Contractor dossier
306 projects on file, including joint ventures this contractor is part of.
Total projects
306
Total budget
₱4.2B
Average progress
98.1%
Completion rate
93.8%
Average risk score
34.2
Medium risk on average, out of 100
Flagged as unusual
7
2.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Negros Island Region | 267 | ₱3.3B | 32.8 | 6 | 98.3% |
| Region VI | 37 | ₱872.3M | 42.9 | 0 | 98.5% |
| Region XI | 1 | ₱98.2M | 95.6 | 1 | 19.3% |
| Region III | 1 | ₱2.5M | 13.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 157 | ₱1.1B | 26.4 | 1 | 99.5% |
| Roads | 93 | ₱1.7B | 39.2 | 1 | 98.2% |
| Flood Control and Drainage | 20 | ₱1.2B | 51.0 | 0 | 96.1% |
| Water Provision and Storage | 14 | ₱73.8M | 32.2 | 0 | 100.0% |
| Bridges | 13 | ₱62.9M | 30.3 | 0 | 100.0% |
| GAA 2025 SSP | 7 | ₱144.8M | 89.6 | 5 | 62.2% |
| GAA 2025 OO-2 | 1 | ₱46.5M | 88.1 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱6.3M | 78.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LG0074CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SITIO ALEGRI RIVER, BRGY. LA UNION, SAN ISIDRO, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱98.2M | 19% | High risk96 | Flagged0.050 |
| 25GM0022CONSTRUCTION OF CONCRETE ROAD- CONSTRUCTION OF PUROK MANGGA ROAD, BARANGAY TAMPALON, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱11.9M | 13% | High risk93 | Flagged0.032 |
| 25GO0138CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SUM-AG , BACOLOD CITY | Negros Island Region | Bacolod City DEO | On-Going | ₱9.7M | 91% | High risk91 | Flagged0.004 |
| 25GO0053CONSTRUCTION OF ROAD, BARANGAY ESTEFANIA, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱10.3M | 80% | High risk89 | Flagged0.009 |
| 25GK0036CONSTRUCTION OF FLOOD CONTROL STRUCTURE OF MALOGO RIVER, ABUTMENT A EB. MAGALONA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱46.5M | 100% | High risk88 | —-0.021 |
| 25GN0066CONSTRUCTION OF BARANGAY HALL FOR BARANGAY RECREO, PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱4.9M | 100% | High risk87 | —-0.017 |
| 25GN0067CONSTRUCTION OF BARANGAY HALL FOR BARANGAY MABINI, PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱4.9M | 100% | High risk86 | —-0.017 |
| 25GO0126REHABILITATION OF MULTI-PURPOSE BUILDING, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱4.9M | 32% | High risk85 | Flagged0.023 |
| 25GE0034RECONSTRUCTION TO CONCRETE PAVEMENT-GUIMARAS CIRCUMFERENTIAL RD (S00028GR) CHAINAGE 0-CHAINAGE 26, CHAINAGE 0-CHAINAGE 62, CHAINAGE 95-CHAINAGE 152 | Region VI | Guimaras DEO | Completed | ₱6.3M | 100% | High risk78 | —-0.032 |
| 17RB0110CONSTRUCTION/REHABILITATION OF STUDENT CENTER, CARLOS HILADO MEMORIAL STATE COLLEGE, TALISAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱9.3M | 100% | High risk66 | —-0.061 |
| 20GK0046CONSTRUCTION OF CONCRETE ROAD - ACCESS ROAD LEADING TO PACOL FALLS, ALIMATOC RICE TERRACES AND PRAYER MOUNTAIN, BRGY. V.F. GUSTILO, CADIZ CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱29.4M | 100% | High risk66 | —-0.061 |
| 25GG0201CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JALAUR RIVER IN BAROTAC NUEVO, ILOILO (PACKAGE B) | Region VI | Iloilo 2nd DEO | On-Going | ₱119.1M | 56% | High risk65 | —-0.014 |
| 20G00006CONSTRUCTION OF CONCRETE ROAD - BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 2, PACKAGE C, BACOLOD CITY | Region VI | Region VI | Completed | ₱140.4M | 100% | High risk63 | —-0.044 |
| 19GK0153CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALOGO RIVER (BOTH STREAM), ABUT. A EB. MAGALONA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱93.6M | 100% | High risk62 | —-0.052 |
| 23HK0086SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF RIVER CONTROL, POBLACION, AMLAN, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.054 |
| 24GK0010CONSTRUCTION OF FLOOD CONTROL STRUCTURE OF IMBANG RIVER (UPSTREAM), SILAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.054 |
| 24GK0013CONSTRUCTION OF FLOOD CONTROL STRUCTURE OF MALOGO RIVER, ABUTMENT A EB. MAGALONA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.056 |
| 24GK0154CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CATABLA RIVER, TALISAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.057 |
| 17RD0090CONCRETING OF SO. LOWAG, BRGY. LOCOTAN ROAD, SO. LOWAG, BRGY. LOCOTAN, KABANKALAN CITY,NEGROS OCCIDE | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱11.3M | 100% | High risk60 | —-0.012 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LG0074CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SITIO ALEGRI RIVER, BRGY. LA UNION, SAN ISIDRO, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱98.2M | 19% | High risk96 | Flagged0.050 |
| 25GM0022CONSTRUCTION OF CONCRETE ROAD- CONSTRUCTION OF PUROK MANGGA ROAD, BARANGAY TAMPALON, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱11.9M | 13% | High risk93 | Flagged0.032 |
| 25GO0126REHABILITATION OF MULTI-PURPOSE BUILDING, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱4.9M | 32% | High risk85 | Flagged0.023 |
| 25GO0053CONSTRUCTION OF ROAD, BARANGAY ESTEFANIA, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱10.3M | 80% | High risk89 | Flagged0.009 |
| 24GK0210CONSTRUCTION OF 4STY8CL, DOMINADOR 'OKING' JISON MEMORIAL ELEMENTARY SCHOOL, SILAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱35.7M | 40% | Medium risk42 | Flagged0.009 |
| 24GM0058CONCRETING OF BRGY. SURA FMR, BRGY. SURA, CAUAYAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱14.9M | 40% | Medium risk44 | Flagged0.006 |
| 25GO0138CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SUM-AG , BACOLOD CITY | Negros Island Region | Bacolod City DEO | On-Going | ₱9.7M | 91% | High risk91 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25LG0074CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SITIO ALEGRI RIVER, BRGY. LA UNION, SAN ISIDRO, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱98.2M | 19% | High risk96 | Flagged0.050 |
| 2 | 25GM0022CONSTRUCTION OF CONCRETE ROAD- CONSTRUCTION OF PUROK MANGGA ROAD, BARANGAY TAMPALON, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱11.9M | 13% | High risk93 | Flagged0.032 |
| 3 | 25GO0138CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SUM-AG , BACOLOD CITY | Negros Island Region | Bacolod City DEO | On-Going | ₱9.7M | 91% | High risk91 | Flagged0.004 |
| 4 | 25GO0053CONSTRUCTION OF ROAD, BARANGAY ESTEFANIA, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱10.3M | 80% | High risk89 | Flagged0.009 |
| 5 | 25GK0036CONSTRUCTION OF FLOOD CONTROL STRUCTURE OF MALOGO RIVER, ABUTMENT A EB. MAGALONA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱46.5M | 100% | High risk88 | —-0.021 |
| 6 | 25GN0066CONSTRUCTION OF BARANGAY HALL FOR BARANGAY RECREO, PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱4.9M | 100% | High risk87 | —-0.017 |
| 7 | 25GN0067CONSTRUCTION OF BARANGAY HALL FOR BARANGAY MABINI, PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱4.9M | 100% | High risk86 | —-0.017 |
| 8 | 25GO0126REHABILITATION OF MULTI-PURPOSE BUILDING, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱4.9M | 32% | High risk85 | Flagged0.023 |
| 9 | 25GE0034RECONSTRUCTION TO CONCRETE PAVEMENT-GUIMARAS CIRCUMFERENTIAL RD (S00028GR) CHAINAGE 0-CHAINAGE 26, CHAINAGE 0-CHAINAGE 62, CHAINAGE 95-CHAINAGE 152 | Region VI | Guimaras DEO | Completed | ₱6.3M | 100% | High risk78 | —-0.032 |
| 10 | 17RB0110CONSTRUCTION/REHABILITATION OF STUDENT CENTER, CARLOS HILADO MEMORIAL STATE COLLEGE, TALISAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱9.3M | 100% | High risk66 | —-0.061 |
| 11 | 20GK0046CONSTRUCTION OF CONCRETE ROAD - ACCESS ROAD LEADING TO PACOL FALLS, ALIMATOC RICE TERRACES AND PRAYER MOUNTAIN, BRGY. V.F. GUSTILO, CADIZ CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱29.4M | 100% | High risk66 | —-0.061 |
| 12 | 25GG0201CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JALAUR RIVER IN BAROTAC NUEVO, ILOILO (PACKAGE B) | Region VI | Iloilo 2nd DEO | On-Going | ₱119.1M | 56% | High risk65 | —-0.014 |
| 13 | 20G00006CONSTRUCTION OF CONCRETE ROAD - BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 2, PACKAGE C, BACOLOD CITY | Region VI | Region VI | Completed | ₱140.4M | 100% | High risk63 | —-0.044 |
| 14 | 19GK0153CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALOGO RIVER (BOTH STREAM), ABUT. A EB. MAGALONA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱93.6M | 100% | High risk62 | —-0.052 |
| 15 | 23HK0086SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF RIVER CONTROL, POBLACION, AMLAN, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.054 |
| 16 | 24GK0010CONSTRUCTION OF FLOOD CONTROL STRUCTURE OF IMBANG RIVER (UPSTREAM), SILAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.054 |
| 17 | 24GK0013CONSTRUCTION OF FLOOD CONTROL STRUCTURE OF MALOGO RIVER, ABUTMENT A EB. MAGALONA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.056 |
| 18 | 24GK0154CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CATABLA RIVER, TALISAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.057 |
| 19 | 17RD0090CONCRETING OF SO. LOWAG, BRGY. LOCOTAN ROAD, SO. LOWAG, BRGY. LOCOTAN, KABANKALAN CITY,NEGROS OCCIDE | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱11.3M | 100% | High risk60 | —-0.012 |
| 20 | 23HM0006OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM AT MARIA, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱57M | 74% | Medium risk54 | —-0.011 |
| 21 | 20GG0135COMPLETION OF MULTI-PURPOSE BUILDING (GYMNASIUM), | Region VI | Iloilo 2nd DEO | Completed | ₱47.5M | 100% | Medium risk52 | —-0.077 |
| 22 | 19G00007CONSTRUCTION OF CONCRETE ROAD - BACOLOD - NEGROS OCCIDENTAL ECONOMIC HIGHWAY, (SECTION 2), PACKAGE A, BACOLOD CITY | Region VI | Region VI | Completed | ₱65.2M | 100% | Medium risk52 | —-0.078 |
| 23 | 24GK0114OFF-CARRIAGEWAY IMPROVEMENT: CONSTRUCTION OF SIDEWALK INCLUDING DRAINAGE - BACOLOD SILAY AIRPORT ACCESS RD - K0008 + (-774) - K0011 + 670 | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱84.1M | 100% | Medium risk52 | —-0.080 |
| 24 | 22G00192CONSTRUCTION OF EVACUATION CENTER, SITIO CANLAYUHAN, BARANGAY GIL MONTILLA, SIPALAY CITY, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱46.8M | 88% | Medium risk51 | —-0.024 |
| 25 | 23GK0005CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALOGO RIVER, ABUT. A EB. MAGALONA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱86.8M | 100% | Medium risk51 | —-0.059 |