Contractor dossier
131 projects on file, including joint ventures this contractor is part of.
Total projects
131
Total budget
₱6.5B
Average progress
95.3%
Completion rate
87.8%
Average risk score
42.7
Medium risk on average, out of 100
Flagged as unusual
3
2.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 131 | ₱6.5B | 42.7 | 3 | 95.3% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 55 | ₱3B | 38.6 | 0 | 92.3% |
| Flood Control and Drainage | 32 | ₱1.6B | 48.8 | 0 | 100.0% |
| Bridges | 32 | ₱1.3B | 34.2 | 1 | 96.5% |
| Buildings and Facilities | 4 | ₱24.5M | 26.2 | 0 | 100.0% |
| GAA 2025 OO-1 | 3 | ₱177.2M | 92.7 | 0 | 85.9% |
| OTHER | 3 | ₱264.6M | 83.1 | 2 | 88.1% |
| GAA 2025 SSP | 1 | ₱14.9M | 94.0 | 0 | 98.2% |
| GAA 2025 OO-2 | 1 | ₱116.4M | 91.2 | 0 | 97.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25C00046CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239-PREVENTIVE MAINTENANCE-PRIMARY ROADS AONG MAHARLIKA HIGHWAY, PROVINCE OF NUEVA ECIJA | Region III | Region III | On-Going | ₱14.9M | 98% | High risk94 | —-0.003 |
| 25CE0069REPLACEMENT OF PERMANENT WEAK BRIDGES, BARACBAC BR. (B01303LZ) ALONG JCT PINAGPANAAN-RIZAL-PANTABANGAN RD | Region III | Nueva Ecija 1st DEO | On-Going | ₱62.1M | 80% | High risk94 | —-0.004 |
| 25CE0231WIDENING OF PERMANENT BRIDGES - ILOG BALIWAG BR. (B01275LZ) ALONG NUEVA ECIJA-PANGASINAN RD | Region III | Nueva Ecija 1st DEO | On-Going | ₱95.5M | 83% | High risk94 | —-0.001 |
| 25CE0148CONSTRUCTION OF DE LEON DAM, BARANGAY BULAC, TALAVERA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱116.4M | 97% | High risk91 | —-0.012 |
| 24CE0362CONSTRUCTION OF BRIDGE, BARANGAY CAVITE TO BARANGAY STA. ANA, GUIMBA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱104.4M | 81% | High risk90 | Flagged0.053 |
| 25C00475ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS-MAHARLIKA HIGHWAY, PROVINCE OF NUEVA ECIJA | Region III | Region III | On-Going | ₱19.6M | 95% | High risk90 | —-0.010 |
| 24CE0363CONSTRUCTION OF BRIDGE, BARANGAY BALBALINO, GUIMBA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱83.7M | 83% | High risk87 | Flagged0.045 |
| 16CE0311CONSTRUCTION/REHABILITATION OF FLOOD CONTROL DIKES, PHASE II, BRGY. VILLAROSA, STA. 6+794.70-STA. 7+582.7, LICAB, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱93.1M | 100% | High risk78 | —-0.049 |
| 17CE0152CONSTRUCTION OF CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILE ALONG BALIWAG RIVER, BRGY. SALVACION 2, LUPAO, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱74.4M | 100% | High risk73 | —-0.056 |
| 17CE0154CONSTRUCTION OF CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILE ALONG PAMPANGA RIVER, BRGY. SAN GREGORIO, RIZAL, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱65.1M | 100% | High risk72 | —-0.056 |
| 17C00012ASSET PRESERVATION OF NAT'L. ROADS-REHAB/RECONST/UPGRADING OF DAMAGED PAVED NAT'L. ROADS INCL. DRAINAGE BASED ON PAVEMENT MGMT. SYSTEM/HIGHWAY DEV'T. & MGMT.-4 (HDM4) SECONDARY ROADS, NUEVA ECIJA-PANGASINAN ROAD, N.E. 1ST LEGISLATIVE DIST. PROV. OF N.E. | Region III | Region III | Terminated | ₱76.5M | 100% | High risk72 | —-0.012 |
| 17CE0155CONSTRUCTION OF CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILE ALONG BANCO RIVER, SAN ESTEBAN, RIZAL, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱55.8M | 100% | High risk72 | —-0.058 |
| 20CE0175CONSTRUCTION OF LOCAL ROADS, BARANGAY ESTACION TO BARANGAY EDY, NAMPICUAN, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱4.9M | 100% | High risk67 | —-0.063 |
| 25C00047CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGED (MVUC) AS PER R.A. 11239-REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS ALONG MAHARLIKA HIGWAY, PROV. OF NUEVA ECIJA | Region III | Region III | On-Going | ₱21.4M | 1% | High risk66 | —-0.012 |
| 25C00048CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239-REHAB./RECONST./UPGRADING OF DAMAGED PAVE ROADS-PRIMARY ROADS ALONG MAHARLIKA HIGHWAY, PROVINCE OF NUEVA ECIJA | Region III | Region III | On-Going | ₱20.2M | 2% | High risk66 | —-0.012 |
| 20CE0161CONSTRUCTION OF ROAD FROM BRGY. MAYANTOC TO BRGY. RECUERDO, NAMPICUAN, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱19M | 100% | High risk65 | —-0.064 |
| 17CE0318ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - JCT PINAGPANAAN - RIZAL - PANTABANGAN RD - K0126+000 - K0126+739.60 | Region III | Nueva Ecija 1st DEO | Completed | ₱5.2M | 100% | High risk65 | —-0.064 |
| 16CE0226REHABILITATION/IMPROVEMENT OF BANCO RIVER CONTROL, BRGY. MACAPSING, STA. 4+019-STA.4+161.80, RIZAL, | Region III | Nueva Ecija 1st DEO | Completed | ₱18.3M | 100% | High risk65 | —-0.061 |
| 16CE0283REHABILITATION/IMPROVEMENT OF PAMPANGA RIVER CONTROL, RIZAL, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱32.6M | 100% | High risk64 | —-0.059 |
| 16CE0282CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG PAMPANGA RIVER, STA. 018+000 TO STA. 018+330.80, BRGY. POBLACION NORTE, RIZAL, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱37.2M | 100% | High risk64 | —-0.060 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CE0362CONSTRUCTION OF BRIDGE, BARANGAY CAVITE TO BARANGAY STA. ANA, GUIMBA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱104.4M | 81% | High risk90 | Flagged0.053 |
| 24CE0363CONSTRUCTION OF BRIDGE, BARANGAY BALBALINO, GUIMBA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱83.7M | 83% | High risk87 | Flagged0.045 |
| 25C00238BRIDGE PROGRAM-WIDENING OF PERMANENT BRIDGES-DIGDIG BRIDGE (BO0121LZ) ALONG MAHARLIKA HIGHWAY, PROVINCE OF NUEVA ECIJA | Region III | Region III | On-Going | ₱121.2M | 0% | Medium risk55 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 22CE0054CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION NORTE, RIZAL, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱4.8M | 100% | Medium risk34 | —-0.104 |
| 77 | 24CE0161CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TALAVERA RIVER (PACKAGE 2), BARANGAY FLORIDA BLANCA, LLANERA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱47.8M | 100% | Medium risk34 | —-0.090 |
| 78 | 24CE0280CONSTRUCTION OF BRIDGE, BARANGAY COMITANG, STO DOMINGO TO BARANGAY CULONG, GUIMBA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱48.5M | 100% | Medium risk34 | —-0.065 |
| 79 | 23CE0058ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, JCT PINAGPANAAN-RIZAL-PANTABANGAN RD K0162+115 - K0162+215 | Region III | Nueva Ecija 1st DEO | Completed | ₱32.7M | 100% | Medium risk34 | —-0.103 |
| 80 | 18CE0050ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - JCT PINAGPANAAN - RIZAL - PANTABANGAN RD K0134+375 - K0135+000, K0152+279 - K0152+872, K0160+000 - K0161+000, K0162+000 - K0163+000, K0166+662 - K0166+779, K0167+000 - K0167+224, K0173+000 - K | Region III | Nueva Ecija 1st DEO | Completed | ₱32.2M | 100% | Medium risk34 | —-0.102 |
| 81 | 22CE0082CONSTRUCTION OF BRIDGE, BRGY. SAN JOSE, LICAB, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱49M | 100% | Medium risk34 | —-0.064 |
| 82 | 24C00555BRIDGE PROGRAM-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-CAPINTALAN BRIDGE-2 (BO1983LZ) AND TAYABO BRIDGE (BO1969LZ) ALONG DAANG MAHARLIKA (LZ) PROVINCE OF NUEVA ECIJA | Region III | Region III | Completed | ₱19.1M | 100% | Medium risk34 | —-0.065 |
| 83 | 22CE0107CONSTRUCTION OF BRIDGE, BRGY. BACAYAO, GUIMBA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱48.9M | 100% | Medium risk34 | —-0.063 |
| 84 | 25CE0147CONSTRUCTION OF BRIDGE, BARANGAY COMITANG, STO. DOMINGO TO BARANGAY CULONG, GUIMBA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱49.5M | 100% | Medium risk33 | —-0.063 |
| 85 | 18CE0049ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - BONGABON - RIZAL - AURORA RD K0148+(-335) - K0149+000, K0149+000 - K0149+230, K0150+521 - K0151+540 | Region III | Nueva Ecija 1st DEO | Completed | ₱34M | 100% | Medium risk33 | —-0.101 |
| 86 | 22CE0085CONSTRUCTION OF FLOOD CONTROL STRUCTURE IN DIGDIG (TALAVERA RIVER), TRAVERSING BRGYS. A. BONIFACIO NORTE TO A. BONIFACIO SUR, LLANERA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱43.2M | 100% | Medium risk33 | —-0.089 |
| 87 | 24CE0216ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, CABANATUAN CITY - CARMEN RD - K0129+(-976) - K0129+(-228) | Region III | Nueva Ecija 1st DEO | Completed | ₱37.5M | 100% | Medium risk33 | —-0.103 |
| 88 | 20CE0090WIDENING OF PERMANENT BRIDGES CAMBITALA BR. (B01302LZ) ALONG JCT PINAGPANAAN - RIZAL - PANTABANGAN RD | Region III | Nueva Ecija 1st DEO | Completed | ₱11.8M | 100% | Medium risk33 | —-0.065 |
| 89 | 20CE0094WIDENING OF PERMANENT BRIDGES DIBULO BR. (B01301LZ) ALONG JCT PINAGPANAAN - RIZAL - PANTABANGAN RD | Region III | Nueva Ecija 1st DEO | Completed | ₱14.7M | 100% | Medium risk33 | —-0.065 |
| 90 | 25CE0258ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS, JCT PINAGPANAAN-RIZAL-PANTABANGAN RD - K0146 + 000 - K0147 + 410, K0147 + 632 - K0148 + 010 | Region III | Nueva Ecija 1st DEO | Completed | ₱19M | 100% | Medium risk33 | —-0.102 |
| 91 | 25CE0257ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS, JCT PINAGPANAAN-RIZAL-PANTABANGAN RD - K0141 + 565 - K0142 + 050, K0142 + 277 - K0143 + 438 | Region III | Nueva Ecija 1st DEO | Completed | ₱23.3M | 100% | Medium risk33 | —-0.102 |
| 92 | 24CE0215ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, CABANATUAN CITY - CARMEN RD - K0130+508 - K0131+000, K0131+050 - K0132+000 | Region III | Nueva Ecija 1st DEO | Completed | ₱35.6M | 100% | Medium risk32 | —-0.103 |
| 93 | 23CE0211REHABILITATION/RECONSTRUCTION OF CALAOCAN BRIDGE (B04959LZ), BONGABON-RIZAL-AURORA ROAD K153+370, BARANGAY CALAOCAN, RIZAL, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱20.7M | 100% | Medium risk32 | —-0.065 |
| 94 | 24CE0172ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS, STA ROSA - TARLAC RD - K0119+667 - K0119+742, K0119+887 - K0120+191, K0123+000 - K0123+369, K0123+415 - K0123+550, K0123+692 - K0123+720, K0126+00 | Region III | Nueva Ecija 1st DEO | Completed | ₱39.8M | 100% | Medium risk32 | —-0.104 |
| 95 | 25CE0255ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS, JCT PINAGPANAAN-RIZAL-PANTABANGAN RD - K0132 + 578 - K0133 + 000, K0134 + 000 - K0135 + 000 | Region III | Nueva Ecija 1st DEO | Completed | ₱19.9M | 100% | Medium risk32 | —-0.104 |
| 96 | 21CE0093ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - JCT PINAGPANAAN-RIZAL-PANTABANGAN RD - K0151+488 - K0152+000, K0157+911 - K0159+000, K0169+360 - K0169+745 | Region III | Nueva Ecija 1st DEO | Completed | ₱17.1M | 100% | Medium risk32 | —-0.102 |
| 97 | 19CE0016ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - MUÑOZ - LUPAO RD K0146+534 - K0147+326, K0148+300 - K0149+000, K0153+156.25 - K0153+455, K0154+746 - K0155+000 | Region III | Nueva Ecija 1st DEO | Completed | ₱16.1M | 100% | Medium risk32 | —-0.100 |
| 98 | 18CE0058ASSET PRESERVATION - PREVENTIVE MAINTENANCE TERTIARY ROADS JCT PINAGPANAAN - RIZAL - PANTABANGAN RD K0126+739.60 - K0127+642, K0129+485 - K0132+458 | Region III | Nueva Ecija 1st DEO | Completed | ₱24.7M | 100% | Medium risk32 | —-0.104 |
| 99 | 19CE0014ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - BONGABON - RIZAL - AURORA RD K0149+230 - K0150+521, K0152+122.50 - K0152+560, K153+446 - K0153+718, K0153+1000 - K0153+1379 | Region III | Nueva Ecija 1st DEO | Completed | ₱16.2M | 100% | Medium risk32 | —-0.101 |
| 100 | 19CE0244CONCRETING OF BRGY. BUCOT - BRGY. BIBICLAT FMR, BRGY. BUCOT AND BRGY. BIBICLAT, ALIAGA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱16.1M | 100% | Medium risk32 | —-0.040 |