Opening the dossier…
Opening the dossier…
Contractor dossier
903 projects on file, including joint ventures this contractor is part of.
Total projects
903
Total budget
₱45.5B
Average progress
97.3%
Completion rate
91.9%
Average risk score
45.4
Medium risk on average, out of 100
Flagged as unusual
16
1.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 218 | ₱10.4B | 48.8 | 1 | 95.9% |
| Region IV-A | 130 | ₱6.5B | 51.1 | 1 | 97.4% |
| Region IV-B | 130 | ₱5.3B | 32.8 | 4 | 98.6% |
| Region III | 104 | ₱4.4B | 35.8 | 1 | 97.4% |
| Region XI | 96 | ₱4.6B | 40.8 | 1 | 100.0% |
| Cordillera Administrative Region | 54 | ₱3.3B | 53.5 | 0 | 100.0% |
| Region I | 35 | ₱2.3B | 51.2 | 2 | 96.8% |
| Region VI | 31 | ₱1.8B | 51.6 | 0 | 95.8% |
| Region IX | 30 | ₱2.6B | 65.3 | 1 | 98.8% |
| Region VIII | 18 | ₱1.1B | 52.5 | 1 | 99.7% |
| Region II | 18 | ₱406M | 42.1 | 0 | 100.0% |
| Region XII | 12 | ₱692.1M | 31.1 | 0 | 95.1% |
| Region X | 11 | ₱266.1M | 36.5 | 1 | 96.7% |
| Region V | 9 | ₱1.3B | 68.8 | 1 | 69.8% |
| Negros Island Region | 4 | ₱312.4M | 60.7 | 1 | 84.6% |
| Central Office | 1 | ₱96.5M | 73.5 | 0 | 100.0% |
| Region VII | 1 | ₱94.5M | 64.2 | 1 | 30.6% |
| Region XIII | 1 | ₱48.2M | 38.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 384 | ₱23B | 49.5 | 4 | 96.9% |
| Buildings and Facilities | 279 | ₱7.3B | 35.0 | 3 | 98.2% |
| Roads | 208 | ₱13.2B | 48.9 | 4 | 98.1% |
| OTHER | 18 | ₱1.1B | 66.2 | 1 | 100.0% |
| Bridges | 10 | ₱706.8M | 52.6 | 3 | 60.5% |
| Bridges, Roads | 2 | ₱102.8M | 50.0 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱83.8M | 95.2 | 1 | 96.8% |
| GAA 2025 OO-1 | 1 | ₱55.3M | 94.3 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25JJ0028PREVENTIVE MAINTENANCE - SECONDARY ROADS ALONG SIOCON-SIRAWAI-SIBUCO-LIMPAPA RD -(S01151MN) CHAINAGE 23548 - CHAINAGE 24284, CHAINAGE 24608 - CHAINAGE 26765, CHAINAGE 26793 - CHAINAGE 29000 | Region IX | Zamboanga del Norte 4th DEO | On-Going | ₱83.8M | 97% | High risk95 | Flagged0.020 |
| 25JJ0001PREVENTIVE MAINTENANCE - SECONDARY ROADS, ZAMBOANGA WEST COASTAL RD (SIBUCO-LIMPAPA SECTION) - (S01152MN) CHAINAGE 5761 - CHAINAGE 9030 | Region IX | Zamboanga del Norte 4th DEO | On-Going | ₱55.3M | 100% | High risk94 | —-0.001 |
| 23HK0069SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SHORE PROTECTION/SEAWALL, BRGY. OKIOT, BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 100% | High risk81 | Flagged0.011 |
| 24CC0400CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GUIGUINTO RIVER AT BARANGAY MALIS-POBLACION-ILANG-ILANG, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱217.1M | 100% | High risk81 | —-0.028 |
| 24F00492ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-LIGAO-PIO DURAN RD-K0520+000-K0520+540, LIGAO CITY, ALBAY (3RD LEGISLATIVE D | Region V | Region V | On-Going | ₱235.5M | 31% | High risk78 | Flagged0.033 |
| 24CC0371CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, SABANG SECTION, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱77.2M | 41% | High risk76 | —-0.008 |
| 23J00073CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MANICAHAN RIVER, MANICAHAN BR. SECTION (B00574MN) ALONG PAGADIAN CITY - ZAMBOANGA CITY ROAD (S01315MN), BARANGAY MANICAHAN, ZAMBOA | Region IX | Region IX | On-Going | ₱96.5M | 91% | High risk74 | —-0.011 |
| 25CG0020SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF SAN ESTEBAN BRIDGE, PHASE III, MACABEBE, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱137.4M | 34% | High risk74 | Flagged0.020 |
| 23J00056CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SAAZ RIVER, SAN RAMON BRIDGE 2, ALONG ZAMBOANGA CITY-LABUAN-LIMPAPA ROAD (S01185MN) SAN RAMON, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱101.2M | 90% | High risk74 | —-0.009 |
| 23F00414CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE TRAINING AND INSTRUCTIONAL FACILITY/MEETINGS INCENTIVES CONFER | Region V | Region V | On-Going | ₱144.7M | 20% | High risk74 | —-0.007 |
| 22O00078UPGRADING/REHABILITATION OF BEATA PUMPING STATION, PANDACAN, MANILA | Central Office | Flood Control Management Cluster | Completed | ₱96.5M | 100% | High risk74 | —-0.065 |
| 18LA0276CONSTRUCTION OF ROAD NETWORK FOR PUBLIC MARKET WITH DRAINAGE, POBLACION, MAWAB, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱18.7M | 100% | High risk73 | —-0.023 |
| 20F00035LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, FLOOD CONTROL AND DRAINAGE-FLOOD CONTROL STRUCTURES/FACILITIES-CONSTRUCTION/REHABILITATION OF KAMANITOHAN RIVER FLOOD CONTROL DIKE(BRGY. ITBA | Region V | Region V | Completed | ₱157.1M | 100% | High risk73 | —-0.064 |
| 23F00113CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE TRAINING AND INSTRUCTIONAL FACILITY/MEETINGS INCENTIVES CONFERE | Region V | Region V | On-Going | ₱144.7M | 26% | High risk72 | —-0.004 |
| 23F00201CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE TRAINING AND INSTRUCTIONAL FACILITY/MEETINGS INCENTIVES CONFER | Region V | Region V | On-Going | ₱144.7M | 52% | High risk72 | —-0.012 |
| 22J00066CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF REVETMENT, KUMALARANG RIVER, ISABELA CITY | Region IX | Region IX | On-Going | ₱101.1M | 95% | High risk72 | —-0.002 |
| 20DI0126CONCRETING OF ROAD WITH DRAINAGE, BARANGAYS CASILE AND MALABAN, BIÑAN, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱72.4M | 100% | High risk71 | —-0.036 |
| 21A00145CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - LAOAG-SAN NICOLAS BYPASS ROAD (SAN NICOLAS SECTION), ILOCOS NORTE PHASE II | Region I | Region I | Completed | ₱250.1M | 100% | High risk71 | —-0.047 |
| 20J00181CONSTRUCTION OF SLOPE PROTECTION ALONG SEIT TAYUNGAN NATIONAL ROAD, SULU | Region IX | Region IX | Completed | ₱95.9M | 100% | High risk71 | —-0.034 |
| 18CD0227CONCRETING OF BRGY. PINAOD - BULUSUKAN ROAD, PHASE II, SAN ILDEFONSO, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱94M | 100% | High risk70 | —-0.027 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24A00606DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP) LGU HOSPITALS - DINGRAS DISTRICT HOSPITAL, ILOCOS NORTE | Region I | Region I | On-Going | ₱73.1M | 39% | Medium risk56 | Flagged0.044 |
| 24A00607DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP) LGU HOSPITALS - DONA JOSEFA EDRALIN MARCOS DISTRICT HOSPITAL, ILOCOS NORTE | Region I | Region I | On-Going | ₱43.9M | 55% | Medium risk44 | Flagged0.037 |
| 24F00492ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-LIGAO-PIO DURAN RD-K0520+000-K0520+540, LIGAO CITY, ALBAY (3RD LEGISLATIVE D | Region V | Region V | On-Going | ₱235.5M | 31% | High risk78 | Flagged0.033 |
| 22E00165CLUSTER 12: CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, ORIENTAL MINDORO, 12.1: CONST. OF BALITE R/C, BRGY. MALAMIG SECT., STA. 0+000-STA. 0+308.60; 12.2: CONST. OF CAWACAT R/C, TABUK SECT., BULALACAO, STA.0+000-STA. 0+324.3; 1 | Region IV-B | Region IV-B | On-Going | ₱289.5M | 62% | High risk67 | Flagged0.022 |
| 25CG0020SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF SAN ESTEBAN BRIDGE, PHASE III, MACABEBE, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱137.4M | 34% | High risk74 | Flagged0.020 |
| 25JJ0028PREVENTIVE MAINTENANCE - SECONDARY ROADS ALONG SIOCON-SIRAWAI-SIBUCO-LIMPAPA RD -(S01151MN) CHAINAGE 23548 - CHAINAGE 24284, CHAINAGE 24608 - CHAINAGE 26765, CHAINAGE 26793 - CHAINAGE 29000 | Region IX | Zamboanga del Norte 4th DEO | On-Going | ₱83.8M | 97% | High risk95 | Flagged0.020 |
| 24D00059CONSTRUCTION OF MISSING LINKS/ NEW ROADS CASILE - TAGAYTAY ROAD, PACKAGE B, LAGUNA | Region IV-A | Region IV-A | On-Going | ₱188.1M | 0% | High risk67 | Flagged0.019 |
| 23HK0069SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SHORE PROTECTION/SEAWALL, BRGY. OKIOT, BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 100% | High risk81 | Flagged0.011 |
| 17EH0120REPAIR/REHABILITATION/IMPROVEMENT OF PATOO RIVER CONTROL, PATOO, ODIONGAN, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱84M | 100% | High risk67 | Flagged0.011 |
| 23KB0156CONSTRUCTION OF ROAD ALONG SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY RD-COTABATO BOUNDARY) TO BRGY LIBERTAD, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱48M | 95% | Medium risk52 | Flagged0.010 |
| 17EH0118REPAIR/REHABILITATION/IMPROVEMENT OF MABLARAN RIVER CONTROL, SAN ANDRES, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱79.5M | 100% | High risk67 | Flagged0.008 |
| 23IL0078CONSTRUCTION / IMPROVEMENT OF BRGY. HILAAN - BRGY. BANAHAO - BRGY. HITAWOS - BRGY. PAMIGSIAN ROAD FMR, BONTOC, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱50M | 100% | Medium risk55 | Flagged0.007 |
| 24E00016FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITH MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG ABRA DE ILOG RIVER, PERLAS SECTION, WAWA, ABRA DE ILOG, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱241.2M | 83% | High risk67 | Flagged0.004 |
| 25HE0093CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF POBLACION FLOOD CONTROL, SANTANDER, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱94.5M | 31% | High risk64 | Flagged0.003 |
| 19L00065CONSTRUCTION OF GRAVEL ROAD-DEMOLOC-LITTLE BAGUIO-ALABEL ROAD, PACKAGE 1, DAVAO OCCIDENTAL | Region XI | Region XI | On-Going | ₱139M | 99% | High risk65 | Flagged0.000 |
| 17OB0460CONSTRUCTION OF FOUR (4) STOREY, TWENTY EIGHT (28) CLASSROOM, SAN JUAN ELEMENTARY SCHOOL, CITY OF SAN JUAN | National Capital Region | Metro Manila 1st DEO | Completed | ₱61.6M | 100% | Medium risk44 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 376 | 24OF0025CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT MARIBLO CREEK, BARANGAY STA. CRUZ, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱48.5M | 100% | Medium risk50 | —-0.088 |
| 377 | 21PA0233CONSTRUCTION OF MALABBAGA FLOOD CONTROL, STA.58+300-STA.58+800, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱29.4M | 100% | Medium risk50 | —-0.063 |
| 378 | 22PA0072SUSTAINABLE INFRASTRUCTURE PROJECT ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES, CONSTRUCTION OF BANGLOLAO-LABON FLOOD CONTROL STRUCTURE, BUCAY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱41.2M | 100% | Medium risk50 | —-0.066 |
| 379 | 22PA0031OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, STA.0+000-STA.0+500, PATOC, BUCAY, | Cordillera Administrative Region | Abra DEO | Completed | ₱30.2M | 100% | Medium risk50 | —-0.066 |
| 380 | 22PA0093BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/ FACILITIES CONSTRUCTION OF GUCAB FLOOD CONTROL, POBLACION, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱46.4M | 100% | Medium risk50 | —-0.061 |
| 381 | 20DO0087LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HEALTH CENTER), SUB-URBAN VILLAGE, BRGY. SAN JOSE, RODRIGUEZ, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱9.5M | 100% | Medium risk50 | —-0.104 |
| 382 | 19DO0108LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/FACILITIES - CONSTRUCTION OF SLOPE PROTECTION/REVETMENT ALONG MORONG RIVER, MORONG, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱49.5M | 100% | Medium risk49 | —-0.086 |
| 383 | 19DO0107LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/FACILITIES - CONSTRUCTION OF SLOPE PROTECTION/REVETMENT ALONG PILILLA RIVER, PILILLA, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱49.5M | 100% | Medium risk49 | —-0.088 |
| 384 | 20B00052CONSTRUCTION OF EVACUATION CENTER, BRGY. LUBLUB, ALFONSO CASTAÑEDA, NUEVA VIZCAYA | Region II | Region II | Completed | ₱34.7M | 100% | Medium risk49 | —-0.080 |
| 385 | 23IB0092CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), ACCESS ROAD FROM NATIONAL HIGHWAY LEADING TO AMANJURAY-AMANDARAGA FALLS, LAWAAN, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱40.9M | 100% | Medium risk49 | —-0.057 |
| 386 | 19DI0008CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURES - CONSTRUCTION OF RIVER CONTROL ALONG SAN CRISTOBAL RIVER, BRGY. BANLIC, CALAMBA CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.089 |
| 387 | 23KB0124CONSTRUCTION OF ROAD ALONG BUKIDNON-DAVAO CITY ROAD TO BARANGAY LIBERTAD, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱49.5M | 100% | Medium risk49 | —-0.091 |
| 388 | 19DI0043CONSTRUCTION OF RIVER CONTROL ALONG BAY RIVER, (BAY BRIDGE) DILA SIDE, BAY, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱48.9M | 100% | Medium risk49 | —-0.089 |
| 389 | 18OC0094BANK IMPROVEMENT/STEEL SHEET PILING AT PARAÑAQUE RIVER NORTH-WEST SIDE (PHASE IV), BRGY. DON GALO, PARAÑAQUE CITY, M.M. | National Capital Region | Metro Manila 2nd DEO | Completed | ₱47.8M | 100% | Medium risk49 | —-0.086 |
| 390 | 19AB0080CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, POBLACION - STO. NIÑO ACCESS ROAD LEADING TO MADONGAN DAM, BRGY. POBLACION. NUEVA ERA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱19.6M | 100% | Medium risk49 | —-0.083 |
| 391 | 19C00007ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS NUEVA ECIJA-AURORA ROAD, PROVINCE OF NUEVA ECIJA | Region III | Region III | Completed | ₱144.7M | 100% | Medium risk49 | —-0.077 |
| 392 | 20A00046CONSTRUCTION OF MISSING LINKS/NEW ROADS, CABUGAO-NUEVA ERA-DANGLAS, NUEVA ERA SECTION, ILOCOS NORTE | Region I | Region I | Completed | ₱13.9M | 100% | Medium risk49 | —-0.084 |
| 393 | 21DN0016CONSTRUCTION OF FLOOD CONTROL STRUCTURES OF CREEK (PHASE 2), SITIO BINAYOYO (UPSTREAM), BRGY. SAN JOSE ANTIPOLO CITY | Region IV-A | Rizal 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.087 |
| 394 | 22DN0030REHABILITATION/SLOPE PROTECTION OF SITIO PAENAAN RIVER, ALONG MARIKINA - INFANTA ROAD (UPSTREAM PHASE 5), BRGY. SAN JOSE, ANTIPOLO CITY (SECOND DISTRICT) | Region IV-A | Rizal 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.083 |
| 395 | 18DI0033FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL ALONG TABON WATERWAYS, BRGY. MAAHAS, LOS BAÑOS, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.087 |
| 396 | 18DK0028CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION FACILITIES ALONG MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG TIGNOAN RIVER, REAL, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.086 |
| 397 | 22OA0034CONSTRUCTION OF RIVERWALL ALONG MALABON-TULLAHAN RIVER (PHASE 4), BRGY. POTRERO, MALABON CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.085 |
| 398 | 19DI0121CONSTRUCTION OF 4 STOREY 12 CLASSROOMS AT DR. MARCELINO Z. BATISTA MEMORIAL ELEMENTARY SCHOOL, CITY OF BIÑAN, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱42.3M | 100% | Medium risk49 | —-0.048 |
| 399 | 19A00058CONSTRUCTION OF MISSING LINKS/NEW ROADS, JCT ILOCOS NORTE ABRA ROAD - NUEVA ERA - TINEG ROAD, NUEVA ERA, ILOCOS NORTE | Region I | Region I | Completed | ₱22.7M | 100% | Medium risk49 | —-0.085 |
| 400 | 20AB0009REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, ILOCOS NORTE-ABRA RD - K0532 + 600 - K0532 + 710, K0533 + 091 - K0533 + 111 | Region I | Ilocos Norte 2nd DEO | Completed | ₱21.1M | 100% | Medium risk49 | —-0.081 |