Contractor dossier
306 projects on file, including joint ventures this contractor is part of.
Total projects
306
Total budget
₱4.2B
Average progress
98.1%
Completion rate
93.8%
Average risk score
34.2
Medium risk on average, out of 100
Flagged as unusual
7
2.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Negros Island Region | 267 | ₱3.3B | 32.8 | 6 | 98.3% |
| Region VI | 37 | ₱872.3M | 42.9 | 0 | 98.5% |
| Region XI | 1 | ₱98.2M | 95.6 | 1 | 19.3% |
| Region III | 1 | ₱2.5M | 13.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 157 | ₱1.1B | 26.4 | 1 | 99.5% |
| Roads | 93 | ₱1.7B | 39.2 | 1 | 98.2% |
| Flood Control and Drainage | 20 | ₱1.2B | 51.0 | 0 | 96.1% |
| Water Provision and Storage | 14 | ₱73.8M | 32.2 | 0 | 100.0% |
| Bridges | 13 | ₱62.9M | 30.3 | 0 | 100.0% |
| GAA 2025 SSP | 7 | ₱144.8M | 89.6 | 5 | 62.2% |
| GAA 2025 OO-2 | 1 | ₱46.5M | 88.1 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱6.3M | 78.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LG0074CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SITIO ALEGRI RIVER, BRGY. LA UNION, SAN ISIDRO, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱98.2M | 19% | High risk96 | Flagged0.050 |
| 25GM0022CONSTRUCTION OF CONCRETE ROAD- CONSTRUCTION OF PUROK MANGGA ROAD, BARANGAY TAMPALON, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱11.9M | 13% | High risk93 | Flagged0.032 |
| 25GO0138CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SUM-AG , BACOLOD CITY | Negros Island Region | Bacolod City DEO | On-Going | ₱9.7M | 91% | High risk91 | Flagged0.004 |
| 25GO0053CONSTRUCTION OF ROAD, BARANGAY ESTEFANIA, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱10.3M | 80% | High risk89 | Flagged0.009 |
| 25GK0036CONSTRUCTION OF FLOOD CONTROL STRUCTURE OF MALOGO RIVER, ABUTMENT A EB. MAGALONA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱46.5M | 100% | High risk88 | —-0.021 |
| 25GN0066CONSTRUCTION OF BARANGAY HALL FOR BARANGAY RECREO, PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱4.9M | 100% | High risk87 | —-0.017 |
| 25GN0067CONSTRUCTION OF BARANGAY HALL FOR BARANGAY MABINI, PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱4.9M | 100% | High risk86 | —-0.017 |
| 25GO0126REHABILITATION OF MULTI-PURPOSE BUILDING, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱4.9M | 32% | High risk85 | Flagged0.023 |
| 25GE0034RECONSTRUCTION TO CONCRETE PAVEMENT-GUIMARAS CIRCUMFERENTIAL RD (S00028GR) CHAINAGE 0-CHAINAGE 26, CHAINAGE 0-CHAINAGE 62, CHAINAGE 95-CHAINAGE 152 | Region VI | Guimaras DEO | Completed | ₱6.3M | 100% | High risk78 | —-0.032 |
| 17RB0110CONSTRUCTION/REHABILITATION OF STUDENT CENTER, CARLOS HILADO MEMORIAL STATE COLLEGE, TALISAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱9.3M | 100% | High risk66 | —-0.061 |
| 20GK0046CONSTRUCTION OF CONCRETE ROAD - ACCESS ROAD LEADING TO PACOL FALLS, ALIMATOC RICE TERRACES AND PRAYER MOUNTAIN, BRGY. V.F. GUSTILO, CADIZ CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱29.4M | 100% | High risk66 | —-0.061 |
| 25GG0201CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JALAUR RIVER IN BAROTAC NUEVO, ILOILO (PACKAGE B) | Region VI | Iloilo 2nd DEO | On-Going | ₱119.1M | 56% | High risk65 | —-0.014 |
| 20G00006CONSTRUCTION OF CONCRETE ROAD - BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 2, PACKAGE C, BACOLOD CITY | Region VI | Region VI | Completed | ₱140.4M | 100% | High risk63 | —-0.044 |
| 19GK0153CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALOGO RIVER (BOTH STREAM), ABUT. A EB. MAGALONA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱93.6M | 100% | High risk62 | —-0.052 |
| 23HK0086SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF RIVER CONTROL, POBLACION, AMLAN, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.054 |
| 24GK0010CONSTRUCTION OF FLOOD CONTROL STRUCTURE OF IMBANG RIVER (UPSTREAM), SILAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.054 |
| 24GK0013CONSTRUCTION OF FLOOD CONTROL STRUCTURE OF MALOGO RIVER, ABUTMENT A EB. MAGALONA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.056 |
| 24GK0154CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CATABLA RIVER, TALISAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.057 |
| 17RD0090CONCRETING OF SO. LOWAG, BRGY. LOCOTAN ROAD, SO. LOWAG, BRGY. LOCOTAN, KABANKALAN CITY,NEGROS OCCIDE | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱11.3M | 100% | High risk60 | —-0.012 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LG0074CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SITIO ALEGRI RIVER, BRGY. LA UNION, SAN ISIDRO, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱98.2M | 19% | High risk96 | Flagged0.050 |
| 25GM0022CONSTRUCTION OF CONCRETE ROAD- CONSTRUCTION OF PUROK MANGGA ROAD, BARANGAY TAMPALON, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱11.9M | 13% | High risk93 | Flagged0.032 |
| 25GO0126REHABILITATION OF MULTI-PURPOSE BUILDING, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱4.9M | 32% | High risk85 | Flagged0.023 |
| 25GO0053CONSTRUCTION OF ROAD, BARANGAY ESTEFANIA, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱10.3M | 80% | High risk89 | Flagged0.009 |
| 24GK0210CONSTRUCTION OF 4STY8CL, DOMINADOR 'OKING' JISON MEMORIAL ELEMENTARY SCHOOL, SILAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱35.7M | 40% | Medium risk42 | Flagged0.009 |
| 24GM0058CONCRETING OF BRGY. SURA FMR, BRGY. SURA, CAUAYAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱14.9M | 40% | Medium risk44 | Flagged0.006 |
| 25GO0138CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SUM-AG , BACOLOD CITY | Negros Island Region | Bacolod City DEO | On-Going | ₱9.7M | 91% | High risk91 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 18GF0028CONCRETING OF IGCOCOLO-PARADAHAN ROAD, BRGY. IGCOCOLO, GUIMBAL, ILOILO (STA. 32+870 - STA. 33+370) | Region VI | Iloilo 1st DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.088 |
| 102 | 25GK0100CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD -JCT. MURCIA-CANSILAYAN-DAMSITE-ABUANAN-BAGO CITY RD - K0020+360 - K0020+670, K0022+438 - K0022+688, MURCIA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱7.1M | 89% | Medium risk44 | —-0.067 |
| 103 | 18GO0079CONCRETING OF BACOLOD CITY NATIONAL HIGH SCHOOL ROADS, BRGY. TACULING, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | Completed | ₱5.6M | 100% | Medium risk44 | —-0.091 |
| 104 | 19GM0089CONSTRUCTION OF ACCESS ROAD LEADING TO MAG-ASO FALLS TO SITIO PITGONG, BARANGAY ORINGAO, KABANKALAN CITY, NEROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.9M | 100% | Medium risk44 | —-0.092 |
| 105 | 21GO0004REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROAD- SECONDARY ROAD-BACOLOD CIRCUMFERENTIAL RD-K0011+433-K0011+520,BACOLOD CITY,NEG.OCC | Negros Island Region | Bacolod City DEO | Completed | ₱6.9M | 100% | Medium risk44 | —-0.094 |
| 106 | 18GG0209CONSTRUCTION OF ONE (1) UNIT TWO (2) STOREY EIGHT (8) CLASSROOMS, DACUTAN ELEMENTARY SCHOOL, DUMANGAS, ILOILO | Region VI | Iloilo 2nd DEO | Completed | ₱16.3M | 100% | Medium risk44 | —-0.040 |
| 107 | 18GG0210CONSTRUCTION OF ONE (1) UNIT TWO (2) STOREY EIGHT (8) CLASSROOMS, MAQUINA ELEMENTARY SCHOOL, DUMANGAS, ILOILO | Region VI | Iloilo 2nd DEO | Completed | ₱16.3M | 100% | Medium risk44 | —-0.040 |
| 108 | 25GM0031CONSTRUCTION OF MULTI-PURPOSE BUILDING-CONSTRUCTION OF MULTI-PURPOSE BUILDING, PACAO ELEMENTARY SCHOOL, BARANGAY BANTAYAN, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.086 |
| 109 | 19GM0005RECONSTRUCTION TO CONCRETE PAVEMENT ON SPECIFIC LOCATIONS ALONG KABANKALAN JCT. SALONG TAPI DACONGCOGON BANTAYAN ROAD (S00180NR) K0099+439 TO K0113+267, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱13.9M | 100% | Medium risk44 | —-0.091 |
| 110 | 25GM0024CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF SITIO MOLOBOLO ROAD, BARANGAY CAMANSI, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱11.9M | 100% | Medium risk44 | —-0.091 |
| 111 | 23GK0180CONSTRUCTION OF SOLAR WATER SYSTEM, SILAY CITY, PROVINCE OF NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱9.8M | 100% | Medium risk44 | —-0.044 |
| 112 | 23GK0182CONSTRUCTION OF SOLAR WATER SYSTEM, VICTORIAS CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱9.8M | 100% | Medium risk44 | —-0.053 |
| 113 | 19GM0060CONSTRUCTION OF ROAD, BRGY. 1, ILOG, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.4M | 100% | Medium risk44 | —-0.090 |
| 114 | 19GM0061CONSTRUCTION OF LOCAL ROAD - SITIO SAN RAMON TO CROSSING AMBUSH, MANALAD, ILOG, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.4M | 100% | Medium risk44 | —-0.091 |
| 115 | 19GM0078CONSTRUCTION OF ROAD - BRGY. 2, ILOG, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.4M | 100% | Medium risk44 | —-0.091 |
| 116 | 18GK0211CONSTRUCTION OF FARM TO MILL ROAD OF STA. TERESITA, BRGY. DOS HERMANAS TO HIYANG-HIYANG, BRGY. KATILINGBAN, TALISAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱30.5M | 100% | Medium risk44 | —-0.039 |
| 117 | 22GK0188CONSTRUCTION OF WATER SYSTEM - MURCIA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱9.8M | 100% | Medium risk44 | —-0.054 |
| 118 | 20GM0055CONSTRUCTION OF MULTI-PURPOSE BUILDING, BUNGA-BUNGA ELEMENTARY SCHOOL, BRGY. CANTURAY, SIPALAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱14.1M | 100% | Medium risk44 | —-0.084 |
| 119 | 21GO0037CONSTRUCTION OF WATER SUPPLY SYSTEMS-CONSTRUCTION/ REHABILITATION OF WATER SUPPLY SYSTEMS, BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱9.9M | 100% | Medium risk44 | —-0.054 |
| 120 | 24GM0058CONCRETING OF BRGY. SURA FMR, BRGY. SURA, CAUAYAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱14.9M | 40% | Medium risk44 | Flagged0.006 |
| 121 | 23GM0049CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OF MULTI-PURPOSE BUILDING IN MUNICIPALITY OF KABANKALAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱5.2M | 100% | Medium risk43 | —-0.087 |
| 122 | 25GM0034CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) BARANGAY 3, SIPALAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱5M | 100% | Medium risk43 | —-0.085 |
| 123 | 24GK0210CONSTRUCTION OF 4STY8CL, DOMINADOR 'OKING' JISON MEMORIAL ELEMENTARY SCHOOL, SILAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱35.7M | 40% | Medium risk42 | Flagged0.009 |
| 124 | 20GK0096CONSTRUCTION OF WATER SUPPLY SYSTEMS - CONSTRUCTION OF WATER SYSTEM, BRGY. BUENAVISTA, CALATRAVA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱2.8M | 100% | Medium risk42 | —-0.030 |
| 125 | 18GK0236CONSTRUCTION OF 2STY8CL SCHOOL BUILDING AT BUENAVENTURA RODRIGUEZ ELEMENTARY SCHOOL, SAGAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱22.4M | 100% | Medium risk42 | —-0.043 |