66 projects on file, including joint ventures this contractor is part of.
Total projects
66
Total budget
₱1.6B
Average progress
88.5%
Completion rate
60.6%
Below 70%
Average risk score
50.2
Medium risk on average, out of 100
Flagged as unusual
8
12.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Negros Island Region | 53 | ₱702.7M | 48.4 | 6 | 90.9% |
| Region VI | 6 | ₱250.9M | 66.6 | 1 | 70.9% |
| Region III | 4 | ₱192.3M | 39.1 | 0 | 100.0% |
| Region XI | 2 | ₱189.5M | 62.7 | 0 | 97.9% |
| Region VII | 1 | ₱236.4M | 66.6 | 1 | 0.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 28 | ₱789M | 48.2 | 1 | 94.3% |
| Buildings and Facilities | 22 | ₱136.1M | 41.7 | 0 | 86.4% |
| GAA 2025 SSP | 5 | ₱77.2M | 89.9 | 5 | 73.1% |
| Flood Control and Drainage | 3 | ₱258.3M | 52.9 | 1 | 66.7% |
| Water Provision and Storage | 3 | ₱10.5M | 23.5 | 0 | 100.0% |
| Bridges | 2 | ₱79.5M | 49.0 | 0 | 80.9% |
| GAA 2025 OO-1 | 1 | ₱47.8M | 94.3 | 0 | 80.5% |
| GAA 2025 OO-2 | 1 | ₱77M | 92.6 | 0 | 91.0% |
| OTHER | 1 | ₱96.5M | 80.7 | 1 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25G00076INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG AKLAN EAST RD- K0286+071- K0290+170 | Region VI | Region VI | On-Going | ₱47.8M | 23% | High risk95 | Flagged0.032 |
| 25G00001REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - ILOG BR. (B00217NR) ALONG BACOLOD SOUTH RD (KABANKALAN-HINOBAAN SECTION) | Negros Island Region | Negros Island Region | On-Going | ₱47.8M | 81% | High risk94 | —-0.004 |
| 25GP0007CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER BASIN, BARANGAY POBLACION ILAWOD TO BARANGAY SAN JOSE, DUMALAG, CAPIZ | Region VI | Capiz 2nd DEO | On-Going | ₱77M | 91% | High risk93 | —-0.008 |
| 25GO0083CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY CABUG, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱4.9M | 100% | High risk93 | Flagged0.002 |
| 25GO0150CONSTRUCTION OF MULTI-PURPOSE BUILDING (MASSKARA FESTIVAL FOUNDATION), BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱9.9M | 71% | High risk90 | Flagged0.012 |
| 25GO0112CONSTRUCTION OF PHILLIPPINE COAST GUARD OFFICE, BACOLOD CITY,NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱9.8M | 77% | High risk87 | Flagged0.011 |
| 25GO0092CONSTRUCTION OF DRAINAGE SYSTEM AT BRGY. FELISA, BACOLOD CITY | Negros Island Region | Bacolod City DEO | On-Going | ₱4.9M | 95% | High risk84 | Flagged0.004 |
| 23HK0064SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SHORE PROTECTION/SEAWALL, BRGY. CAPIÑAHAN, BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 100% | High risk81 | Flagged0.013 |
| 25GN0019CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PALAKA, VALLADOLID, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱4.9M | 100% | High risk69 | —-0.037 |
| 25GG0042INSTALLATION/ APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG ILOILO - CAPIZ RD (OLD ROUTE) - K0046 + 644 - K0048 + 804 | Region VI | Iloilo 6th DEO | On-Going | ₱14.7M | 50% | High risk67 | —-0.015 |
| 23H00053OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGMT. PROG., CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF LOBOC RIVER CONTROL STRUCTURE, TAMBANGAN SECTION (LEFT SIDE), LOAY, BOHOL | Region VII | Region VII | On-Going | ₱236.4M | 0% | High risk67 | Flagged0.033 |
| 25GN0016CONSTRUCTION OF ROAD CONNECTING BANTAYAN PARK AND BAGO BRIDGE, BARANGAY POBLACION AND BARANGAY LAG-ASAN, CITY OF BAGO, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱4.9M | 100% | High risk67 | —-0.059 |
| 24GN0005CONSTRUCTION OF DULAO-FELISA ROAD, BARANGAY DULAO AND BARANGAY FELISA, CITY OF BAGO AND CITY OF BACOLOD, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱4.9M | 100% | High risk67 | —-0.059 |
| 25GN0014CONSTRUCTION OF ROAD, BARANGAY MAILUM, CITY OF BAGO, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱4.9M | 100% | High risk66 | —-0.060 |
| 24GO0121ROAD CONSTRUCTION- CONCRETING OF FMR AT BARANGAY ALANGILAN, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱24.1M | 56% | High risk65 | Flagged0.030 |
| 23LG0072CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - TIBANBAN- LAVIGAN RD - K1780 + 600 - K1780 + 738 | Region XI | Davao Oriental 2nd DEO | On-Going | ₱95M | 98% | High risk63 | —-0.023 |
| 23LG0073CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - TIBANBAN- LAVIGAN RD - K1780 + 300 - K1780 + 380 | Region XI | Davao Oriental 2nd DEO | On-Going | ₱94.6M | 98% | High risk63 | —-0.023 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23H00053OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGMT. PROG., CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF LOBOC RIVER CONTROL STRUCTURE, TAMBANGAN SECTION (LEFT SIDE), LOAY, BOHOL | Region VII | Region VII | On-Going | ₱236.4M | 0% | High risk67 | Flagged0.033 |
| 25G00076INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG AKLAN EAST RD- K0286+071- K0290+170 | Region VI | Region VI | On-Going | ₱47.8M | 23% | High risk95 | Flagged0.032 |
| 24GO0121ROAD CONSTRUCTION- CONCRETING OF FMR AT BARANGAY ALANGILAN, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱24.1M | 56% | High risk65 | Flagged0.030 |
| 23HK0064SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SHORE PROTECTION/SEAWALL, BRGY. CAPIÑAHAN, BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 100% | High risk81 | Flagged0.013 |
| 25GO0150CONSTRUCTION OF MULTI-PURPOSE BUILDING (MASSKARA FESTIVAL FOUNDATION), BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱9.9M | 71% | High risk90 | Flagged0.012 |
| 25GO0112CONSTRUCTION OF PHILLIPPINE COAST GUARD OFFICE, BACOLOD CITY,NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱9.8M | 77% | High risk87 | Flagged0.011 |
| 25GO0092CONSTRUCTION OF DRAINAGE SYSTEM AT BRGY. FELISA, BACOLOD CITY | Negros Island Region | Bacolod City DEO | On-Going | ₱4.9M | 95% | High risk84 | Flagged0.004 |
| 25GO0083CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY CABUG, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱4.9M | 100% | High risk93 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 25GO0146CONSTRUCTION OF MULTI-PURPOSE BUILDING FOR MASSKARA FESTIVAL FOUNDATION IN BRGY. 8, BACOLOD CITY (PHASE 2) | Negros Island Region | Bacolod City DEO | On-Going | ₱14.8M | 6% | Medium risk46 | —-0.025 |
| 27 | 25GO0081CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY VISTA ALEGRE, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱4.9M | 100% | Medium risk46 | —-0.059 |
| 28 | 23GN0028CONSTRUCTION OF MULTI-PURPOSE BUILDING, PONTEVEDRA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.087 |
| 29 | 25GO0079CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TACULING, BACOLOD CITY NATIONAL HIGH SCHOOL COOP BUILDING, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.088 |
| 30 | 25GO0065CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BACOLOD CITY POLICE OFFICE (BCPO), BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱4.9M | 11% | Medium risk46 | —-0.027 |
| 31 | 25GO0134CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MANSILINGAN, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱6.4M | 40% | Medium risk45 | —-0.042 |
| 32 | 23GO0061CONSTRUCTION OF MULTI PURPOSE BUILDING - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY ALIJIS, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | Completed | ₱9.9M | 100% | Medium risk45 | —-0.088 |
| 33 | 25GO0048CONSTRUCTION OF BACOLOD CITY POLICE OFFICE, BACOLOD CITY | Negros Island Region | Bacolod City DEO | On-Going | ₱9.8M | 43% | Medium risk45 | —-0.044 |
| 34 | 24GO0094CONSTRUCTION OF MULTI-PURPOSE BUILDING (MASSKARA FESTIVAL FOUNDATION), BRGY. 8, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | Completed | ₱9.9M | 100% | Medium risk45 | —-0.086 |
| 35 | 24GO0086CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MANSILINGAN, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | Completed | ₱12.4M | 100% | Medium risk45 | —-0.087 |
| 36 | 22HK0093ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM : REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS @ BAIS - KABANKALAN ROAD K0064+350-K0064+550, MABINAY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱30M | 100% | Medium risk45 | —-0.091 |
| 37 | 22GO0094CONSTRUCTION OF REVETMENT WITH FLOODWALL ALONG MAMBULOC CREEK, PHASE 2, BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱15.5M | 100% | Medium risk45 | —-0.060 |
| 38 | 24GO0046CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY ESTEFANIA, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | Completed | ₱5M | 100% | Medium risk45 | —-0.085 |
| 39 | 22GN0018CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY LAG-ASAN, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱4.9M | 100% | Medium risk45 | —-0.088 |
| 40 | 22GN0040CONSTRUCTION OF MULTI-PURPOSE BUILDING (EXCAVATION CENTER), BARANGAY CARIDAD, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱4.9M | 100% | Medium risk45 | —-0.088 |
| 41 | 22GN0024REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS: RECONSTRUCTION TO CONCRETE PAVEMENT - JCT. PALENCIA-BOY SCOUT CAMPSITE ROAD (S00184NR), K0058+725-K0059+000, K0059+312-K0060+000, K0061+000-K0061+200, LA CARLOTA CITY, NEGROS | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱28.1M | 100% | Medium risk45 | —-0.090 |
| 42 | 23GN0068CONSTRUCTION OF MULTI-PURPOSE BUILDING, MUNICIPALITY OF SAN ENRIQUE, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱5.1M | 100% | Medium risk45 | —-0.086 |
| 43 | 25GO0054CONSTRUCTION OF ROAD, BARANGAY FELISA, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱10.3M | 42% | Medium risk44 | —-0.055 |
| 44 | 24GO0027REHABILITATION OF ROAD, BRGY. BATA, PHASE 3, BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.092 |
| 45 | 24GN0050CONSTRUCTION OF TABAO-BAYBAY, SAN ENRIQUE TO VALLADOLID ROAD, BARANGAY TABAO-BAYBAY, MUNICIPALITY OF SAN ENRIQUE AND MUNICIPALITY OF VALLADOLID, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱8.8M | 100% | Medium risk44 | —-0.062 |
| 46 | 23GN0013CONSTRUCTION OF GUINTURILAN - BATUAN (VALLADOLID) - BATUAN (LA CARLOTA) ROAD, BARANGAY GUINTURILAN, BARANGAY BATUAN (VALLADOLID), AND BARANGAY BATUAN (LA CARLOTA), MUNICIPALITY OF SAN ENRIQUE, MUNICIPALITY OF VALLADOLID, AND CITY OF LA CARLOTA, NEGROS OC | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.087 |
| 47 | 22GN0037CONSTRUCTION OF ROAD LEADING TO SAN ENRIQUE NATIONAL HIGH SCHOOL, BARANGAY TABAO-BAYBAY, MUNICIPALITY OF SAN ENRIQUE, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.091 |
| 48 | 24GL0102CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY CARABALAN (CULBAN), HIMAMAYLAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱5.6M | 100% | Medium risk43 | —-0.086 |
| 49 | 22CN0174REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, BALER - CASIGURAN RD (BALER - DINADIAWAN), K0276 + 400 - K0276 + 425 | Region III | Aurora DEO | Completed | ₱57.9M | 100% | Medium risk41 | —-0.095 |
| 50 | 21GK0242CONCRETING OF FARM-TO-MILL ROAD - NATIONAL HIGHWAY (SEVERINO) SITIO TILAPAS - SAN VICENTE, BRGY. BULANON, SAGAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱4.8M | 100% | Medium risk41 | —-0.042 |