 |
| 22GN0079ROAD WIDENING - TERTIARY ROADS, JCT. MURCIA - CANSILAYAN - DAMSITE - ABUANAN - BAGO CITY ROAD, K0025+(-013) - K0027+200, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱71.5M | 100% | High risk76 | —-0.031 |
| 23GN0044OFFCARRIAGEWAY IMPROVEMENT - TERTIARY ROADS, BAGO-MAMBUCAL ROAD, K0055+000.00 - K0060+588.00, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱57.3M | 100% | High risk76 | —-0.030 |
| 19GN0055PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ALONG JCT. MURCIA - CANSILAYAN - DAMSITE - ABUANAN - BAGO CITY ROAD (S00168NR), K0031+302 TO K0032+800, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱12.7M | 100% | High risk73 | —-0.036 |
| 19GN0001PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ALONG JCT. BAGONAWA - LA CASTELLANA - ISABELA ROAD (S00175NR), K0053+967 TO K0056+188LA CARLOTA CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱19.6M | 100% | High risk73 | —-0.034 |
| 20GL0023REPLACEMENT OF PERMANENT WEAK BRIDGE TANOLO BR. 2 (B00353NR) ALONG BACOLOD SOUTH RD, HINIGARAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱9.8M | 100% | High risk73 | —-0.035 |
| 19GN0004REHABILITATION OF ASPHALT ROAD: ASPHALT RECONSTRUCTION INCLUDING DRAINAGE ALONG BACOLOD SOUTH ROAD (GEN. LUNA - BAGO HIGH SCHOOL ROAD) (S00158NR), K0022+ (-488) TO K0022+(-169), BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱19.1M | 100% | High risk73 | —-0.034 |
| 20GL0022REPLACEMENT OF PERMANENT WEAK BRIDGE TANOLO BR. 1 (B00352NR) ALONG BACOLOD SOUTH RD, HINIGARAN, NEGROS | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱11.8M | 100% | High risk72 | —-0.035 |
| 16R00087IMPROVEMENT/WIDENING OF NATIONAL ROADS ALONG BACOLOD SOUTH RD INCLUDING RROW (S00127NR), K0028+747 - K0034+000, SAN ENRIQUE, VALLADOLID, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱140.8M | 100% | High risk71 | —-0.036 |
| 17R00016IMPROVEMENT/ WIDENING OF BACOLOD SOUTH ROAD (KABANKALAN - HINOBAAN SECTION) INCLUDING DRAINAGE AND SLOPE PROTECTION (S00224NR), K0095+978 - K0096+772; K0096+772 - K0097+112; K0097+112 - K0098+033.43; K0108+000 - K0108+562; K0108+581 - K0108+992.70; K0109+ | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱138M | 100% | High risk71 | —-0.028 |
| 16R00086IMPROVEMENT/WIDENING OF NATIONAL ROADS ALONG BACOLOD SOUTH RD INCLUDING RROW (S00127NR), K0024+450 - K0024+894; K0024+912 - K0027+1003, PULUPANDAN, VALLADOLID, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱103.7M | 100% | High risk71 | —-0.043 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24G00079CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU- DON SALVADOR BENEDICTO SUPER HEALTH CENTER, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱11.9M | 30% | High risk61 | Flagged0.037 |
| 23G00036REPLACEMENT OF BRIDGE- TALAVE BR. (B00182NR) ALONG BACOLOD NORTH RD. | Region VI | Region VI | On-Going | ₱95.5M | 16% | High risk63 | Flagged0.031 |
| 25GL0097IMPROVEMENT OF INTERSECTION AT BACOLOD SOUTH RD - K0052 + 335 | Negros Island Region | Negros Occidental 2nd DEO | On-Going | ₱19.5M | 27% | High risk95 | Flagged0.028 |
| 20G00094IMPROVEMENT OF BRIDGE, CABIA-AN RIVER, BRGY, CABIA-AN | Region VI | Region VI | Completed | ₱72.1M | 100% | Medium risk54 | Flagged0.019 |
| 24GN0035CONSTRUCTION OF RIVER BANK PROTECTION ALONG SUM-AG RIVER, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱96.5M | 86% | High risk81 | Flagged0.007 |
| 25GN0049CONSTRUCTION OF VALLADOLID SEAWALL ALONG BACOLOD SOUTH ROAD (S00127NR), VALLADOLID, NEGROS OCCIDENTAL | Negros Island Region | Negros Island Region | On-Going | ₱70M | 17% | High risk93 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 18G00063CONSTRUCTION OF REVETMENT WALL ALONG ILOG - BUNGOL RIVER AT BRGY. 1, ILOG, NEGROS OCCIDENTAL | Region VI | Region VI | Completed | ₱91.7M | 100% | Medium risk59 | —-0.056 |
| 52 | 21G00154BACOLOD SOUTH - CIRCUMFERENTIAL DIVERSION ROAD | Region VI | Region VI | Completed | ₱96.5M | 100% | Medium risk59 | —-0.070 |
| 53 | 21G00153BACOLOD CITY BOUNDARY BY-PASS ROAD | Region VI | Region VI | Completed | ₱96.5M | 100% | Medium risk59 | —-0.070 |
| 54 | 23GQ0043PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG BACOLOD-MURCIA-DS BENEDICTO-SN CARLOS CITY RD (S00427NR) K0053 + 000 - K0056 + 742 | Region VI | Region VI | Completed | ₱96.5M | 100% | Medium risk59 | —-0.072 |
| 55 | 20G00067ROAD WIDENING - AT SPECIFIC LOCATIONS ALONG JCT. SN ENRIQUE - PONTEVEDRA BY-PASS RD K0036+203 - K0039+000 | Region VI | Region VI | Completed | ₱104.7M | 100% | Medium risk58 | —-0.059 |
| 56 | 21G00048CANDONI - GATUSLAO - BASAY BDRY ROAD, NEGROS OCCIDENTAL | Region VI | Region VI | Completed | ₱101.3M | 100% | Medium risk58 | —-0.063 |
| 57 | 20G00005CONSTRUCTION OF CONCRETE ROAD - CANDONI-GATUSLAO-BASAY BDRY. ROAD, NEGROS OCCIDENTAL | Region VI | Region VI | Completed | ₱97.5M | 100% | Medium risk58 | —-0.069 |
| 58 | 19G00042CONSTRUCTION OF CONCRETE ROAD - CANDONI - GATUSLAO - BASAY BDRY. ROAD, NEGROS OCCIDENTAL | Region VI | Region VI | Completed | ₱97.5M | 100% | Medium risk58 | —-0.070 |
| 59 | 24GQ0014CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG BACOLOD- MURCIA- DS BENEDICTO- SN CARLOS CITY RD- K0074+350- K0074+550 | Region VI | Region VI | On-Going | ₱92.2M | 14% | Medium risk58 | —-0.013 |
| 60 | 24GO0022CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO ECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP) BACOLOD CITY BOUNDARY ROAD LEADING TO MT. MANDALAGAN, BACOLOD CITY | Negros Island Region | Bacolod City DEO | On-Going | ₱96.5M | 100% | Medium risk58 | —-0.053 |
| 61 | 17RE0033CONSTRUCTION AND MAINTENANCE OF BRIDGE ALONG NATIONAL ROAD-RETROFITTING STRENGTHENING OF TIBSOK BRIDGE (B00394NR) ALONG BACOLOD SOUTH ROAD, K0037+081 - K0037+237, SAN ENRIQUE, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱18.9M | 100% | Medium risk55 | —-0.035 |
| 62 | 17RE0054REHABILITATION MAJOR REPAIR OF PERMANENT BRIDGES - SIBUD BRIDGE 2 (B00194NR) ALONG BACOLOD SOUTH BY-PASS ROAD (S00155NR), BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱16.8M | 100% | Medium risk55 | —-0.036 |
| 63 | 20KK0133CONSTRUCTION OF FLOOD CONTROL STRUCTURE, DOWNSTREAM OF KIBALUYOT BRIDGE, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱77.9M | 100% | Medium risk55 | —-0.011 |
| 64 | 20G00074CONSTRUCTION OF BRGY. COMON-SAN PEDRO COASTAL ROAD LEADING TO SAN JOSE PORT AND BEACHES, RESORTS AND SUNSET VIEWING, SAN JOSE, ANTIQUE | Region VI | Region VI | Completed | ₱65M | 100% | Medium risk54 | —-0.043 |
| 65 | 20G00073ACCESS ROAD ALONG BRGY. COMON-SAN PEDRO COASTAL ROAD LEADING TO SAN JOSE PORT AND BEACHES, RESORTS AND SUNSET VIEWING, SAN JOSE, ANTIQUE | Region VI | Region VI | Completed | ₱68.6M | 100% | Medium risk54 | —-0.042 |
| 66 | 20G00094IMPROVEMENT OF BRIDGE, CABIA-AN RIVER, BRGY, CABIA-AN | Region VI | Region VI | Completed | ₱72.1M | 100% | Medium risk54 | Flagged0.019 |
| 67 | 22G00170CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - BACOLOD - MURCIA - DS BENEDICTO - SN CARLOS CITY RD (S00427NR) K0074+100 - K0074+350 | Region VI | Region VI | On-Going | ₱64.2M | 61% | Medium risk53 | —-0.010 |
| 68 | 21G00036CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - BACOLOD - MURCIA - DS BENEDICTO - SN CARLOS CITY RD - K0073+250 - K0073+800 | Region VI | Region VI | Completed | ₱72.4M | 100% | Medium risk53 | —-0.074 |
| 69 | 18GB0062ROAD WIDENING (2-4 LANES) INCLUDING ROW: ILOILO - ANTIQUE RD, K0105+079 - K0105+598, K0106+000 - K0106+312, K0106+653 - K0108+000, K0109+000 - K110+000 | Region VI | Antique DEO | Completed | ₱73.5M | 100% | Medium risk52 | —-0.078 |
| 70 | 21G00055BAGO - MAAO - LOUISANA - BINUBUHAN - SAN MIGUEL - HAGUIMIT - LA CASTELLANA ROAD, NEGROS OCCIDENTAL | Region VI | Region VI | Completed | ₱64.9M | 100% | Medium risk52 | —-0.071 |
| 71 | 20G00081PREVENTIVE MAINTENANCE OF ROAD (ASPHALT OVERLAY) BAGO - MAMBUCAL ROAD K0042+680 - K0052+116 | Region VI | Region VI | Completed | ₱77.2M | 100% | Medium risk52 | —-0.076 |
| 72 | 20G00082PREVENTIVE MAINTENANCE OF ROAD (ASPHALT OVERLAY) JCT. PALENCIA - BOY SCOUT CAMPSITE ROAD K0051+570 - K0059+312 | Region VI | Region VI | Completed | ₱57.9M | 100% | Medium risk52 | —-0.079 |
| 73 | 19G00045RECONSTRUCTION TO CONCRETE PAVEMENT - ON SPECIFIC LOCATIONS ALONG BAGO-MAMBUCAL RD K0034+400 TO K0039+063 | Region VI | Region VI | Completed | ₱71.5M | 100% | Medium risk52 | —-0.077 |
| 74 | 19G00047ROAD WIDENING - ON SPECIFIC LOCATIONS ALONG JCT. BAGONAWA - LA CASTELLANA - ISABELA RD K0046+250 - K0052+463 | Region VI | Region VI | Completed | ₱59.8M | 100% | Medium risk52 | —-0.079 |
| 75 | 20GK0159ROAD WIDENING - AT SPECIFIC LOCATIONS ALONG BACOLOD -MURCIA-DS BENEDICTO-SN CARLOS CITY RD (S00009NR)-K0041+000-K0067+865 | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱67.5M | 100% | Medium risk52 | —-0.087 |