Opening the dossier…
Opening the dossier…
Contractor dossier
903 projects on file, including joint ventures this contractor is part of.
Total projects
903
Total budget
₱45.5B
Average progress
97.3%
Completion rate
91.9%
Average risk score
45.4
Medium risk on average, out of 100
Flagged as unusual
16
1.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 218 | ₱10.4B | 48.8 | 1 | 95.9% |
| Region IV-A | 130 | ₱6.5B | 51.1 | 1 | 97.4% |
| Region IV-B | 130 | ₱5.3B | 32.8 | 4 | 98.6% |
| Region III | 104 | ₱4.4B | 35.8 | 1 | 97.4% |
| Region XI | 96 | ₱4.6B | 40.8 | 1 | 100.0% |
| Cordillera Administrative Region | 54 | ₱3.3B | 53.5 | 0 | 100.0% |
| Region I | 35 | ₱2.3B | 51.2 | 2 | 96.8% |
| Region VI | 31 | ₱1.8B | 51.6 | 0 | 95.8% |
| Region IX | 30 | ₱2.6B | 65.3 | 1 | 98.8% |
| Region VIII | 18 | ₱1.1B | 52.5 | 1 | 99.7% |
| Region II | 18 | ₱406M | 42.1 | 0 | 100.0% |
| Region XII | 12 | ₱692.1M | 31.1 | 0 | 95.1% |
| Region X | 11 | ₱266.1M | 36.5 | 1 | 96.7% |
| Region V | 9 | ₱1.3B | 68.8 | 1 | 69.8% |
| Negros Island Region | 4 | ₱312.4M | 60.7 | 1 | 84.6% |
| Central Office | 1 | ₱96.5M | 73.5 | 0 | 100.0% |
| Region VII | 1 | ₱94.5M | 64.2 | 1 | 30.6% |
| Region XIII | 1 | ₱48.2M | 38.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 384 | ₱23B | 49.5 | 4 | 96.9% |
| Buildings and Facilities | 279 | ₱7.3B | 35.0 | 3 | 98.2% |
| Roads | 208 | ₱13.2B | 48.9 | 4 | 98.1% |
| OTHER | 18 | ₱1.1B | 66.2 | 1 | 100.0% |
| Bridges | 10 | ₱706.8M | 52.6 | 3 | 60.5% |
| Bridges, Roads | 2 | ₱102.8M | 50.0 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱83.8M | 95.2 | 1 | 96.8% |
| GAA 2025 OO-1 | 1 | ₱55.3M | 94.3 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25JJ0028PREVENTIVE MAINTENANCE - SECONDARY ROADS ALONG SIOCON-SIRAWAI-SIBUCO-LIMPAPA RD -(S01151MN) CHAINAGE 23548 - CHAINAGE 24284, CHAINAGE 24608 - CHAINAGE 26765, CHAINAGE 26793 - CHAINAGE 29000 | Region IX | Zamboanga del Norte 4th DEO | On-Going | ₱83.8M | 97% | High risk95 | Flagged0.020 |
| 25JJ0001PREVENTIVE MAINTENANCE - SECONDARY ROADS, ZAMBOANGA WEST COASTAL RD (SIBUCO-LIMPAPA SECTION) - (S01152MN) CHAINAGE 5761 - CHAINAGE 9030 | Region IX | Zamboanga del Norte 4th DEO | On-Going | ₱55.3M | 100% | High risk94 | —-0.001 |
| 23HK0069SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SHORE PROTECTION/SEAWALL, BRGY. OKIOT, BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 100% | High risk81 | Flagged0.011 |
| 24CC0400CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GUIGUINTO RIVER AT BARANGAY MALIS-POBLACION-ILANG-ILANG, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱217.1M | 100% | High risk81 | —-0.028 |
| 24F00492ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-LIGAO-PIO DURAN RD-K0520+000-K0520+540, LIGAO CITY, ALBAY (3RD LEGISLATIVE D | Region V | Region V | On-Going | ₱235.5M | 31% | High risk78 | Flagged0.033 |
| 24CC0371CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, SABANG SECTION, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱77.2M | 41% | High risk76 | —-0.008 |
| 23J00073CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MANICAHAN RIVER, MANICAHAN BR. SECTION (B00574MN) ALONG PAGADIAN CITY - ZAMBOANGA CITY ROAD (S01315MN), BARANGAY MANICAHAN, ZAMBOA | Region IX | Region IX | On-Going | ₱96.5M | 91% | High risk74 | —-0.011 |
| 25CG0020SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF SAN ESTEBAN BRIDGE, PHASE III, MACABEBE, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱137.4M | 34% | High risk74 | Flagged0.020 |
| 23J00056CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SAAZ RIVER, SAN RAMON BRIDGE 2, ALONG ZAMBOANGA CITY-LABUAN-LIMPAPA ROAD (S01185MN) SAN RAMON, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱101.2M | 90% | High risk74 | —-0.009 |
| 23F00414CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE TRAINING AND INSTRUCTIONAL FACILITY/MEETINGS INCENTIVES CONFER | Region V | Region V | On-Going | ₱144.7M | 20% | High risk74 | —-0.007 |
| 22O00078UPGRADING/REHABILITATION OF BEATA PUMPING STATION, PANDACAN, MANILA | Central Office | Flood Control Management Cluster | Completed | ₱96.5M | 100% | High risk74 | —-0.065 |
| 18LA0276CONSTRUCTION OF ROAD NETWORK FOR PUBLIC MARKET WITH DRAINAGE, POBLACION, MAWAB, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱18.7M | 100% | High risk73 | —-0.023 |
| 20F00035LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, FLOOD CONTROL AND DRAINAGE-FLOOD CONTROL STRUCTURES/FACILITIES-CONSTRUCTION/REHABILITATION OF KAMANITOHAN RIVER FLOOD CONTROL DIKE(BRGY. ITBA | Region V | Region V | Completed | ₱157.1M | 100% | High risk73 | —-0.064 |
| 23F00113CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE TRAINING AND INSTRUCTIONAL FACILITY/MEETINGS INCENTIVES CONFERE | Region V | Region V | On-Going | ₱144.7M | 26% | High risk72 | —-0.004 |
| 23F00201CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE TRAINING AND INSTRUCTIONAL FACILITY/MEETINGS INCENTIVES CONFER | Region V | Region V | On-Going | ₱144.7M | 52% | High risk72 | —-0.012 |
| 22J00066CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF REVETMENT, KUMALARANG RIVER, ISABELA CITY | Region IX | Region IX | On-Going | ₱101.1M | 95% | High risk72 | —-0.002 |
| 20DI0126CONCRETING OF ROAD WITH DRAINAGE, BARANGAYS CASILE AND MALABAN, BIÑAN, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱72.4M | 100% | High risk71 | —-0.036 |
| 21A00145CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - LAOAG-SAN NICOLAS BYPASS ROAD (SAN NICOLAS SECTION), ILOCOS NORTE PHASE II | Region I | Region I | Completed | ₱250.1M | 100% | High risk71 | —-0.047 |
| 20J00181CONSTRUCTION OF SLOPE PROTECTION ALONG SEIT TAYUNGAN NATIONAL ROAD, SULU | Region IX | Region IX | Completed | ₱95.9M | 100% | High risk71 | —-0.034 |
| 18CD0227CONCRETING OF BRGY. PINAOD - BULUSUKAN ROAD, PHASE II, SAN ILDEFONSO, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱94M | 100% | High risk70 | —-0.027 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24A00606DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP) LGU HOSPITALS - DINGRAS DISTRICT HOSPITAL, ILOCOS NORTE | Region I | Region I | On-Going | ₱73.1M | 39% | Medium risk56 | Flagged0.044 |
| 24A00607DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP) LGU HOSPITALS - DONA JOSEFA EDRALIN MARCOS DISTRICT HOSPITAL, ILOCOS NORTE | Region I | Region I | On-Going | ₱43.9M | 55% | Medium risk44 | Flagged0.037 |
| 24F00492ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-LIGAO-PIO DURAN RD-K0520+000-K0520+540, LIGAO CITY, ALBAY (3RD LEGISLATIVE D | Region V | Region V | On-Going | ₱235.5M | 31% | High risk78 | Flagged0.033 |
| 22E00165CLUSTER 12: CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, ORIENTAL MINDORO, 12.1: CONST. OF BALITE R/C, BRGY. MALAMIG SECT., STA. 0+000-STA. 0+308.60; 12.2: CONST. OF CAWACAT R/C, TABUK SECT., BULALACAO, STA.0+000-STA. 0+324.3; 1 | Region IV-B | Region IV-B | On-Going | ₱289.5M | 62% | High risk67 | Flagged0.022 |
| 25CG0020SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF SAN ESTEBAN BRIDGE, PHASE III, MACABEBE, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱137.4M | 34% | High risk74 | Flagged0.020 |
| 25JJ0028PREVENTIVE MAINTENANCE - SECONDARY ROADS ALONG SIOCON-SIRAWAI-SIBUCO-LIMPAPA RD -(S01151MN) CHAINAGE 23548 - CHAINAGE 24284, CHAINAGE 24608 - CHAINAGE 26765, CHAINAGE 26793 - CHAINAGE 29000 | Region IX | Zamboanga del Norte 4th DEO | On-Going | ₱83.8M | 97% | High risk95 | Flagged0.020 |
| 24D00059CONSTRUCTION OF MISSING LINKS/ NEW ROADS CASILE - TAGAYTAY ROAD, PACKAGE B, LAGUNA | Region IV-A | Region IV-A | On-Going | ₱188.1M | 0% | High risk67 | Flagged0.019 |
| 23HK0069SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SHORE PROTECTION/SEAWALL, BRGY. OKIOT, BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 100% | High risk81 | Flagged0.011 |
| 17EH0120REPAIR/REHABILITATION/IMPROVEMENT OF PATOO RIVER CONTROL, PATOO, ODIONGAN, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱84M | 100% | High risk67 | Flagged0.011 |
| 23KB0156CONSTRUCTION OF ROAD ALONG SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY RD-COTABATO BOUNDARY) TO BRGY LIBERTAD, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱48M | 95% | Medium risk52 | Flagged0.010 |
| 17EH0118REPAIR/REHABILITATION/IMPROVEMENT OF MABLARAN RIVER CONTROL, SAN ANDRES, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱79.5M | 100% | High risk67 | Flagged0.008 |
| 23IL0078CONSTRUCTION / IMPROVEMENT OF BRGY. HILAAN - BRGY. BANAHAO - BRGY. HITAWOS - BRGY. PAMIGSIAN ROAD FMR, BONTOC, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱50M | 100% | Medium risk55 | Flagged0.007 |
| 24E00016FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITH MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG ABRA DE ILOG RIVER, PERLAS SECTION, WAWA, ABRA DE ILOG, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱241.2M | 83% | High risk67 | Flagged0.004 |
| 25HE0093CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF POBLACION FLOOD CONTROL, SANTANDER, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱94.5M | 31% | High risk64 | Flagged0.003 |
| 19L00065CONSTRUCTION OF GRAVEL ROAD-DEMOLOC-LITTLE BAGUIO-ALABEL ROAD, PACKAGE 1, DAVAO OCCIDENTAL | Region XI | Region XI | On-Going | ₱139M | 99% | High risk65 | Flagged0.000 |
| 17OB0460CONSTRUCTION OF FOUR (4) STOREY, TWENTY EIGHT (28) CLASSROOM, SAN JUAN ELEMENTARY SCHOOL, CITY OF SAN JUAN | National Capital Region | Metro Manila 1st DEO | Completed | ₱61.6M | 100% | Medium risk44 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 351 | 21PA0229CONSTRUCTION OF BULI FLOOD CONTROL STRUCTURE, STA.6+500-STA.7+000, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.059 |
| 352 | 22PA0076OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, STA.2+400-STA.3+100, CANAN, LA PAZ | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.061 |
| 353 | 21PA0234CONSTRUCTION OF BULBULALA FLOOD CONTROL STRUCTURE, STA.45+400 - STA.45+900, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.062 |
| 354 | 21PA0220CONSTRUCTION OF GUCAB-DEMET FLOOD CONTROL, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.062 |
| 355 | 22PA0051BASIC INFRASTRUCTURE PROGRAM (BIP) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES CONSTRUCTION OF BUA FLOOD CONTROL STRUCTURE, BARANGAY POBLACION, LACUB, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱46.6M | 100% | Medium risk50 | —-0.064 |
| 356 | 22PA0083BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES CONSTRUCTION OF POBLACION-NALNAS FLOOD CONTROL, BARANGAY POBLACION, LANGIDEN, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱46.5M | 98% | Medium risk50 | —-0.002 |
| 357 | 20AB0008REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, ILOCOS NORTE-ABRA RD - K0532 + 332 - K0532 + 440 | Region I | Ilocos Norte 2nd DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.077 |
| 358 | 22PA0073SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES, CONSTRUCTION OF MAPISLA-MADAO FLOOD CONTROL, LICUAN-BAAY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.066 |
| 359 | 22PA0045BASIC INFRASTRUCTURE PROGRAM (BIP)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES, CONSTRUCTION OF QUIDAOEN-CABCABURAO FLOOD CONTROL STRUCTURE (PHASE II), BARANGAY QUIDAOEN TO BARANGAY CABCABURAO, SAN JUAN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49.5M | 100% | Medium risk50 | —-0.062 |
| 360 | 20AB0030CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, REHABILITATION OF THE LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT DONGDONG RIVER FLOOD CONTROL, BRGY. CARAY, NUEVA ERA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱39.2M | 100% | Medium risk50 | —-0.064 |
| 361 | 20AB0031CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, REHABILITATION UNDER THE LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT ALONG LADING RIVER, BRGY. CABITTAURAN, NUEVA ERA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱41.2M | 100% | Medium risk50 | —-0.064 |
| 362 | 22A00266CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BONGO RIVER, RIGHT BANK, LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT, BRGY. POBLACION, SITIO GOL | Region I | Region I | Completed | ₱43.4M | 100% | Medium risk50 | —-0.066 |
| 363 | 24D00094CONSTRUCTION OF RETARDING BASIN, BARANGAY MAMPLASAN, BIÑAN CITY, LAGUNA | Region IV-A | Region IV-A | On-Going | ₱48.2M | 83% | Medium risk50 | —-0.040 |
| 364 | 18DI0118LIP- FLOOD CONTROL AND DRAINAGE- FLOOD CONTROL STRUCTURES/ FACILITIES -CONSTRUCTION/ REHABILITATION OF A REVETMENT IN STA. ROSA RIVER, BARANGAY DON JOSE, STA. ROSA CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱47.6M | 100% | Medium risk50 | —-0.086 |
| 365 | 22A00264CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BONGO RIVER, RIGHT BANK, LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT, BRGY. POBLACION, SITIO BOL | Region I | Region I | Completed | ₱24.1M | 100% | Medium risk50 | —-0.068 |
| 366 | 21DN0077CONSTRUCTION OF SPILLWAY WITH APPROACHES AT PUROK MAINIT, SITIO SAN JOSEPH, BRGY. SAN JOSE ANTIPOLO CITY | Region IV-A | Rizal 1st DEO | On-Going | ₱47.1M | 57% | Medium risk50 | —-0.003 |
| 367 | 22DI0121REHABILITATION/ IMPROVEMENT OF ROADS, TIMBAO, BINAN CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱49.5M | 100% | Medium risk50 | —-0.087 |
| 368 | 21DI0031CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, LANGKIWA, BIÑAN, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱49.4M | 100% | Medium risk50 | —-0.087 |
| 369 | 18DI0119LIP - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/ FACILITIES - CONSTRUCTION/ REHABILITATION OF A REVETMENT IN STA. ROSA RIVER, BARANGAY STO. DOMINGO, STA. ROSA CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱49.7M | 100% | Medium risk50 | —-0.088 |
| 370 | 19DI0092CONSTRUCTION OF RIVER CONTROL ALONG CABUYAO RIVER, BRGY. CAINGIN , STA. ROSA CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱49.5M | 100% | Medium risk50 | —-0.088 |
| 371 | 20DO0081OO 2: PROTECT LIVES AND PROP. AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROG.- CONST./REHAB. OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURES ALONG UPPER MARIKINA RIVER BRGY. MALY TO BRGY. BURGOS | Region IV-A | Rizal 2nd DEO | Completed | ₱50.4M | 100% | Medium risk50 | —-0.086 |
| 372 | 19DI0093CONSTRUCTION OF RIVER CONTROL ALONG STA. ROSA RIVER, BRGY. DON JOSE, STA. ROSA CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱47M | 100% | Medium risk50 | —-0.086 |
| 373 | 25OG0016REHABILITATION OF FLOOD MITIGATION STRUCTURE ALONG SAN JUAN RIVER (PHASE LXIII), QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱47.3M | 15% | Medium risk50 | —-0.030 |
| 374 | 24OB0260BANK IMPROVEMENT OF SLOPE PROTECTION ALONG PASIG-MARIKINA RIVER, PASIG CITY (PACKAGE 3) | National Capital Region | Metro Manila 1st DEO | Completed | ₱48M | 100% | Medium risk50 | —-0.088 |
| 375 | 19DO0034OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG PURAY RIVER, BRGY. SAM ISIDRO, RODRIGUEZ, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱51.1M | 100% | Medium risk50 | —-0.088 |