Opening the dossier…
Opening the dossier…
Contractor dossier
604 projects on file, including joint ventures this contractor is part of.
Total projects
604
Total budget
₱19.5B
Average progress
96.2%
Completion rate
90.2%
Average risk score
36.3
Medium risk on average, out of 100
Flagged as unusual
9
1.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 177 | ₱2.1B | 18.5 | 0 | 100.0% |
| National Capital Region | 153 | ₱3B | 38.9 | 0 | 99.1% |
| Region IV-A | 106 | ₱4.4B | 47.0 | 3 | 89.4% |
| Region XI | 69 | ₱1.6B | 32.3 | 0 | 100.0% |
| Region I | 39 | ₱2.3B | 53.1 | 1 | 89.7% |
| Region IV-B | 19 | ₱2.7B | 55.5 | 1 | 93.7% |
| Region IX | 13 | ₱1.2B | 63.6 | 0 | 86.9% |
| Region VIII | 11 | ₱991.6M | 58.1 | 2 | 83.8% |
| Region VI | 5 | ₱350M | 64.5 | 2 | 83.0% |
| Region II | 5 | ₱221.6M | 47.6 | 0 | 100.0% |
| Region VII | 2 | ₱105.8M | 52.3 | 0 | 100.0% |
| Region XII | 2 | ₱147.5M | 29.8 | 0 | 94.8% |
| Region V | 1 | ₱145.8M | 69.5 | 0 | 29.2% |
| Region X | 1 | ₱198M | 59.6 | 0 | 100.0% |
| Negros Island Region | 1 | ₱96.5M | 57.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 232 | ₱2.7B | 26.8 | 1 | 98.6% |
| Roads | 205 | ₱8B | 38.8 | 1 | 95.6% |
| Flood Control and Drainage | 138 | ₱7.8B | 47.2 | 3 | 93.7% |
| Bridges | 13 | ₱89.2M | 32.0 | 0 | 100.0% |
| Water Provision and Storage | 7 | ₱26.7M | 23.6 | 0 | 100.0% |
| OTHER | 6 | ₱353.8M | 70.3 | 2 | 89.0% |
| GAA 2025 OO-1 | 1 | ₱241.2M | 94.8 | 1 | 57.4% |
| GAA 2025 OO-2 | 1 | ₱119.4M | 93.7 | 1 | 85.0% |
| Bridges, Roads | 1 | ₱107.4M | 62.2 | 0 | 37.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25I00081NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TACLOBAN - STA. FE - SAN MIGUEL ROAD, PACKAGE 2, LEYTE | Region VIII | Region VIII | On-Going | ₱241.2M | 57% | High risk95 | Flagged0.034 |
| 25GJ0017CONSTRUCTION OF FLOOD MITIGATION STRUCTURES - WATERWAYS REHABILITATION AND COASTAL PROTECTION, SECTION 2, ILOILO CITY, ILOILO | Region VI | Iloilo City DEO | On-Going | ₱119.4M | 85% | High risk94 | Flagged0.001 |
| 24GA0247CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG MALINAO RIVER, BARANGAY BANAYBANAY, MALINAO, AKLAN | Region VI | Aklan DEO | On-Going | ₱78.3M | 30% | High risk79 | Flagged0.057 |
| 24CC0424CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY BALUBAD, BULAKAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱72.4M | 100% | High risk76 | —-0.029 |
| 22DI0108REHABILITATION OF ROAD AND DRAINAGE, BINAN CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱94.7M | 79% | High risk76 | Flagged0.018 |
| 22D00106CONSTRUCTION OF SLOPE PROTECTION STRUCTURE USING ROCK NETTING ALONGLAIYA - MALABRIGO ROAD, SITIO NATUNGKAD - SITIO BIGA, BRGY. HUGOM,SAN JUAN, BATANGAS | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk75 | —-0.019 |
| 25J00016CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER (UPSTREAM), PACKAGE 6, SIOCON, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱149.5M | 41% | High risk75 | —-0.004 |
| 22J00065CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - ISABELA URBAN DRAINAGE | Region IX | Region IX | On-Going | ₱110.8M | 80% | High risk73 | —-0.001 |
| 23I00222CONSTRUCTION OF SUBANG DAKU FLOOD CONTROL, SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱94.5M | 94% | High risk72 | Flagged0.033 |
| 24JJ0008PREVENTIVE MAINTENANCE - SECONDARY ROADS, SIOCON- SIRAWAI- SIBUCO- LIMPAPA RD- K2098 + 000 - K2102 + 300 | Region IX | Zamboanga del Norte 4th DEO | On-Going | ₱118.9M | 97% | High risk71 | —-0.032 |
| 24A00042CONSTRUCTION OF MISSING LINKS/ NEW ROADS, PIDDIG-CARASI (ILOCOS NORTE) - CALANASAN (APAYAO) CONNECTING CABUGAO-CONNER (APAYAO) - TUAO (CAGAYAN) ROAD, ILOCOS NORTE (PACKAGE 5) | Region I | Region I | On-Going | ₱154.4M | 82% | High risk71 | —-0.019 |
| 22CA0083CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF NEW ROAD CURING A | Region III | Bataan 1st DEO | Completed | ₱76.5M | 100% | High risk71 | —-0.036 |
| 23AA0129CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BISLAK RIVER, BRGY. SAN RAMON, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱62.7M | 100% | High risk70 | —-0.063 |
| 23AA0160CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -REHABILITATION OF DAMAGED CONCRETE BANK REVETMENT AND BRIDGE APPROACH, BISLAK RIVER REVETMENT, BARANGAY TAMDAGAN, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱47M | 75% | High risk70 | —-0.010 |
| 25D00122PREVENTIVE MAINTENANCE - PRIMARY ROADS MAHARLIKA HIGHWAY (MANILA SOUTH ROAD) - K0033 + 742 - K0034 + 120, K0034 + 914 - K0035 + 000 | Region IV-A | Region IV-A | On-Going | ₱55M | 16% | High risk70 | —-0.024 |
| 20DI0138CONCRETING OF ACCESS ROAD AND IMPROVEMENT OF DRAINAGE, BRGY. SANTO NINO AND CANLALAY, BIÑAN, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱9.9M | 100% | High risk70 | —-0.042 |
| 23AA0149CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF WATERWAY STRUCTURE ALONG BANBAN RIVER, BARANGAY BANBAN AND DADAOR, BANGUI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱19.6M | 100% | High risk70 | —-0.064 |
| 23AA0150CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BOLO RIVER, BARANGAY MALASIN TO BARANGAY NAGBALAGAN (SITIO BAGO), BANGUI, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱18.8M | 100% | High risk70 | —-0.064 |
| 23A00236REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS, MANILA NORTH RD - K0576+196-K0576+326 (RS), K0576+590-K0576+636 (RS), K0576+1137-K0576+1173 (RS) | Region I | Region I | Completed | ₱159.2M | 100% | High risk70 | —-0.055 |
| 24F00114CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF DAET-SAN VICENTE-SAN LOR | Region V | Region V | On-Going | ₱145.8M | 29% | High risk69 | —-0.028 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24GA0247CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG MALINAO RIVER, BARANGAY BANAYBANAY, MALINAO, AKLAN | Region VI | Aklan DEO | On-Going | ₱78.3M | 30% | High risk79 | Flagged0.057 |
| 25I00081NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TACLOBAN - STA. FE - SAN MIGUEL ROAD, PACKAGE 2, LEYTE | Region VIII | Region VIII | On-Going | ₱241.2M | 57% | High risk95 | Flagged0.034 |
| 18DI0139NETWORK DEVELOPMENT PROGRAM -CONSTRUCTION OF BY- PASS AND DIVERSION ROADS, SAN JOSE -BUCAL DIVERSION ROAD, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱23.3M | 55% | High risk69 | Flagged0.033 |
| 23I00222CONSTRUCTION OF SUBANG DAKU FLOOD CONTROL, SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱94.5M | 94% | High risk72 | Flagged0.033 |
| 22DI0108REHABILITATION OF ROAD AND DRAINAGE, BINAN CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱94.7M | 79% | High risk76 | Flagged0.018 |
| 24DK0180CAPITAL OUTLAY - CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING ... - CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, BARANGAY DAPDAP, TAYABAS CITY, QUEZON | Region IV-A | Quezon 1st DEO | On-Going | ₱47.3M | 19% | Medium risk54 | Flagged0.013 |
| 22E00072CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS)- CONST. OF PNP BUILDING, MAMBURAO, OCCIDENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱37.5M | 56% | High risk65 | Flagged0.005 |
| 25GJ0017CONSTRUCTION OF FLOOD MITIGATION STRUCTURES - WATERWAYS REHABILITATION AND COASTAL PROTECTION, SECTION 2, ILOILO CITY, ILOILO | Region VI | Iloilo City DEO | On-Going | ₱119.4M | 85% | High risk94 | Flagged0.001 |
| 25A00094CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTOL-SAN GABRIEL-KAPANGAN ROAD, MALUYO RIVER, BARANGAY MANGAAN, SANTOL LA UNION | Region I | Region I | On-Going | ₱146.3M | 35% | High risk62 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 23E00185SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTUCTURES/FACILITIES- CONST. OF CABULUAN RIVER FLOOD STRUCTURE, BRGY. CALATEGAS, NARRA, PALAWAN | Region IV-B | Region IV-B | Completed | ₱193M | 100% | High risk66 | —-0.017 |
| 27 | 23IM0125CONSTRUCTION OF MULTI-PURPOSE BUILDING FOR THE INTEGRATED BAR OF THE PHILIPPINES, LEYTE CHAPTER, TACLOBAN CITY | Region VIII | Tacloban City DEO | On-Going | ₱96.5M | 25% | High risk66 | —-0.011 |
| 28 | 21AA0123CONCRETING OF BRGY. PASALENG FMR, BRGY. PASALENG, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | Completed | ₱23.3M | 100% | High risk65 | —-0.026 |
| 29 | 25I00031NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TACLOBAN - STA. FE - SAN MIGUEL ROAD, PACKAGE 3, LEYTE 1ST LD | Region VIII | Region VIII | On-Going | ₱284.4M | 53% | High risk65 | —-0.011 |
| 30 | 25D00096CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ALAMINOS-SAN PABLO CITY BYPASS ROAD, LAGUNA | Region IV-A | Region IV-A | On-Going | ₱142.3M | 0% | High risk65 | —-0.026 |
| 31 | 22D00046CONSTRUCTION OF DPWH REGION IV-A OFFICE, BARANGAY MAYAPA, CALAMBA CITY, LAGUNA | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk65 | —-0.063 |
| 32 | 23E00199SUSTAINABLE INFRASTUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF CAUSEWAY FOR TOURISM ALONG AMBULONG PORT, MAGDIWANG, SIBUYAN ISLAND, ROMBLON | Region IV-B | Region IV-B | Completed | ₱289.5M | 100% | High risk65 | —-0.034 |
| 33 | 23E00203SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD & CAUSEWAY FOR TOURISM ALONG SABLAYAN PORT, ROMBLON, ROMBLON | Region IV-B | Region IV-B | Completed | ₱289.5M | 100% | High risk65 | —-0.035 |
| 34 | 22DI0082CONSTRUCTION OF SHORE PROTECTION ALONG BINAN CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱94.4M | 84% | High risk65 | —-0.016 |
| 35 | 25DI0036REHABILITATION OF BANK STRUCTURE ALONG BINAN RIVER, PHASE 3, BINAN CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱94.2M | 52% | High risk65 | —-0.030 |
| 36 | 25DI0035REHABILITATION OF BANK STRUCTURE ALONG BINAN RIVER, PHASE 2, BINAN CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱93.8M | 63% | High risk65 | —-0.031 |
| 37 | 25DI0034REHABILITATION OF BANK STRUCTURE ALONG BINAN RIVER, PHASE 1, BINAN CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱94M | 82% | High risk65 | —-0.040 |
| 38 | 23DI0047CONSTRUCTION OF FLOOD PROTECTION STRUCTURE PHASE 2, (BINAN-STA.ROSA BOUNDARY), BINAN SIDE, BINAN CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱93.8M | 100% | High risk65 | —-0.075 |
| 39 | 22DI0081CONSTRUCTION OF RIVER PROTECTION ALONG BINAN RIVER, BRGY. DE LA PAZ, BINAN CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱93.4M | 100% | High risk65 | —-0.078 |
| 40 | 23E00184SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF RIVERBANK PROTECTION STRUCTURES- RANSANG RIVER (BOTH SIDES) WITH SHEET PILES | Region IV-B | Region IV-B | Completed | ₱193M | 100% | High risk65 | —-0.015 |
| 41 | 22D00015FY 2022 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BY-PASS AND DIVERSION ROADS LIPA CITY - PADRE GARCIA DIVERSION ROAD, PACKAGE J, BATANGAS | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk65 | —-0.074 |
| 42 | 19D00039PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION / IMPROVEMENT OF SAN PEDRO RIVER CONTROL, BRGY. GSIS, SAN PEDRO, LAGUNA | Region IV-A | Region IV-A | Completed | ₱93.1M | 100% | High risk65 | —-0.078 |
| 43 | 23OF0091PREVENTIVE MAINTENANCE - SECONDARY ROADS - COMMONWEALTH AVE - K0017 + 500 - K0020 + 382, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱169.7M | 100% | High risk65 | —-0.070 |
| 44 | 22E00072CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS)- CONST. OF PNP BUILDING, MAMBURAO, OCCIDENTAL MINDORO | Region IV-B | Region IV-B | On-Going | ₱37.5M | 56% | High risk65 | Flagged0.005 |
| 45 | 22LE0037CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO BALUT ISLAND CIRCUMFERENTIAL ROAD, SARANGANI, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱144.8M | 100% | High risk64 | —-0.061 |
| 46 | 25DI0138CONSTRUCTION OF FLOOD PROTECTION STRUCTURE PHASE 4 (BINAN-CARMONA BOUNDARY), BINAN SIDE, BINAN CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱96.2M | 1% | High risk64 | —-0.018 |
| 47 | 22OE0035CONSTRUCTION DRAINAGE STRUCTURES ALONG A. MACEDA ST. INCLUDING ITS TRIBUTARIES, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.067 |
| 48 | 22J00104ROAD WIDENING - SECONDARY ROADS ROMANDIER - CAMP ANDRES - TANDUH BATO ROAD | Region IX | Region IX | Completed | ₱157.9M | 100% | High risk64 | —-0.049 |
| 49 | 23E00081SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF RIVER BANK PROTECTION WORKS ALONG CULANDANUM RIVER, BATARAZA, PALAWAN | Region IV-B | Region IV-B | Completed | ₱193M | 100% | High risk64 | —-0.009 |
| 50 | 23J00116ROAD WIDENING - SECONDARY ROADS - ROMANDIER - CAMP ANDRES - TANDUH BATO (SO0022SL) | Region IX | Region IX | Completed | ₱171.6M | 100% | High risk63 | —-0.046 |