Contractor dossier
179 projects on file, including joint ventures this contractor is part of.
Total projects
179
Total budget
₱20.7B
Average progress
86.4%
Completion rate
67.0%
Below 70%
Average risk score
62.1
High risk on average, out of 100
Flagged as unusual
25
14.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 59 | ₱6B | 61.8 | 9 | 86.9% |
| Cordillera Administrative Region | 47 | ₱6.4B | 58.1 | 0 | 100.0% |
| Region I | 35 | ₱4B | 59.7 | 6 | 93.1% |
| Region IV-B | 32 | ₱3.8B | 69.0 | 8 | 61.1% |
| Region VII | 5 | ₱481M | 79.4 | 2 | 65.4% |
| Region XIII | 1 | ₱66.8M | 43.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 98 | ₱11.2B | 58.7 | 9 | 87.9% |
| Flood Control and Drainage | 64 | ₱7.7B | 60.2 | 4 | 89.7% |
| GAA 2025 OO-2 | 6 | ₱572.9M | 92.2 | 3 | 52.3% |
| GAA 2025 SSP | 5 | ₱433.3M | 95.2 | 5 | 54.6% |
| OTHER | 3 | ₱579M | 79.0 | 3 | 99.3% |
| GAA 2025 OO-1 | 2 | ₱134.7M | 92.1 | 1 | 61.5% |
| Bridges | 1 | ₱96.5M | 63.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25ED0041CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CAMANSIHAN, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱96.2M | 87% | High risk95 | Flagged0.018 |
| 25ED0015CONSTRUCTION OF ROAD DIKE, BARANGAY BAGONG BUHAY, NAUJAN, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱95M | 71% | High risk95 | Flagged0.023 |
| 25ED0043CONSTRUCTION OF ROAD DIKE ALONG BAGTU RIVER, BARANGAY ARANGIN, NAUJAN, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱109.2M | 54% | High risk95 | Flagged0.032 |
| 25ED0016CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO CAGUISIKAN, BARANGAY GUTAD, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱96.6M | 40% | High risk95 | Flagged0.031 |
| 25DP0083CSSP - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR STREETLIGHTS, BARANGAY SAN LORENZO, SAN PABLO CITY, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱36.3M | 21% | High risk95 | Flagged0.017 |
| 25DK0071ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - MARIKINA-INFANTA RD K0125+500 - K0129+847 | Region IV-A | Quezon 1st DEO | On-Going | ₱96.6M | 88% | High risk94 | —-0.006 |
| 25ED0119CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SITIO AMUGUIS, BRGY. STA. RITA, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱142.7M | 4% | High risk93 | Flagged0.021 |
| 25ED0026CONSTRUCTION OF FLOOD CONTROL STRUCTURE, LONGOS BRIDGE 1ST APPROACH, DOWNSTREAM, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱95.2M | 40% | High risk93 | Flagged0.002 |
| 25HD0086ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST/MAINT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST OF FLOOD MITIGATION STRUCTURE ALONG NAGA RIVER, PACKAGE 2, LUTAC - INAMOAN (LE | Region VII | Cebu 1st DEO | On-Going | ₱72.4M | 78% | High risk92 | —-0.011 |
| 25HD0087ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST/MAINT OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST OF FLOOD MITIGATION STRUCTURE ALONG NAGA RIVER, PACKAGE 3, LUTAC- INAMOAN (RIG | Region VII | Cebu 1st DEO | On-Going | ₱72.4M | 77% | High risk92 | —-0.011 |
| 25ED0120CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BRGY. STA. CRUZ, BACO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱142.7M | 27% | High risk92 | Flagged0.015 |
| 25ED0121CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BRGY. LALUD, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱47.5M | 88% | High risk90 | —-0.013 |
| 25DK0062ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - MAUBAN-TIGNOAN RD K0120+790 - K0122+000 | Region IV-A | Quezon 1st DEO | On-Going | ₱38.1M | 35% | High risk90 | Flagged0.000 |
| 24A00355SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SINUCALAN RIVER, BARANGAY TULIAO, SANTA BARBARA, PANGASINAN | Region I | Region I | Completed | ₱193M | 100% | High risk79 | Flagged0.002 |
| 24A00354SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SINUCALAN RIVER, BARANGAY DALONGUE, SANTA BARBARA, PANGASINAN | Region I | Region I | Completed | ₱193M | 100% | High risk79 | Flagged0.003 |
| 24A00298SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BORIS RIVER, PACKAGE 1, BARANGAY PARIAN - BARANGAY TORRE 1ST, MANGATAREM, PANGASINAN | Region I | Region I | On-Going | ₱193M | 98% | High risk79 | Flagged0.022 |
| 24A00518SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO PARATONG, BARANGAY POBLACION, BACNOTAN, LA UNION | Region I | Region I | On-Going | ₱144.7M | 73% | High risk77 | Flagged0.015 |
| 24HA0160CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AT BARANGAY MALAYO NORTE TO BARANGAY LORETO ALONG ABATAN RIVER, CORTES, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱96M | 35% | High risk73 | Flagged0.046 |
| 24HA0161CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRAINANGE SYSTEM CONSTRUCTION IF VIGA FLOOD CONTROL STRUCTURE PHASE 2, ANTEQUERA, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱96M | 37% | High risk73 | Flagged0.045 |
| 24DK0185ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - LUCENA- TAYABAS-LUCBAN-SAMPALOC-MAUBAN PORT RD - K0133+085 - K0138+502, K0138+760 - K0141+120 | Region IV-A | Quezon 1st DEO | On-Going | ₱144.7M | 87% | High risk73 | Flagged0.033 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24HA0160CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AT BARANGAY MALAYO NORTE TO BARANGAY LORETO ALONG ABATAN RIVER, CORTES, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱96M | 35% | High risk73 | Flagged0.046 |
| 24HA0161CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRAINANGE SYSTEM CONSTRUCTION IF VIGA FLOOD CONTROL STRUCTURE PHASE 2, ANTEQUERA, BOHOL | Region VII | Bohol 1st DEO | On-Going | ₱96M | 37% | High risk73 | Flagged0.045 |
| 24DK0186CSSP - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES, JCT. MSR-OLD ZIGZAG RD - K0153+(-579) - K0153+(-502) (LS)...K0154+000 - K0154+348 (LS) | Region IV-A | Quezon 1st DEO | On-Going | ₱117M | 40% | High risk72 | Flagged0.041 |
| 24DK0185ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - LUCENA- TAYABAS-LUCBAN-SAMPALOC-MAUBAN PORT RD - K0133+085 - K0138+502, K0138+760 - K0141+120 | Region IV-A | Quezon 1st DEO | On-Going | ₱144.7M | 87% | High risk73 | Flagged0.033 |
| 25ED0043CONSTRUCTION OF ROAD DIKE ALONG BAGTU RIVER, BARANGAY ARANGIN, NAUJAN, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱109.2M | 54% | High risk95 | Flagged0.032 |
| 24A00654CONSTRUCTION OF MISSING LINKS/ NEW ROADS, PANGASINAN-NUEVA VIZCAYA ROAD - K0213+700 - K0214+140, K0214+380 - K0214+520, K0214+710 - K0215+460, K0216+865 - K0217+160 | Region I | Region I | On-Going | ₱168.5M | 70% | High risk64 | Flagged0.032 |
| 25ED0016CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO CAGUISIKAN, BARANGAY GUTAD, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱96.6M | 40% | High risk95 | Flagged0.031 |
| 24A00653CONSTRUCTION OF MISSING LINKS/ NEW ROADS, PANGASINAN-NUEVA VIZCAYA ROAD, K0212+240 - K0213+580 | Region I | Region I | On-Going | ₱159.2M | 70% | High risk64 | Flagged0.029 |
| 24DK0182ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MAUBAN-TIGNOAN RD - K0167 + 630 - K0169 + 830 | Region IV-A | Quezon 1st DEO | On-Going | ₱93.6M | 0% | High risk65 | Flagged0.025 |
| 25ED0015CONSTRUCTION OF ROAD DIKE, BARANGAY BAGONG BUHAY, NAUJAN, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱95M | 71% | High risk95 | Flagged0.023 |
| 24A00298SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BORIS RIVER, PACKAGE 1, BARANGAY PARIAN - BARANGAY TORRE 1ST, MANGATAREM, PANGASINAN | Region I | Region I | On-Going | ₱193M | 98% | High risk79 | Flagged0.022 |
| 25ED0119CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SITIO AMUGUIS, BRGY. STA. RITA, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱142.7M | 4% | High risk93 | Flagged0.021 |
| 25ED0041CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CAMANSIHAN, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱96.2M | 87% | High risk95 | Flagged0.018 |
| 25DP0083CSSP - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR STREETLIGHTS, BARANGAY SAN LORENZO, SAN PABLO CITY, LAGUNA | Region IV-A | Laguna 3rd DEO | On-Going | ₱36.3M | 21% | High risk95 | Flagged0.017 |
| 24A00518SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO PARATONG, BARANGAY POBLACION, BACNOTAN, LA UNION | Region I | Region I | On-Going | ₱144.7M | 73% | High risk77 | Flagged0.015 |
| 25ED0120CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BRGY. STA. CRUZ, BACO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱142.7M | 27% | High risk92 | Flagged0.015 |
| 25E00202BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD DIKE/ESPLANADFE ALONG PATRICK RIVER (UPSTREAM), BRGY. SAN FRANCISCO-BRGY. PAETAN SECTION, STA. 000+668.34-STA. 001+000 ( | Region IV-B | Region IV-B | On-Going | ₱236.9M | 9% | High risk69 | Flagged0.013 |
| 24DK0184ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MAUBAN-TIGNOAN RD - K0164 + 430 - K0167 + 630 | Region IV-A | Quezon 1st DEO | On-Going | ₱140.4M | 94% | High risk69 | Flagged0.011 |
| 24DK0188ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MAUBAN-TIGNOAN RD - K0161 + 230 - K0164 + 430 | Region IV-A | Quezon 1st DEO | On-Going | ₱140.4M | 93% | High risk69 | Flagged0.011 |
| 24DK0187ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MAUBAN-TIGNOAN RD - K0159 + (-966) - K0161 + 230 | Region IV-A | Quezon 1st DEO | On-Going | ₱140.4M | 87% | High risk69 | Flagged0.010 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 23PA0010REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, ABRA-KALINGA ROAD-K0474+900-K0475+090 | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.073 |
| 102 | 22P00111GOV. BADO DANGWA NATIONAL ROAD - KO339+548 - KO339+706BAKUN, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱164.1M | 100% | Medium risk59 | —-0.060 |
| 103 | 23PA0046REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, ABRA-KALINGA ROAD-K0466+317-K0466+500 | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.073 |
| 104 | 23PA0035REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, ABRA-KALINGA ROAD-K0467+200-K0467+320 | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.073 |
| 105 | 23PA0045REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, ABRA-KALINGA ROAD-K0466+188-K0466+267 | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.074 |
| 106 | 23PA0044REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, ABRA-KALINGA ROAD-K0466+031-K0466+168 | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.074 |
| 107 | 22P00109GOV. BADO DANGWA NATIONAL ROAD - KO338+320 - KO338+473BAKUN, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.7M | 100% | Medium risk59 | —-0.063 |
| 108 | 23P00027ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - GOV. BADO DANGWA NATIONAL ROAD, K0328+844 - K0329+00 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱193M | 100% | Medium risk59 | —-0.050 |
| 109 | 21P00081CLUSTER: ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS GOV. BADO DANGWA NATIONAL ROAD (1) K0342 + | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱492.2M | 100% | Medium risk58 | —-0.045 |
| 110 | 24ED0068CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG PANGGALAAN RIVER, BRGY. TIGKAN, NAUJAN, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.061 |
| 111 | 23PA0043REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, ABRA-KALINGA ROAD-K0459+650-K0459+800 | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.073 |
| 112 | 23PA0041REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, ABRA-KALINGA ROAD-K0482+450-K0482+600 | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.073 |
| 113 | 23PA0042REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, ABRA-KALINGA ROAD-K0482+650-K0482+750 | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.074 |
| 114 | 21P00043ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS BENGUET - NUEVA VIZCAYA ROADKO254+(-372) - KO281+800BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱289.5M | 100% | Medium risk58 | —-0.044 |
| 115 | 23PA0037REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, ABRA-KALINGA ROAD-K0484+340-K0484+440 | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.073 |
| 116 | 23PA0039REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, ABRA-KALINGA ROAD-K0468+736-K0468+800 | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.071 |
| 117 | 23P00023ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BENGUET NUEVA VIZCAYA RD, K0283+368 - K0283+475 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱241.3M | 100% | Medium risk58 | —-0.050 |
| 118 | 23P00024ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BENGUET NUEVA VIZCAYA RD, K0283+475 - K0283+575 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱241.3M | 100% | Medium risk58 | —-0.050 |
| 119 | 23P00031ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BAGUIO - BONTOC ROAD, K0276+745 - K0276+885 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.8M | 100% | Medium risk58 | —-0.061 |
| 120 | 23PA0145REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, ABRA-KALINGA ROAD-K0489+680-K0489+800 | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.073 |
| 121 | 23PA0144REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, ABRA-KALINGA ROAD-K0489+460-K0489+630 | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.073 |
| 122 | 23PA0143REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, ABRA-KALINGA ROAD-K0488+250-K0488+450 | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.073 |
| 123 | 23PA0038REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, ABRA-KALINGA ROAD-K0487+650-K0487+800 | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.073 |
| 124 | 23PA0142REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, ABRA-KALINGA ROAD-K0488+000-K0488+200 | Cordillera Administrative Region | Abra DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.074 |
| 125 | 21P00048ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS / NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, ASIN - NANGALISAN JCT. - BAYABAS - MONGLO JCT. (SE | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱286.5M | 100% | Medium risk57 | —-0.034 |