Opening the dossier…
Opening the dossier…
Contractor dossier
903 projects on file, including joint ventures this contractor is part of.
Total projects
903
Total budget
₱45.5B
Average progress
97.3%
Completion rate
91.9%
Average risk score
45.4
Medium risk on average, out of 100
Flagged as unusual
16
1.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 218 | ₱10.4B | 48.8 | 1 | 95.9% |
| Region IV-A | 130 | ₱6.5B | 51.1 | 1 | 97.4% |
| Region IV-B | 130 | ₱5.3B | 32.8 | 4 | 98.6% |
| Region III | 104 | ₱4.4B | 35.8 | 1 | 97.4% |
| Region XI | 96 | ₱4.6B | 40.8 | 1 | 100.0% |
| Cordillera Administrative Region | 54 | ₱3.3B | 53.5 | 0 | 100.0% |
| Region I | 35 | ₱2.3B | 51.2 | 2 | 96.8% |
| Region VI | 31 | ₱1.8B | 51.6 | 0 | 95.8% |
| Region IX | 30 | ₱2.6B | 65.3 | 1 | 98.8% |
| Region VIII | 18 | ₱1.1B | 52.5 | 1 | 99.7% |
| Region II | 18 | ₱406M | 42.1 | 0 | 100.0% |
| Region XII | 12 | ₱692.1M | 31.1 | 0 | 95.1% |
| Region X | 11 | ₱266.1M | 36.5 | 1 | 96.7% |
| Region V | 9 | ₱1.3B | 68.8 | 1 | 69.8% |
| Negros Island Region | 4 | ₱312.4M | 60.7 | 1 | 84.6% |
| Central Office | 1 | ₱96.5M | 73.5 | 0 | 100.0% |
| Region VII | 1 | ₱94.5M | 64.2 | 1 | 30.6% |
| Region XIII | 1 | ₱48.2M | 38.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 384 | ₱23B | 49.5 | 4 | 96.9% |
| Buildings and Facilities | 279 | ₱7.3B | 35.0 | 3 | 98.2% |
| Roads | 208 | ₱13.2B | 48.9 | 4 | 98.1% |
| OTHER | 18 | ₱1.1B | 66.2 | 1 | 100.0% |
| Bridges | 10 | ₱706.8M | 52.6 | 3 | 60.5% |
| Bridges, Roads | 2 | ₱102.8M | 50.0 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱83.8M | 95.2 | 1 | 96.8% |
| GAA 2025 OO-1 | 1 | ₱55.3M | 94.3 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25JJ0028PREVENTIVE MAINTENANCE - SECONDARY ROADS ALONG SIOCON-SIRAWAI-SIBUCO-LIMPAPA RD -(S01151MN) CHAINAGE 23548 - CHAINAGE 24284, CHAINAGE 24608 - CHAINAGE 26765, CHAINAGE 26793 - CHAINAGE 29000 | Region IX | Zamboanga del Norte 4th DEO | On-Going | ₱83.8M | 97% | High risk95 | Flagged0.020 |
| 25JJ0001PREVENTIVE MAINTENANCE - SECONDARY ROADS, ZAMBOANGA WEST COASTAL RD (SIBUCO-LIMPAPA SECTION) - (S01152MN) CHAINAGE 5761 - CHAINAGE 9030 | Region IX | Zamboanga del Norte 4th DEO | On-Going | ₱55.3M | 100% | High risk94 | —-0.001 |
| 23HK0069SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SHORE PROTECTION/SEAWALL, BRGY. OKIOT, BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 100% | High risk81 | Flagged0.011 |
| 24CC0400CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GUIGUINTO RIVER AT BARANGAY MALIS-POBLACION-ILANG-ILANG, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱217.1M | 100% | High risk81 | —-0.028 |
| 24F00492ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-LIGAO-PIO DURAN RD-K0520+000-K0520+540, LIGAO CITY, ALBAY (3RD LEGISLATIVE D | Region V | Region V | On-Going | ₱235.5M | 31% | High risk78 | Flagged0.033 |
| 24CC0371CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, SABANG SECTION, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱77.2M | 41% | High risk76 | —-0.008 |
| 23J00073CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MANICAHAN RIVER, MANICAHAN BR. SECTION (B00574MN) ALONG PAGADIAN CITY - ZAMBOANGA CITY ROAD (S01315MN), BARANGAY MANICAHAN, ZAMBOA | Region IX | Region IX | On-Going | ₱96.5M | 91% | High risk74 | —-0.011 |
| 25CG0020SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF SAN ESTEBAN BRIDGE, PHASE III, MACABEBE, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱137.4M | 34% | High risk74 | Flagged0.020 |
| 23J00056CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SAAZ RIVER, SAN RAMON BRIDGE 2, ALONG ZAMBOANGA CITY-LABUAN-LIMPAPA ROAD (S01185MN) SAN RAMON, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱101.2M | 90% | High risk74 | —-0.009 |
| 23F00414CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE TRAINING AND INSTRUCTIONAL FACILITY/MEETINGS INCENTIVES CONFER | Region V | Region V | On-Going | ₱144.7M | 20% | High risk74 | —-0.007 |
| 22O00078UPGRADING/REHABILITATION OF BEATA PUMPING STATION, PANDACAN, MANILA | Central Office | Flood Control Management Cluster | Completed | ₱96.5M | 100% | High risk74 | —-0.065 |
| 18LA0276CONSTRUCTION OF ROAD NETWORK FOR PUBLIC MARKET WITH DRAINAGE, POBLACION, MAWAB, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱18.7M | 100% | High risk73 | —-0.023 |
| 20F00035LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, FLOOD CONTROL AND DRAINAGE-FLOOD CONTROL STRUCTURES/FACILITIES-CONSTRUCTION/REHABILITATION OF KAMANITOHAN RIVER FLOOD CONTROL DIKE(BRGY. ITBA | Region V | Region V | Completed | ₱157.1M | 100% | High risk73 | —-0.064 |
| 23F00113CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE TRAINING AND INSTRUCTIONAL FACILITY/MEETINGS INCENTIVES CONFERE | Region V | Region V | On-Going | ₱144.7M | 26% | High risk72 | —-0.004 |
| 23F00201CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE TRAINING AND INSTRUCTIONAL FACILITY/MEETINGS INCENTIVES CONFER | Region V | Region V | On-Going | ₱144.7M | 52% | High risk72 | —-0.012 |
| 22J00066CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF REVETMENT, KUMALARANG RIVER, ISABELA CITY | Region IX | Region IX | On-Going | ₱101.1M | 95% | High risk72 | —-0.002 |
| 20DI0126CONCRETING OF ROAD WITH DRAINAGE, BARANGAYS CASILE AND MALABAN, BIÑAN, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱72.4M | 100% | High risk71 | —-0.036 |
| 21A00145CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - LAOAG-SAN NICOLAS BYPASS ROAD (SAN NICOLAS SECTION), ILOCOS NORTE PHASE II | Region I | Region I | Completed | ₱250.1M | 100% | High risk71 | —-0.047 |
| 20J00181CONSTRUCTION OF SLOPE PROTECTION ALONG SEIT TAYUNGAN NATIONAL ROAD, SULU | Region IX | Region IX | Completed | ₱95.9M | 100% | High risk71 | —-0.034 |
| 18CD0227CONCRETING OF BRGY. PINAOD - BULUSUKAN ROAD, PHASE II, SAN ILDEFONSO, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱94M | 100% | High risk70 | —-0.027 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24A00606DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP) LGU HOSPITALS - DINGRAS DISTRICT HOSPITAL, ILOCOS NORTE | Region I | Region I | On-Going | ₱73.1M | 39% | Medium risk56 | Flagged0.044 |
| 24A00607DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP) LGU HOSPITALS - DONA JOSEFA EDRALIN MARCOS DISTRICT HOSPITAL, ILOCOS NORTE | Region I | Region I | On-Going | ₱43.9M | 55% | Medium risk44 | Flagged0.037 |
| 24F00492ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-LIGAO-PIO DURAN RD-K0520+000-K0520+540, LIGAO CITY, ALBAY (3RD LEGISLATIVE D | Region V | Region V | On-Going | ₱235.5M | 31% | High risk78 | Flagged0.033 |
| 22E00165CLUSTER 12: CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, ORIENTAL MINDORO, 12.1: CONST. OF BALITE R/C, BRGY. MALAMIG SECT., STA. 0+000-STA. 0+308.60; 12.2: CONST. OF CAWACAT R/C, TABUK SECT., BULALACAO, STA.0+000-STA. 0+324.3; 1 | Region IV-B | Region IV-B | On-Going | ₱289.5M | 62% | High risk67 | Flagged0.022 |
| 25CG0020SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF SAN ESTEBAN BRIDGE, PHASE III, MACABEBE, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱137.4M | 34% | High risk74 | Flagged0.020 |
| 25JJ0028PREVENTIVE MAINTENANCE - SECONDARY ROADS ALONG SIOCON-SIRAWAI-SIBUCO-LIMPAPA RD -(S01151MN) CHAINAGE 23548 - CHAINAGE 24284, CHAINAGE 24608 - CHAINAGE 26765, CHAINAGE 26793 - CHAINAGE 29000 | Region IX | Zamboanga del Norte 4th DEO | On-Going | ₱83.8M | 97% | High risk95 | Flagged0.020 |
| 24D00059CONSTRUCTION OF MISSING LINKS/ NEW ROADS CASILE - TAGAYTAY ROAD, PACKAGE B, LAGUNA | Region IV-A | Region IV-A | On-Going | ₱188.1M | 0% | High risk67 | Flagged0.019 |
| 23HK0069SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SHORE PROTECTION/SEAWALL, BRGY. OKIOT, BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 100% | High risk81 | Flagged0.011 |
| 17EH0120REPAIR/REHABILITATION/IMPROVEMENT OF PATOO RIVER CONTROL, PATOO, ODIONGAN, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱84M | 100% | High risk67 | Flagged0.011 |
| 23KB0156CONSTRUCTION OF ROAD ALONG SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY RD-COTABATO BOUNDARY) TO BRGY LIBERTAD, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱48M | 95% | Medium risk52 | Flagged0.010 |
| 17EH0118REPAIR/REHABILITATION/IMPROVEMENT OF MABLARAN RIVER CONTROL, SAN ANDRES, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱79.5M | 100% | High risk67 | Flagged0.008 |
| 23IL0078CONSTRUCTION / IMPROVEMENT OF BRGY. HILAAN - BRGY. BANAHAO - BRGY. HITAWOS - BRGY. PAMIGSIAN ROAD FMR, BONTOC, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱50M | 100% | Medium risk55 | Flagged0.007 |
| 24E00016FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITH MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG ABRA DE ILOG RIVER, PERLAS SECTION, WAWA, ABRA DE ILOG, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱241.2M | 83% | High risk67 | Flagged0.004 |
| 25HE0093CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF POBLACION FLOOD CONTROL, SANTANDER, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱94.5M | 31% | High risk64 | Flagged0.003 |
| 19L00065CONSTRUCTION OF GRAVEL ROAD-DEMOLOC-LITTLE BAGUIO-ALABEL ROAD, PACKAGE 1, DAVAO OCCIDENTAL | Region XI | Region XI | On-Going | ₱139M | 99% | High risk65 | Flagged0.000 |
| 17OB0460CONSTRUCTION OF FOUR (4) STOREY, TWENTY EIGHT (28) CLASSROOM, SAN JUAN ELEMENTARY SCHOOL, CITY OF SAN JUAN | National Capital Region | Metro Manila 1st DEO | Completed | ₱61.6M | 100% | Medium risk44 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 451 | 18OH0100CONSTRUCTION OF SLOPE PROTECTION/BANK IMPROVEMENT OF LIBERTAD CHANNEL (RIGHT BANK FACING ROXAS BLVD) | National Capital Region | South Manila DEO | Completed | ₱46.6M | 100% | Medium risk47 | —-0.098 |
| 452 | 21OE0007BANK IMPROVEMENT (STEEL SHEET PILE) ESTERO DE QUIAPO, BARANGAY 394 (PHASE I), STA.0+434.00 TO STA.0+470.00, STA.0+500.00 TO STA.0+616.80, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱46.8M | 100% | Medium risk47 | —-0.089 |
| 453 | 19DO0016OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-MANILA EAST RD. K0039+(-116) - K0039+000.50, CARDONA, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱36M | 100% | Medium risk47 | —-0.107 |
| 454 | 21OI0015CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS: QUIRINO AVENUE K0012+176 - K0012+744, LAS PIÑAS CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱39.2M | 100% | Medium risk47 | —-0.096 |
| 455 | 18OB0114REHABILITATION OF MULTI-PURPOSE BUILDING AND COMPLETION OF FACILITIES AT HIGHWAY HILLS INTEGRATED SCHOOL, BRGY. HIGHWAY HILLS, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.101 |
| 456 | 18OB0239REHAB. OF MULTI-PURPOSE BUILDING AT BRGY. MALAMIG, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.102 |
| 457 | 20LE0048NETWORK DEVELOPMENT - OFF - CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS, DAVAO-SARANGANI COASTAL ROAD, (MALALAG-MALITA-JAS-GLAN) K1722+200 - K1723+746 | Region XI | Davao Occidental DEO | Completed | ₱43.9M | 100% | Medium risk47 | —-0.089 |
| 458 | 20LH0002REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG DAVAO-BUKIDNON RD- K1637+720-K1637+785 | Region XI | Davao City 2nd DEO | Completed | ₱46.5M | 100% | Medium risk47 | —-0.089 |
| 459 | 19DP0011REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - CALAUAN - NAGCARLAN BDRY. RD. K0080 + 081.35 - K0080 + 932 | Region IV-A | Laguna 3rd DEO | Completed | ₱29.3M | 100% | Medium risk47 | —-0.105 |
| 460 | 18DI0113NETWORK DEVELOPMENT PROGRAM - OFF -CARRIAGEWAY IMPROVEMENT - PRIMARY ROADS - CALAMBA - STA CRUZ - FAMY JCT RD - K0065 + 507 - K0066 + 000, K0066 + 500 - K0066 + 580, K0066 + 660 - K0067 + 000, BAY, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱31M | 100% | Medium risk47 | —-0.108 |
| 461 | 22LB0387CONSTRUCTION OF MULTI-PURPOSE BUILDING AT PUROK 4 SITIO KAUSWAGAN, BARANGAY LANGUB, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱42.1M | 100% | Medium risk47 | —-0.086 |
| 462 | 22OH0008ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS-PRES. DIOSDADO MACAPAGAL BLVD.,(SO4020LZ) CHAINAGE 0-CHAINAGE 421, CHAINAGE 521 | National Capital Region | South Manila DEO | Completed | ₱42.7M | 100% | Medium risk47 | —-0.097 |
| 463 | 19OD0265REHABILITATION OF ROADS AND DRAINAGE BRGY. 12, 14, 21, 25, 28 & 34, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱37.7M | 100% | Medium risk47 | —-0.098 |
| 464 | 20OH0005OO1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTR | National Capital Region | South Manila DEO | Completed | ₱37.3M | 100% | Medium risk47 | —-0.098 |
| 465 | 18OH0023ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG SAN | National Capital Region | South Manila DEO | Completed | ₱33.7M | 100% | Medium risk47 | —-0.099 |
| 466 | 21DO0033ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-SECONDARY ROADS-MANILA EAST RD.- K0042+000-K0043+000 CARDONA, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱33.7M | 100% | Medium risk47 | —-0.100 |
| 467 | 18DO0050ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSETM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-TERTIARY ROADS-SAGBAT-PILILLA DIV. RD. - KO050+000 - KO050+426, KO050+448 - KO051+000, KO054+000-KO054+631 | Region IV-A | Rizal 2nd DEO | Completed | ₱42.7M | 100% | Medium risk47 | —-0.105 |
| 468 | 20LE0022CONSTRUCTION OF CONCRETE REVETMENT, TICAL FLOOD CONTROL, MALITA, DAVAO OCCIDENTAL | Region XI | Davao Occidental DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.086 |
| 469 | 20LE0021CONSTRUCTION / MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST. OF CULAMAN FLOOD CONTROL, JOSE ABAD SANTOS, DAVAO OCCIDENTAL (STA. 0+000 - STA. 1+000) | Region XI | Davao Occidental DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.086 |
| 470 | 18OB0113REHABILITATION OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES AT EULOGIO RODRIGUEZ INTEGRATED SCHOOL, BRGY. HAGDAN BATO ITAAS, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.101 |
| 471 | 19OH0142LOCAL PROGRAM-LOCAL INFRA PROGRAM-LOCAL ROADS & BRIDGES-LOCAL ROADS-REPAIR/REHAB/IMPVT OF ROAD ALONG | National Capital Region | South Manila DEO | Completed | ₱30.1M | 100% | Medium risk47 | —-0.081 |
| 472 | 18LB0237CONSTRUCTION OF 4 STOREY 16 CLASSROOM (7MX18M) DR. SANTIAGO DAKUDAO SR. NATIONAL HIGH SCHOOL, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱53.7M | 100% | Medium risk47 | —-0.024 |
| 473 | 18LB0236CONSTRUCTION OF 4 STOREY 24 CLASSROOM SCHOOL BUILDING, V. CORCUERA ELEMENTARY SCHOOL, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱52.1M | 100% | Medium risk47 | —-0.027 |
| 474 | 20OA0053REHABILITATION OF ROAD, SIMEON DE JESUS ST., BRGY. SAN RAFAEL VILLAGE, NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.098 |
| 475 | 18DO0135CONSTRUCTION OF FOUR (4) STOREY TWELVE (12) CLASSROOM SCHOOL BUILDING AT SAN ISIDRO ELEMENTARY SCHOOL RODRIGUEZ (MONTALBAN) RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱40.2M | 100% | Medium risk47 | —-0.050 |