Opening the dossier…
Opening the dossier…
Contractor dossier
87 projects on file, including joint ventures this contractor is part of.
Total projects
87
Total budget
₱3.5B
Average progress
99.2%
Completion rate
83.9%
Average risk score
56.2
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 44 | ₱1.7B | 56.3 | 0 | 99.6% |
| Flood Control and Drainage | 29 | ₱1.7B | 58.5 | 0 | 99.4% |
| Buildings and Facilities | 10 | ₱68.5M | 41.5 | 0 | 99.3% |
| GAA 2025 SSP | 2 | ₱9.9M | 86.5 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱54.9M | 91.0 | 0 | 74.5% |
| Water Provision and Storage | 1 | ₱3.3M | 39.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25KH0016CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN DE ORO RIVER, LUMBIA-UGUIABAN BY-PASS RD., SECTION 3, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱54.9M | 75% | High risk91 | —-0.016 |
| 25KL0067CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, CLAVERIA, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱4.9M | 100% | High risk88 | —-0.031 |
| 25KL0069CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TAMBOBOAN, CLAVERIA, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱4.9M | 100% | High risk85 | —-0.031 |
| 23F00122CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, LIGAO CITY, ALBAY, PHASE II, LIGAO CITY, | Region V | Region V | Completed | ₱192.9M | 100% | High risk73 | —-0.056 |
| 23F00135OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-PRIMARY ROADS-ALBAY WEST COAST ROAD,K0551+880-K0552+000,K0552+559-K0552+707.5, PIO DURAN,ALBAY | Region V | Region V | Completed | ₱144.7M | 100% | High risk72 | —-0.079 |
| 23F00064OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-PRIMARY ROADS-ALBAY WEST COAST ROAD,K0554+068-K0554+598.5,K0554+756-K0555+049.5, PIO DURAN,ALBAY | Region V | Region V | Completed | ₱144.7M | 100% | High risk72 | —-0.080 |
| 24FO0039ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BASAG RIVER CONTROL STRUCTURE, UPSTREAM OF SPILLWAY, BA | Region V | Albay 3rd DEO | Completed | ₱96.5M | 100% | High risk70 | —-0.077 |
| 24FO0038ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BASAG RIVER (UPSTREA | Region V | Albay 3rd DEO | Completed | ₱96.5M | 100% | High risk70 | —-0.077 |
| 24FO0056ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF UGSONG RIVER FLOOD CONTROL STRUCTURE (LEFT AND RIGHT | Region V | Albay 3rd DEO | Completed | ₱96.5M | 100% | High risk70 | —-0.077 |
| 24FE0023CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF TANAG-SALVACION ROAD, BARANGAY TANAG, LIBMANAN, CAMARINES | Region V | Camarines Sur 2nd DEO | On-Going | ₱138.5M | 100% | High risk68 | —-0.050 |
| 24FN0006OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF BANK PROTECTION STRUCTURE ALONG BARIT RIVER, SANTA JUSTINA SECTION, BARANGAY SANTA JUSTINA, BUHI, CAM SUR | Region V | Camarines Sur 5th DEO | Completed | ₱139.9M | 100% | High risk67 | —-0.066 |
| 24FN0007OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BARIT RIVER, SALVACION SECTION, BARANGAY SALVACION, BUHI, CAMARINES SUR | Region V | Camarines Sur 5th DEO | Completed | ₱139.9M | 100% | High risk67 | —-0.066 |
| 20FM0001ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - SAN PASCUAL - CLAVERIA ROAD, SAN PASCUAL, MASBATE. | Region V | Masbate 1st DEO | Completed | ₱18.6M | 100% | High risk67 | —-0.065 |
| 22FM0004ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - SAN FERNANDO-TALISAY ROAD - K0003+065 - K0003+209. | Region V | Masbate 1st DEO | Completed | ₱77.2M | 100% | High risk64 | —-0.091 |
| 20FM0044LOCAL PROGRAM - REHABILITATION OF ROADS SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SAN FERNANDO-TALISAY ROAD (K0003+377 - K0003+530), BRGY. PROGRESSO, SAN FERNANDO, MASBATE. | Region V | Masbate 1st DEO | Completed | ₱47.5M | 100% | High risk61 | —-0.097 |
| 20FM0046LOCAL PROGRAM - REHABILITATION OF ROADS SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SAN FERNANDO-TALISAY ROAD (K0002+927 - K0003+065), BRGY. PROGRESSO, SAN FERNANDO, MASBATE. | Region V | Masbate 1st DEO | Completed | ₱47.5M | 100% | High risk61 | —-0.097 |
| 20FM0045LOCAL PROGRAM - REHABILITATION OF ROADS SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SAN FERNANDO-TALISAY ROAD (K0002+790 - K0002+927), BRGY. PROGRESSO, SAN FERNANDO, MASBATE. | Region V | Masbate 1st DEO | Completed | ₱47.5M | 100% | High risk61 | —-0.097 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25KH0016CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN DE ORO RIVER, LUMBIA-UGUIABAN BY-PASS RD., SECTION 3, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | On-Going | ₱54.9M | 75% | High risk91 | —-0.016 |
| 2 | 25KL0067CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, CLAVERIA, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱4.9M | 100% | High risk88 | —-0.031 |
| 3 | 25KL0069CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TAMBOBOAN, CLAVERIA, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱4.9M | 100% | High risk85 | —-0.031 |
| 4 | 23F00122CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, LIGAO CITY, ALBAY, PHASE II, LIGAO CITY, | Region V | Region V | Completed | ₱192.9M | 100% | High risk73 | —-0.056 |
| 5 | 23F00135OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-PRIMARY ROADS-ALBAY WEST COAST ROAD,K0551+880-K0552+000,K0552+559-K0552+707.5, PIO DURAN,ALBAY | Region V | Region V | Completed | ₱144.7M | 100% | High risk72 | —-0.079 |
| 6 | 23F00064OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-PRIMARY ROADS-ALBAY WEST COAST ROAD,K0554+068-K0554+598.5,K0554+756-K0555+049.5, PIO DURAN,ALBAY | Region V | Region V | Completed | ₱144.7M | 100% | High risk72 | —-0.080 |
| 7 | 24FO0039ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BASAG RIVER CONTROL STRUCTURE, UPSTREAM OF SPILLWAY, BA | Region V | Albay 3rd DEO | Completed | ₱96.5M | 100% | High risk70 | —-0.077 |
| 8 | 24FO0038ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BASAG RIVER (UPSTREA | Region V | Albay 3rd DEO | Completed | ₱96.5M | 100% | High risk70 | —-0.077 |
| 9 | 24FO0056ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF UGSONG RIVER FLOOD CONTROL STRUCTURE (LEFT AND RIGHT | Region V | Albay 3rd DEO | Completed | ₱96.5M | 100% | High risk70 | —-0.077 |
| 10 | 24FE0023CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF TANAG-SALVACION ROAD, BARANGAY TANAG, LIBMANAN, CAMARINES | Region V | Camarines Sur 2nd DEO | On-Going | ₱138.5M | 100% | High risk68 | —-0.050 |
| 11 | 24FN0006OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF BANK PROTECTION STRUCTURE ALONG BARIT RIVER, SANTA JUSTINA SECTION, BARANGAY SANTA JUSTINA, BUHI, CAM SUR | Region V | Camarines Sur 5th DEO | Completed | ₱139.9M | 100% | High risk67 | —-0.066 |
| 12 | 24FN0007OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BARIT RIVER, SALVACION SECTION, BARANGAY SALVACION, BUHI, CAMARINES SUR | Region V | Camarines Sur 5th DEO | Completed | ₱139.9M | 100% | High risk67 | —-0.066 |
| 13 | 20FM0001ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - SAN PASCUAL - CLAVERIA ROAD, SAN PASCUAL, MASBATE. | Region V | Masbate 1st DEO | Completed | ₱18.6M | 100% | High risk67 | —-0.065 |
| 14 | 22FM0004ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS - SAN FERNANDO-TALISAY ROAD - K0003+065 - K0003+209. | Region V | Masbate 1st DEO | Completed | ₱77.2M | 100% | High risk64 | —-0.091 |
| 15 | 20FM0044LOCAL PROGRAM - REHABILITATION OF ROADS SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SAN FERNANDO-TALISAY ROAD (K0003+377 - K0003+530), BRGY. PROGRESSO, SAN FERNANDO, MASBATE. | Region V | Masbate 1st DEO | Completed | ₱47.5M | 100% | High risk61 | —-0.097 |
| 16 | 20FM0046LOCAL PROGRAM - REHABILITATION OF ROADS SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SAN FERNANDO-TALISAY ROAD (K0002+927 - K0003+065), BRGY. PROGRESSO, SAN FERNANDO, MASBATE. | Region V | Masbate 1st DEO | Completed | ₱47.5M | 100% | High risk61 | —-0.097 |
| 17 | 20FM0045LOCAL PROGRAM - REHABILITATION OF ROADS SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SAN FERNANDO-TALISAY ROAD (K0002+790 - K0002+927), BRGY. PROGRESSO, SAN FERNANDO, MASBATE. | Region V | Masbate 1st DEO | Completed | ₱47.5M | 100% | High risk61 | —-0.097 |
| 18 | 18FM0030CONCRETING OF DANCALAN ROAD - PHASE II. | Region V | Masbate 1st DEO | Completed | ₱47.5M | 100% | Medium risk60 | —-0.041 |
| 19 | 24KL0012CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LEFT BANK OF PUGAAN RIVER, DOWNSTREAM OF STA. ANA BRIDGE (PACKAGE 2), TAGOLOAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.069 |
| 20 | 24KL0011CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LEFT BANK OF PUGAAN RIVER, DOWNSTREAM OF STA. ANA BRIDGE, TAGOLOAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.069 |
| 21 | 22FB0044OO2 - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - UPGRADING OF RIVER BANK PROTECTION WORKS ALONG MARIAWA-TAYSAN RIVER, LEGAZPI CITY | Region V | Albay 2nd DEO | Completed | ₱48M | 100% | Medium risk59 | —-0.087 |
| 22 | 22FM0028CONVERGENCE AND SPECIAL SUPPORT PROGRAM-POBLACION-MOROCBOROCAN GUINHADAP ROAD LEADING TO SAN MIGUEL ISLAND DIVE SITE AND LIGHT HOUSE, AND OTHER TOURISM AREAS. | Region V | Masbate 1st DEO | Completed | ₱45.3M | 100% | Medium risk59 | —-0.098 |
| 23 | 24KL0003CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SAN ANTONIO RIVER (UPSTREAM OF SAN ANTONIO BRIDGE) PACKAGE 1, JASAAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.070 |
| 24 | 18FM0032CONCRETING OF SAN JOSE ROAD - PHASE II. | Region V | Masbate 1st DEO | Completed | ₱47.5M | 100% | Medium risk59 | —-0.041 |
| 25 | 24KL0004CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SAN ANTONIO RIVER (UPSTREAM OF SAN ANTONIO BRIDGE) PACKAGE 2, JASAAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.071 |