Opening the dossier…
Opening the dossier…
Contractor dossier
20 projects on file, including joint ventures this contractor is part of.
Total projects
20
Total budget
₱272.5M
Average progress
98.7%
Completion rate
95.0%
Average risk score
38.7
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 19 | ₱258.1M | 39.3 | 0 | 98.7% |
| Region XII | 1 | ₱14.4M | 27.3 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 9 | ₱179.7M | 41.6 | 0 | 97.2% |
| Buildings and Facilities | 4 | ₱16.2M | 28.9 | 0 | 100.0% |
| OTHER | 3 | ₱12.8M | 57.4 | 0 | 100.0% |
| Flood Control and Drainage | 3 | ₱19.2M | 21.4 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱44.6M | 47.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 17LH0051CONCRETING OF ROADS AT CALINAN DISTRICT, TAMAYONG, CALINAN DISTRICT, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱4.9M | 100% | High risk73 | —-0.029 |
| 2 | 18LH0059ROAD CONCRETING OF CALINAN-BAGUIO NATIONAL ROAD (BAGUIO PROPER PORTION) TO WINES-TAMUGAN-TAMBOBONG ROAD TO MAGPET (NORTH COTABATO), DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱74.3M | 100% | Medium risk56 | —-0.081 |
| 3 | 17LH0050ROAD CONCRETING AND RIPRAPPING OF CANAL BARANGAY TAMAYONG, CALINAN DISTRICT, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱4M | 100% | Medium risk51 | —-0.027 |
| 4 | 18LB0103CONSTRUCTION OF DRAINAGE SYSTEM, PACKAGE 15, DAVAO CITY A)CONST. OF DRAINAGE SYSTEM, BRGY. 17-B, DAVAO CITY B)CONSTRUCTION OF DRAINAGE SYSTEM, BRGY. 20-B, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱3.9M | 100% | Medium risk49 | —-0.029 |
| 5 | 18LH0040CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD AT JCT. DAVAO-BUKIDNON ROAD (HIGHWAY TUGBOK PROPER) TO TACUNAN LEADING TO DECA WAKEBOARD INCLUDING BRIDGE, BRGY. TUGBOK, TUGBOK DISTRICT, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱44.6M | 100% | Medium risk48 | —-0.065 |
| 6 | 22LH0169CONCRETING OF SMIARC, BRGY. MANAMBULAN FMR, BRGY. MANAMBULAN, TUGBOK DISTRICT, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱15.4M | 100% | Medium risk47 | —-0.036 |
| 7 | 23LH0098CONSTRUCTION OF PUROK 6 AND 7 BARANGAY TAGLUNO FMR IN TORIL, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱14.3M | 100% | Medium risk46 | —-0.034 |
| 8 | 24LH0006REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG DAVAO-BUKIDNON RD- K1651+800-K1651+837, MARILOG DISTRICT, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱28.1M | 100% | Medium risk46 | —-0.093 |
| 9 | 22LH0132CONSTRUCTION OF ROAD, BARANGAY SIRAWAN, TORIL DISTRICT, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱7.9M | 100% | Medium risk46 | —-0.091 |
| 10 | 24LI0093CONSTRUCTION OF TEMPORARY ACCESS ROAD FOR MAYAON BRIDGE ALONG MONTEVISTA (JCT. MAYAON) - LAAK DIVERSION ROAD, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱23.4M | 75% | Medium risk46 | —-0.040 |
| 11 | 22LH0114CONSTRUCTION OF ROAD, PUROK SAN FRANCISCO TO PUROK SANTOL, BARANGAY TAGAKPAN, TUGBOK DISTRICT, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱9.5M | 100% | Medium risk46 | —-0.093 |
| 12 | 22LA0163CONSTRUCTION OF FIRING RANGE, 1001ST INFANTRY BRIGADE, BRGY. MAPAANG, MACO, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.091 |
| 13 | 22LA0168CONSTRUCTION OF MULTI-PURPOSE BUILDING, 100 1ST PA, MACO, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱4.9M | 100% | Medium risk43 | —-0.088 |
| 14 | 25MC0029CONSTRUCTION (COMPLETION) OF BANK PROTECTION AT LABUO-ALEGRIA CIS INTAKE, PRESIDENT ROXAS, COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱14.4M | 100% | Low risk27 | —-0.074 |
| 15 | 17LB0101CONC. OF ROAD & IMP OF DRAINAGE PACKAGE 28, A)CONC. OF ROAD & IMP OF DRAINAGE CANAL, ALZATE EXT P. | Region XI | Davao City DEO | Completed | ₱3.8M | 100% | Low risk22 | —-0.054 |
| 16 | 18LB0008OFF-CARRIAGEWAY IMPROVEMENT): SHOULDER PAVING/CONSTRUCTION, DAVAO-COTABATO ROAD (DAVAO CITY -JCT. DIGOS SECT.) K1520+060-K1520+909 | Region XI | Davao City DEO | Completed | ₱2.9M | 100% | Low risk20 | —-0.091 |
| 17 | 18LB0186CONSTRUCTION OF DRAINAGE SYSTEM, BRGY.29-C, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱2.9M | 100% | Low risk19 | —-0.076 |
| 18 | 18LB0185CONSTRUCTION OF DRAINAGE SYSTEM, BRGY.11-B, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱1.9M | 100% | Low risk18 | —-0.076 |
| 19 | 17LB0071REPAIR/REHAB OF MPB, PACKAGE 11, DAVAO CITY A)REPAIR/REHAB OF MPB, QUEZON ES, DAVAO CITY B)REPAIR/RE | Region XI | Davao City DEO | Completed | ₱4.5M | 100% | Low risk16 | —-0.060 |
| 20 | 17LB0074REPAIR/REHAB OF MPB STA.ANA CENTRAL ES, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱1.9M | 100% | Low risk12 | —-0.059 |