Opening the dossier…
Opening the dossier…
Contractor dossier
80 projects on file, including joint ventures this contractor is part of.
Total projects
80
Total budget
₱2.3B
Average progress
99.9%
Completion rate
97.5%
Average risk score
32.7
Medium risk on average, out of 100
Flagged as unusual
1
1.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 78 | ₱2.1B | 32.0 | 0 | 100.0% |
| Region XI | 2 | ₱182.5M | 59.9 | 1 | 96.7% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 37 | ₱1.3B | 37.4 | 1 | 99.8% |
| Buildings and Facilities | 23 | ₱88.4M | 18.7 | 0 | 100.0% |
| Flood Control and Drainage | 18 | ₱857.5M | 39.7 | 0 | 100.0% |
| Bridges | 1 | ₱6M | 52.2 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱9.8M | 34.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17CF0176NETWORK DEVELOPMENT OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE - TERTIARY, GAPAN - FORT MAGSAYSAY RD, K0105+600.90 - K0106+091, K0116+688 - K0118+725, K0118+841- K0119+850 | Region III | Nueva Ecija 2nd DEO | Completed | ₱22.2M | 100% | High risk67 | —-0.070 |
| 20CF0046ASSET PRESERVATION -REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - BANGAD FORT MAGSAYSAY ROAD, K0134+305 - K0135+650.60, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱23.4M | 100% | High risk66 | —-0.068 |
| 16CE0261OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, CABANATUAN CITY-CARMEN ROAD, KO129+570-KO130+000; KO135+542-KO135+941; KO138+000-KO141+000 | Region III | Nueva Ecija 1st DEO | Completed | ₱34.1M | 100% | High risk65 | —-0.069 |
| 17CF0064NETWORK DEVELOPMENT IMPROVEMENT/WIDENING OF NATIONAL ROAD ALONG NUEVA ECIJA-AURORA ROAD, K0120 + 474.90-K0121+597.00,K0136+748.14-K0137+827.65 | Region III | Nueva Ecija 2nd DEO | Completed | ₱31.6M | 100% | High risk65 | —-0.068 |
| 23LA0123CONSTRUCTION OF DRAINAGE STRUCTURE ALONG SURIGAO-DAVAO COASTAL ROAD (S01376MN), DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱94.8M | 99% | High risk64 | Flagged0.028 |
| 16CE0281CONSTRUCTION OF REVETMENT, BRGY. TABULAC, SAN JOSE CITY, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱27.9M | 100% | High risk64 | —-0.061 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 17CF0176NETWORK DEVELOPMENT OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE - TERTIARY, GAPAN - FORT MAGSAYSAY RD, K0105+600.90 - K0106+091, K0116+688 - K0118+725, K0118+841- K0119+850 | Region III | Nueva Ecija 2nd DEO | Completed | ₱22.2M | 100% | High risk67 | —-0.070 |
| 2 | 20CF0046ASSET PRESERVATION -REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - BANGAD FORT MAGSAYSAY ROAD, K0134+305 - K0135+650.60, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱23.4M | 100% | High risk66 | —-0.068 |
| 3 | 16CE0261OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, CABANATUAN CITY-CARMEN ROAD, KO129+570-KO130+000; KO135+542-KO135+941; KO138+000-KO141+000 | Region III | Nueva Ecija 1st DEO | Completed | ₱34.1M | 100% | High risk65 | —-0.069 |
| 4 | 17CF0064NETWORK DEVELOPMENT IMPROVEMENT/WIDENING OF NATIONAL ROAD ALONG NUEVA ECIJA-AURORA ROAD, K0120 + 474.90-K0121+597.00,K0136+748.14-K0137+827.65 | Region III | Nueva Ecija 2nd DEO | Completed | ₱31.6M | 100% | High risk65 | —-0.068 |
| 5 | 23LA0123CONSTRUCTION OF DRAINAGE STRUCTURE ALONG SURIGAO-DAVAO COASTAL ROAD (S01376MN), DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱94.8M | 99% | High risk64 | Flagged0.028 |
| 6 | 16CE0281CONSTRUCTION OF REVETMENT, BRGY. TABULAC, SAN JOSE CITY, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱27.9M | 100% | High risk64 | —-0.061 |
| 7 | 16CF0223REPAIR/MAINTENANCE OF DIGMALA RIVER FLOOD CONTROL, CALAANAN, BONGABON, NUEVA ECIJA STA. 13+900 TO STA. 14+400 | Region III | Nueva Ecija 2nd DEO | Completed | ₱16.8M | 100% | Medium risk59 | —-0.009 |
| 8 | 22CH0081REHABILITATION OF CANAL SYSTEM OF PORAC-GUMAIN RIS (PORAC RIS) GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.078 |
| 9 | 23CE0046CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG RIO CHICO RIVER (PHASE 1), BARANGAY BACAYAO, GUIMBA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.076 |
| 10 | 23LA0104SURIGAO-DAVAO COASTAL ROAD (S01376MN) K1788+819.000 - K1790+039.000, K1790+466.000 - K1791+354.000 | Region XI | Davao de Oro 1st DEO | On-Going | ₱87.7M | 94% | Medium risk55 | —-0.028 |
| 11 | 22CE0126CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABONG RIVER, BRGY. VILLAROSA (PHASE 5), LICAB, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱96.5M | 100% | Medium risk55 | —-0.076 |
| 12 | 16CE0203CONST. & MAINT. OF BRIDGES ALONG NATIONAL ROADS, REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES-SECONDARY, BALASING BR. (B03403LZ) ALONG SAN JOSE CITY-RIZAL RD. VIA PINILI-PORAIS-VILLA JOSON-STA. MONICA-PORTAL RD. | Region III | Nueva Ecija 1st DEO | Completed | ₱6M | 100% | Medium risk52 | —-0.036 |
| 13 | 24CE0129NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, GUIMBA BY-PASS (SAN ROQUE - MATURANOC ROAD) PACKAGE 2, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱95.5M | 100% | Medium risk49 | —-0.090 |
| 14 | 17CE0267CONSTRUCTION OF TWO (2) STOREY FOUR (4) CLASSROOMS, VILLA SANTOS ELEMENTARY SCHOOL, SCIENCE CITY OF MUÑOZ, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱9M | 100% | Medium risk45 | —-0.027 |
| 15 | 18CE0135NETWORK DEVELOPMENT- ROAD WIDENING - PRIMARY ROADS, DAANG MAHARLIKA (LZ) K0129+378.65 - K0129+419.50, K0129+738.50 - K0130+000.00, K0131+926.00 - K0132+467.70, K0132+914.00 - K0133+000.00, K0134+169.00 - K0134+180.00, K0143+584.00 - K0145+790.00 | Region III | Nueva Ecija 1st DEO | Completed | ₱91.7M | 100% | Medium risk42 | —-0.090 |
| 16 | 21CF0108CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - NUEVA ECIJA - AURORA RD - K0144+(-666.00) - K0145+887.00 | Region III | Nueva Ecija 2nd DEO | Completed | ₱66.2M | 100% | Medium risk39 | —-0.098 |
| 17 | 23CF0033NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - NUEVA ECIJA-AURORA RD - K0148+168.20-K0150+238.00 | Region III | Nueva Ecija 2nd DEO | Completed | ₱60.4M | 100% | Medium risk39 | —-0.098 |
| 18 | 20CF0038CONSTRUCTION OF ROAD NET ALONG LRR/SF TO MOLAVE, PHILIPPINE ARMY, FORT MAGSAYSAY, PALAYAN CITY, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱81.2M | 100% | Medium risk38 | —-0.096 |
| 19 | 23CE0059NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, GUIMBA BY-PASS (SAN ROQUE - MATURANOC ROAD), NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱86.8M | 100% | Medium risk38 | —-0.091 |
| 20 | 21CE0109NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - SAN ROQUE-BACAYAO ROAD, GUIMBA BY-PASS, PACKAGE 3, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱56.7M | 100% | Medium risk38 | —-0.099 |
| 21 | 22CC0233ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR STRATEGIC PUBLIC BUILDINGS/FACILITIES - BALAGTAS DIVERSION ROAD, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49M | 100% | Medium risk37 | —-0.099 |
| 22 | 19CE0211REHABILITATION OF FLOOD CONTROL, BRGY. PIUT, CARRANGLAN, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱49.5M | 100% | Medium risk37 | —-0.089 |
| 23 | 18CF0116REHABILITATION / IMPROVEMENT OF PAMPANGA RIVER FLOOD CONTROL, STA. 98+748.60 TO STA. 99+293.00, BRGY. PINAGBAYANAN, LAUR, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱58.8M | 100% | Medium risk36 | —-0.088 |
| 24 | 19CF0063REHABILITATION/MAJOR REPAIR OF FLOOD CONTROL STRUCTURE - REHABILITATION/IMPROVEMENT OF PAMPANGA RIVER CONTROL, BRGY. PINAGBAYANAN, LAUR, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱61.8M | 100% | Medium risk36 | —-0.084 |
| 25 | 24CF0007FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PAMPANGA RIVER, PALAYAN CITY, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱69M | 100% | Medium risk36 | —-0.085 |