Contractor dossier
179 projects on file, including joint ventures this contractor is part of.
Total projects
179
Total budget
₱20.7B
Average progress
86.4%
Completion rate
67.0%
Below 70%
Average risk score
62.1
High risk on average, out of 100
Flagged as unusual
25
14.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 59 | ₱6B | 61.8 | 9 | 86.9% |
| Cordillera Administrative Region | 47 | ₱6.4B | 58.1 | 0 | 100.0% |
| Region I | 35 | ₱4B | 59.7 | 6 | 93.1% |
| Region IV-B | 32 | ₱3.8B | 69.0 | 8 | 61.1% |
| Region VII | 5 | ₱481M | 79.4 | 2 | 65.4% |
| Region XIII | 1 | ₱66.8M | 43.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 98 | ₱11.2B | 58.7 | 9 | 87.9% |
| Flood Control and Drainage | 64 | ₱7.7B | 60.2 | 4 | 89.7% |
| GAA 2025 OO-2 | 6 | ₱572.9M | 92.2 | 3 | 52.3% |
| GAA 2025 SSP | 5 | ₱433.3M | 95.2 | 5 | 54.6% |
| OTHER | 3 | ₱579M | 79.0 | 3 | 99.3% |
| GAA 2025 OO-1 | 2 | ₱134.7M | 92.1 | 1 | 61.5% |
| Bridges | 1 | ₱96.5M | 63.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25ED0041CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CAMANSIHAN, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱96.2M | 87% | High risk95 | Flagged0.018 |
| 25ED0015CONSTRUCTION OF ROAD DIKE, BARANGAY BAGONG BUHAY, NAUJAN, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱95M | 71% | High risk95 | Flagged0.023 |
| 25ED0043CONSTRUCTION OF ROAD DIKE ALONG BAGTU RIVER, BARANGAY ARANGIN, NAUJAN, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱109.2M | 54% | High risk95 | Flagged0.032 |
| 25ED0016CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO CAGUISIKAN, BARANGAY GUTAD, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱96.6M | 40% | High risk95 | Flagged0.031 |
| 25DP0083CSSP - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR STREETLIGHTS, BARANGAY SAN LORENZO, SAN PABLO CITY, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱36.3M | 21% | High risk95 | Flagged0.017 |
| 25DK0071ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - MARIKINA-INFANTA RD K0125+500 - K0129+847 | Region IV-A | Quezon 1st DEO | On-Going | ₱96.6M | 88% | High risk94 | —-0.006 |
| 25ED0119CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SITIO AMUGUIS, BRGY. STA. RITA, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱142.7M | 4% | High risk93 | Flagged0.021 |
| 25ED0026CONSTRUCTION OF FLOOD CONTROL STRUCTURE, LONGOS BRIDGE 1ST APPROACH, DOWNSTREAM, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱95.2M | 40% | High risk93 | Flagged0.002 |
| 25HD0086ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST/MAINT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST OF FLOOD MITIGATION STRUCTURE ALONG NAGA RIVER, PACKAGE 2, LUTAC - INAMOAN (LE | Region VII | Cebu 1st DEO | On-Going | ₱72.4M | 78% | High risk92 | —-0.011 |
| 25HD0087ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST/MAINT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST OF FLOOD MITIGATION STRUCTURE ALONG NAGA RIVER, PACKAGE 3, LUTAC- INAMOAN (RIG | Region VII | Cebu 1st DEO | On-Going | ₱72.4M | 77% | High risk92 | —-0.011 |
| 25ED0120CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BRGY. STA. CRUZ, BACO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱142.7M | 27% | High risk92 | Flagged0.015 |
| 25ED0121CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BRGY. LALUD, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱47.5M | 88% | High risk90 | —-0.013 |
| 25DK0062ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - MAUBAN-TIGNOAN RD K0120+790 - K0122+000 | Region IV-A | Quezon 1st DEO | On-Going | ₱38.1M | 35% | High risk90 | Flagged0.000 |
| 24A00355SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SINUCALAN RIVER, BARANGAY TULIAO, SANTA BARBARA, PANGASINAN | Region I | Region I | Completed | ₱193M | 100% | High risk79 | Flagged0.002 |
| 24A00354SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SINUCALAN RIVER, BARANGAY DALONGUE, SANTA BARBARA, PANGASINAN | Region I | Region I | Completed | ₱193M | 100% | High risk79 | Flagged0.003 |
| 24A00298SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BORIS RIVER, PACKAGE 1, BARANGAY PARIAN - BARANGAY TORRE 1ST, MANGATAREM, PANGASINAN | Region I | Region I | On-Going | ₱193M | 98% | High risk79 | Flagged0.022 |
| 24A00518SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO PARATONG, BARANGAY POBLACION, BACNOTAN, LA UNION | Region I | Region I | On-Going | ₱144.7M | 73% | High risk77 | Flagged0.015 |
| 24HA0160CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AT BARANGAY MALAYO NORTE TO BARANGAY LORETO ALONG ABATAN RIVER, CORTES, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱96M | 35% | High risk73 | Flagged0.046 |
| 24HA0161CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRAINANGE SYSTEM CONSTRUCTION IF VIGA FLOOD CONTROL STRUCTURE PHASE 2, ANTEQUERA, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱96M | 37% | High risk73 | Flagged0.045 |
| 24DK0185ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - LUCENA- TAYABAS-LUCBAN-SAMPALOC-MAUBAN PORT RD - K0133+085 - K0138+502, K0138+760 - K0141+120 | Region IV-A | Quezon 1st DEO | On-Going | ₱144.7M | 87% | High risk73 | Flagged0.033 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24HA0160CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AT BARANGAY MALAYO NORTE TO BARANGAY LORETO ALONG ABATAN RIVER, CORTES, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱96M | 35% | High risk73 | Flagged0.046 |
| 24HA0161CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRAINANGE SYSTEM CONSTRUCTION IF VIGA FLOOD CONTROL STRUCTURE PHASE 2, ANTEQUERA, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱96M | 37% | High risk73 | Flagged0.045 |
| 24DK0186CSSP - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES, JCT. MSR-OLD ZIGZAG RD - K0153+(-579) - K0153+(-502) (LS)...K0154+000 - K0154+348 (LS) | Region IV-A | Quezon 1st DEO | On-Going | ₱117M | 40% | High risk72 | Flagged0.041 |
| 24DK0185ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - LUCENA- TAYABAS-LUCBAN-SAMPALOC-MAUBAN PORT RD - K0133+085 - K0138+502, K0138+760 - K0141+120 | Region IV-A | Quezon 1st DEO | On-Going | ₱144.7M | 87% | High risk73 | Flagged0.033 |
| 25ED0043CONSTRUCTION OF ROAD DIKE ALONG BAGTU RIVER, BARANGAY ARANGIN, NAUJAN, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱109.2M | 54% | High risk95 | Flagged0.032 |
| 24A00654CONSTRUCTION OF MISSING LINKS/ NEW ROADS, PANGASINAN-NUEVA VIZCAYA ROAD - K0213+700 - K0214+140, K0214+380 - K0214+520, K0214+710 - K0215+460, K0216+865 - K0217+160 | Region I | Region I | On-Going | ₱168.5M | 70% | High risk64 | Flagged0.032 |
| 25ED0016CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO CAGUISIKAN, BARANGAY GUTAD, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱96.6M | 40% | High risk95 | Flagged0.031 |
| 24A00653CONSTRUCTION OF MISSING LINKS/ NEW ROADS, PANGASINAN-NUEVA VIZCAYA ROAD, K0212+240 - K0213+580 | Region I | Region I | On-Going | ₱159.2M | 70% | High risk64 | Flagged0.029 |
| 24DK0182ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MAUBAN-TIGNOAN RD - K0167 + 630 - K0169 + 830 | Region IV-A | Quezon 1st DEO | On-Going | ₱93.6M | 0% | High risk65 | Flagged0.025 |
| 25ED0015CONSTRUCTION OF ROAD DIKE, BARANGAY BAGONG BUHAY, NAUJAN, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱95M | 71% | High risk95 | Flagged0.023 |
| 24A00298SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BORIS RIVER, PACKAGE 1, BARANGAY PARIAN - BARANGAY TORRE 1ST, MANGATAREM, PANGASINAN | Region I | Region I | On-Going | ₱193M | 98% | High risk79 | Flagged0.022 |
| 25ED0119CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SITIO AMUGUIS, BRGY. STA. RITA, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱142.7M | 4% | High risk93 | Flagged0.021 |
| 25ED0041CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CAMANSIHAN, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱96.2M | 87% | High risk95 | Flagged0.018 |
| 25DP0083CSSP - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR STREETLIGHTS, BARANGAY SAN LORENZO, SAN PABLO CITY, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱36.3M | 21% | High risk95 | Flagged0.017 |
| 24A00518SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO PARATONG, BARANGAY POBLACION, BACNOTAN, LA UNION | Region I | Region I | On-Going | ₱144.7M | 73% | High risk77 | Flagged0.015 |
| 25ED0120CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BRGY. STA. CRUZ, BACO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱142.7M | 27% | High risk92 | Flagged0.015 |
| 25E00202BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE/ESPLANADFE ALONG PATRICK RIVER (UPSTREAM), BRGY. SAN FRANCISCO-BRGY. PAETAN SECTION, STA. 000+668.34-STA. 001+000 ( | Region IV-B | Region IV-B | On-Going | ₱236.9M | 9% | High risk69 | Flagged0.013 |
| 24DK0184ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MAUBAN-TIGNOAN RD - K0164 + 430 - K0167 + 630 | Region IV-A | Quezon 1st DEO | On-Going | ₱140.4M | 94% | High risk69 | Flagged0.011 |
| 24DK0188ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MAUBAN-TIGNOAN RD - K0161 + 230 - K0164 + 430 | Region IV-A | Quezon 1st DEO | On-Going | ₱140.4M | 93% | High risk69 | Flagged0.011 |
| 24DK0187ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MAUBAN-TIGNOAN RD - K0159 + (-966) - K0161 + 230 | Region IV-A | Quezon 1st DEO | On-Going | ₱140.4M | 87% | High risk69 | Flagged0.010 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 25EB0099PREVENTIVE MAINTENANCE - SECONDARY ROADS - MINDORO WEST COASTAL RD (SECTION 3) (S00117MR) - K0381+751-K0382+891 | Region IV-B | Mindoro Occidental DEO | On-Going | ₱66.6M | 1% | High risk70 | —-0.002 |
| 27 | 24A00453CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL RIVERBANK STRUCTURE ALONG ALORAGAT AND ALLIED RIVERS, PACKAGE 2, BINALONAN-LAOAC, PANGASINAN | Region I | Region I | Completed | ₱48.2M | 100% | High risk70 | —-0.043 |
| 28 | 24A00452CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL RIVERBANK STRUCTURE ALONG ALORAGAT AND ALLIED RIVERS, PACKAGE 1, BINALONAN-LAOAC, PANGASINAN | Region I | Region I | Completed | ₱48.2M | 100% | High risk70 | —-0.043 |
| 29 | 24DK0184ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MAUBAN-TIGNOAN RD - K0164 + 430 - K0167 + 630 | Region IV-A | Quezon 1st DEO | On-Going | ₱140.4M | 94% | High risk69 | Flagged0.011 |
| 30 | 24DK0188ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MAUBAN-TIGNOAN RD - K0161 + 230 - K0164 + 430 | Region IV-A | Quezon 1st DEO | On-Going | ₱140.4M | 93% | High risk69 | Flagged0.011 |
| 31 | 24DK0187ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MAUBAN-TIGNOAN RD - K0159 + (-966) - K0161 + 230 | Region IV-A | Quezon 1st DEO | On-Going | ₱140.4M | 87% | High risk69 | Flagged0.010 |
| 32 | 25E00202BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE/ESPLANADFE ALONG PATRICK RIVER (UPSTREAM), BRGY. SAN FRANCISCO-BRGY. PAETAN SECTION, STA. 000+668.34-STA. 001+000 ( | Region IV-B | Region IV-B | On-Going | ₱236.9M | 9% | High risk69 | Flagged0.013 |
| 33 | 24DK0183ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - LUCENA-TAYABAS-LUCBAN-SAMPALOC-MAUBAN PORT RD - K0136+210 - K0133+085 | Region IV-A | Quezon 1st DEO | On-Going | ₱140.4M | 95% | High risk68 | Flagged0.008 |
| 34 | 24E00153SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG PAGBAHAN RIVER, PHASE 2, BRGY. SAN VICENTE, SANTA CRUZ, OC | Region IV-B | Region IV-B | Completed | ₱241.2M | 100% | High risk68 | —-0.039 |
| 35 | 24E00152SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG PAGBAHAN RIVER, PHASE 1, BRGY. SAN VICENTE, SANTA CRUZ, OC | Region IV-B | Region IV-B | Completed | ₱241.2M | 100% | High risk68 | —-0.039 |
| 36 | 23E00165SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTUCTURES/FACILITIES- CONST. OF DIKE ALONG DULANGAN RIVER, EVANGELISTA SECTION, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | Completed | ₱241.2M | 100% | High risk68 | —-0.039 |
| 37 | 23E00166SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTUCTURES/FACILITIES- CONST. OF DIKE ALONG DULANGAN RIVER, PAITAN SECTION, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | Completed | ₱241.2M | 100% | High risk68 | —-0.039 |
| 38 | 24D00185CONSTRUCTION OF REVETMENT AND OTHER IMPROVEMENTS ALONG BALUCTOT RIVER, EAST SIDE, BRGY. SALAWAG, DASMARIÑAS, CAVITE | Region IV-A | Region IV-A | On-Going | ₱241.4M | 90% | High risk68 | —-0.013 |
| 39 | 24D00184CONSTRUCTION OF REVETMENT AND OTHER IMPROVEMENTS ALONG BALUCTOT RIVER, EAST SIDE, BRGY. PALIPARAN III, DASMARIÑAS, CAVITE (PHASE I) | Region IV-A | Region IV-A | On-Going | ₱241.4M | 92% | High risk68 | —-0.014 |
| 40 | 25D00008CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, PACKAGE U, GENERAL NAKAR, QUEZON, PHASE 2 | Region IV-A | Region IV-A | On-Going | ₱188.2M | 70% | High risk68 | —-0.016 |
| 41 | 24E00154SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE ALONG PAGBAHAN RIVER, PHASE 3, BRGY. SAN VICENTE, SANTA CRUZ, OC | Region IV-B | Region IV-B | Completed | ₱183.3M | 100% | High risk68 | —-0.045 |
| 42 | 25D00010CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, PACKAGE W, GENERAL NAKAR, QUEZON | Region IV-A | Region IV-A | On-Going | ₱140.8M | 71% | High risk67 | —-0.025 |
| 43 | 24D00167CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, INFANTA, QUEZON, (PACKAGE I) | Region IV-A | Region IV-A | On-Going | ₱193M | 85% | High risk67 | —-0.014 |
| 44 | 24D00195CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, INFANTA, QUEZON (PACKAGE K) | Region IV-A | Region IV-A | On-Going | ₱188.1M | 95% | High risk67 | —-0.019 |
| 45 | 23D00140CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, INFANTA, QUEZON (PACKAGE B) | Region IV-A | Region IV-A | Completed | ₱193M | 100% | High risk67 | —-0.054 |
| 46 | 23D00139CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, INFANTA, QUEZON (PACKAGE A) | Region IV-A | Region IV-A | Completed | ₱193M | 100% | High risk67 | —-0.054 |
| 47 | 25AF0109CONST/REHAB OF FLOOD MIT. FACI W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS - CONST. OF FLOOD MIT. STRUCTURE ALONG ARINGAY RIVER BASIN, BRGY. SAN STA. CECILIA, ARINGAY, LU | Region I | La Union 2nd DEO | On-Going | ₱93.6M | 71% | High risk66 | —-0.021 |
| 48 | 24HA0001CONSTRUCTION OF TALENCERAS FLOOD CONTROL AT TALENCERAS, TUBIGON, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱144.3M | 100% | High risk66 | —-0.055 |
| 49 | 25DK0061ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MSR OLD ROUTE K0125+240 - K0125+850 | Region IV-A | Quezon 1st DEO | On-Going | ₱28.6M | 98% | High risk65 | —-0.052 |
| 50 | 24DK0182ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MAUBAN-TIGNOAN RD - K0167 + 630 - K0169 + 830 | Region IV-A | Quezon 1st DEO | On-Going | ₱93.6M | 0% | High risk65 | Flagged0.025 |