Contractor dossier
306 projects on file, including joint ventures this contractor is part of.
Total projects
306
Total budget
₱4.2B
Average progress
98.1%
Completion rate
93.8%
Average risk score
34.2
Medium risk on average, out of 100
Flagged as unusual
7
2.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Negros Island Region | 267 | ₱3.3B | 32.8 | 6 | 98.3% |
| Region VI | 37 | ₱872.3M | 42.9 | 0 | 98.5% |
| Region XI | 1 | ₱98.2M | 95.6 | 1 | 19.3% |
| Region III | 1 | ₱2.5M | 13.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 157 | ₱1.1B | 26.4 | 1 | 99.5% |
| Roads | 93 | ₱1.7B | 39.2 | 1 | 98.2% |
| Flood Control and Drainage | 20 | ₱1.2B | 51.0 | 0 | 96.1% |
| Water Provision and Storage | 14 | ₱73.8M | 32.2 | 0 | 100.0% |
| Bridges | 13 | ₱62.9M | 30.3 | 0 | 100.0% |
| GAA 2025 SSP | 7 | ₱144.8M | 89.6 | 5 | 62.2% |
| GAA 2025 OO-2 | 1 | ₱46.5M | 88.1 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱6.3M | 78.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LG0074CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SITIO ALEGRI RIVER, BRGY. LA UNION, SAN ISIDRO, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱98.2M | 19% | High risk96 | Flagged0.050 |
| 25GM0022CONSTRUCTION OF CONCRETE ROAD- CONSTRUCTION OF PUROK MANGGA ROAD, BARANGAY TAMPALON, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱11.9M | 13% | High risk93 | Flagged0.032 |
| 25GO0138CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SUM-AG , BACOLOD CITY | Negros Island Region | Bacolod City DEO | On-Going | ₱9.7M | 91% | High risk91 | Flagged0.004 |
| 25GO0053CONSTRUCTION OF ROAD, BARANGAY ESTEFANIA, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱10.3M | 80% | High risk89 | Flagged0.009 |
| 25GK0036CONSTRUCTION OF FLOOD CONTROL STRUCTURE OF MALOGO RIVER, ABUTMENT A EB. MAGALONA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱46.5M | 100% | High risk88 | —-0.021 |
| 25GN0066CONSTRUCTION OF BARANGAY HALL FOR BARANGAY RECREO, PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱4.9M | 100% | High risk87 | —-0.017 |
| 25GN0067CONSTRUCTION OF BARANGAY HALL FOR BARANGAY MABINI, PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱4.9M | 100% | High risk86 | —-0.017 |
| 25GO0126REHABILITATION OF MULTI-PURPOSE BUILDING, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱4.9M | 32% | High risk85 | Flagged0.023 |
| 25GE0034RECONSTRUCTION TO CONCRETE PAVEMENT-GUIMARAS CIRCUMFERENTIAL RD (S00028GR) CHAINAGE 0-CHAINAGE 26, CHAINAGE 0-CHAINAGE 62, CHAINAGE 95-CHAINAGE 152 | Region VI | Guimaras DEO | Completed | ₱6.3M | 100% | High risk78 | —-0.032 |
| 17RB0110CONSTRUCTION/REHABILITATION OF STUDENT CENTER, CARLOS HILADO MEMORIAL STATE COLLEGE, TALISAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱9.3M | 100% | High risk66 | —-0.061 |
| 20GK0046CONSTRUCTION OF CONCRETE ROAD - ACCESS ROAD LEADING TO PACOL FALLS, ALIMATOC RICE TERRACES AND PRAYER MOUNTAIN, BRGY. V.F. GUSTILO, CADIZ CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱29.4M | 100% | High risk66 | —-0.061 |
| 25GG0201CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JALAUR RIVER IN BAROTAC NUEVO, ILOILO (PACKAGE B) | Region VI | Iloilo 2nd DEO | On-Going | ₱119.1M | 56% | High risk65 | —-0.014 |
| 20G00006CONSTRUCTION OF CONCRETE ROAD - BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 2, PACKAGE C, BACOLOD CITY | Region VI | Region VI | Completed | ₱140.4M | 100% | High risk63 | —-0.044 |
| 19GK0153CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALOGO RIVER (BOTH STREAM), ABUT. A EB. MAGALONA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱93.6M | 100% | High risk62 | —-0.052 |
| 23HK0086SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF RIVER CONTROL, POBLACION, AMLAN, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.054 |
| 24GK0010CONSTRUCTION OF FLOOD CONTROL STRUCTURE OF IMBANG RIVER (UPSTREAM), SILAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.054 |
| 24GK0013CONSTRUCTION OF FLOOD CONTROL STRUCTURE OF MALOGO RIVER, ABUTMENT A EB. MAGALONA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.056 |
| 24GK0154CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CATABLA RIVER, TALISAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.057 |
| 17RD0090CONCRETING OF SO. LOWAG, BRGY. LOCOTAN ROAD, SO. LOWAG, BRGY. LOCOTAN, KABANKALAN CITY,NEGROS OCCIDE | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱11.3M | 100% | High risk60 | —-0.012 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LG0074CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SITIO ALEGRI RIVER, BRGY. LA UNION, SAN ISIDRO, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | On-Going | ₱98.2M | 19% | High risk96 | Flagged0.050 |
| 25GM0022CONSTRUCTION OF CONCRETE ROAD- CONSTRUCTION OF PUROK MANGGA ROAD, BARANGAY TAMPALON, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱11.9M | 13% | High risk93 | Flagged0.032 |
| 25GO0126REHABILITATION OF MULTI-PURPOSE BUILDING, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱4.9M | 32% | High risk85 | Flagged0.023 |
| 25GO0053CONSTRUCTION OF ROAD, BARANGAY ESTEFANIA, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱10.3M | 80% | High risk89 | Flagged0.009 |
| 24GK0210CONSTRUCTION OF 4STY8CL, DOMINADOR 'OKING' JISON MEMORIAL ELEMENTARY SCHOOL, SILAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱35.7M | 40% | Medium risk42 | Flagged0.009 |
| 24GM0058CONCRETING OF BRGY. SURA FMR, BRGY. SURA, CAUAYAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱14.9M | 40% | Medium risk44 | Flagged0.006 |
| 25GO0138CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SUM-AG , BACOLOD CITY | Negros Island Region | Bacolod City DEO | On-Going | ₱9.7M | 91% | High risk91 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 18GM0150CONSTRUCTION OF 1 UNIT TWO (2) STOREY ICT LABORATORY BUILDING AT TAN-AWAN NATIONAL HIGH SCHOOL, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.2M | 100% | Medium risk36 | —-0.044 |
| 152 | 18GM0096CONSTRUCTION OF 1 UNIT TWO (2) STOREY SCIENCE LABORATORY BUILDING AT BULATA NHS, CAUAYAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.1M | 100% | Medium risk36 | —-0.045 |
| 153 | 18GM0133CONSTRUCTION OF 1 UNIT TWO (2) STOREY ICT LABORATORY BUILDING AT BULATA NHS, CAUAYAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.1M | 100% | Medium risk36 | —-0.045 |
| 154 | 18GM0099CONSTRUCTION OF 1 UNIT TWO (2) STOREY SCIENCE LABORATORY BUILDING AT EVA J. MONTILLA NHS, CAUAYAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.2M | 100% | Medium risk36 | —-0.045 |
| 155 | 18GM0136CONSTRUCTION OF 1 UNIT TWO (2) STOREY ICT LABORATORY BUILDING AT EVA J. MONTILLA NHS, CAUAYAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.3M | 100% | Medium risk36 | —-0.045 |
| 156 | 18GM0097CONSTRUCTION OF 1 UNIT TWO (2) STOREY SCIENCE LABORATORY BUILDING AT CAMALANDA-AN NHS, CAUAYAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.2M | 100% | Medium risk36 | —-0.045 |
| 157 | 18GM0134CONSTRUCTION OF 1 UNIT TWO (2) STOREY ICT LABORATORY BUILDING AT CAMALANDA-AN NHS, CAUAYAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.3M | 100% | Medium risk36 | —-0.045 |
| 158 | 18GM0182CONSTRUCTION OF ONE (1) UNIT TWO (2) STOREY REGULAR WORKSHOP BUILDING AT FLORENTINO GALANG SR. NHS, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.1M | 100% | Medium risk35 | —-0.046 |
| 159 | 18GM0107CONSTRUCTION OF 1 UNIT TWO (2) STOREY SCIENCE LABORATORY BUILDING AT CAROL-AN NHS, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.1M | 100% | Medium risk35 | —-0.047 |
| 160 | 18GM0191CONSTRUCTION OF ONE (1) TWO (2) STOREY REGULAR WORKSHOP BUILDING AT CAMANSI NATIONAL HIGH SCHOOL, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.1M | 100% | Medium risk35 | —-0.044 |
| 161 | 18GM0192CONSTRUCTION OF ONE (1) UNIT TWO (2)STOREY REGULAR WORKSHOP BUILDING AT CAMANSI NATIONAL HIGH SCHOOL, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.1M | 100% | Medium risk35 | —-0.044 |
| 162 | 18GM0190CONSTRUCTION OF ONE (1) UNIT TWO (2) STOREY REGULAR WORKSHOP BUILDING AT CAMANSI NATIONAL HIGH SCHOOL, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.4M | 100% | Medium risk35 | —-0.044 |
| 163 | 18GM0102CONSTRUCTION OF 1 UNIT TWO (2) STOREY SCIENCE LABORATORY BUILDING AT GUILJUNGAN NHS-ABACA EXT., CAUAYAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.4M | 100% | Medium risk35 | —-0.045 |
| 164 | 18GM0195CONSTRUCTION OF ONE (1) UNIT TWO (2) STOREY ICT LABORATORY BUILDING AT BOCANA NHS, ILOG, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.2M | 100% | Medium risk35 | —-0.046 |
| 165 | 18GM0189CONSTRUCTION OF ONE (1) UNIT TWO (2) STOREY REGULAR WORKSHOP BUILDING AT CAMANSI NATIONAL HIGH SCHOOL, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.4M | 100% | Medium risk35 | —-0.046 |
| 166 | 18GM0110CONSTRUCTION OF 1 UNIT TWO (2) STOREY SCIENCE LABORATORY BUILDING AT TABUGON NHS, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱8.6M | 100% | Medium risk35 | —-0.046 |
| 167 | 18GM0117CONSTRUCTION OF 1 UNIT THREE (3) STOREY REGULAR WORKSHOP BUILDING AT BANTAYAN NATIONAL HIGH SCHOOL, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱13.4M | 100% | Medium risk35 | —-0.045 |
| 168 | 18GM0121CONSTRUCTION OF 1 UNIT THREE (3) STOREY REGULAR WORKSHOP BUILDING AT TABUGON NHS, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱13.2M | 100% | Medium risk35 | —-0.046 |
| 169 | 18GM0122CONSTRUCTION OF 1 UNIT THREE (3) STOREY REGULAR WORKSHOP BUILDING AT TABUGON NHS, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱13.2M | 100% | Medium risk35 | —-0.046 |
| 170 | 18GM0080CONCRETING OF SITIO CROTONS-SITIO ISAM, BRGY. CANLAMAY FMR, BRGY. CANLAMAY, ILOG, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱4.7M | 100% | Medium risk35 | —-0.040 |
| 171 | 17RD0007COSTRUCTION OF BRGY. ROAD, INAPOY TO SO. PILIOPILIOHAN, BRGY. INAPOY, KABANKALAN CITY | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱2.4M | 100% | Medium risk35 | —-0.059 |
| 172 | 17RD0006CONSTRUCTION OF ROAD, BRGY. CAROL-AN, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱2.3M | 100% | Medium risk35 | —-0.059 |
| 173 | 17RD0060CONSTRUCTION OF ROAD, BRGY. ANUDULAUAN, ILOG, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱2.8M | 100% | Medium risk35 | —-0.055 |
| 174 | 17RD0122CONSTRUCTION OF ONE (1) UNIT ONE (1) STOREY FOUR (4) CLASSROOMS AT CAMALANDA-AN ES, CAUAYAN, NEGROS | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱5.4M | 100% | Medium risk34 | —-0.024 |
| 175 | 17RD0120CONSTRUCTION OF ONE (1) UNIT ONE (1) STOREY FOUR (4) CLASSROOMS AT HABA ES, CANDONI, NEGROS OCCIDENT | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱5.6M | 100% | Medium risk34 | —-0.024 |