Contractor dossier
402 projects on file, including joint ventures this contractor is part of.
Total projects
402
Total budget
₱20.4B
Average progress
96.7%
Completion rate
90.8%
Average risk score
40.8
Medium risk on average, out of 100
Flagged as unusual
7
1.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 313 | ₱17.1B | 38.8 | 6 | 96.3% |
| National Capital Region | 58 | ₱2.2B | 49.4 | 0 | 98.6% |
| Region IV-B | 14 | ₱307.1M | 37.0 | 0 | 100.0% |
| Region I | 7 | ₱263.6M | 44.8 | 0 | 100.0% |
| Region IV-A | 6 | ₱139.9M | 49.9 | 0 | 100.0% |
| Region V | 2 | ₱77.3M | 74.0 | 1 | 50.0% |
| Central Office | 1 | ₱260.3M | 77.0 | 0 | 100.0% |
| Region II | 1 | ₱96.5M | 54.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 188 | ₱10.9B | 39.9 | 0 | 98.4% |
| Roads | 111 | ₱5.6B | 40.8 | 2 | 97.2% |
| Buildings and Facilities | 90 | ₱3.4B | 41.7 | 3 | 94.2% |
| Bridges | 7 | ₱305.8M | 39.9 | 1 | 85.7% |
| OTHER | 5 | ₱167.6M | 49.0 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱28.1M | 93.3 | 1 | 0.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25F00066ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - MAKABUBOS BR. (B02741LZ) ALONG MAHARLIKA HIGHWAY, BASUD, CAMARINES NORTE (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱28.1M | 0% | High risk93 | Flagged0.019 |
| 24CM0068NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES, CONSTRUCTION OF SUBIC GENERAL HOSPITAL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱289.5M | 92% | High risk82 | Flagged0.003 |
| 25CM0044CSSP, BIP, MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES STRUCTURAL AND RESILIENCE PROGRAM, CONSTRUCTION OF SUBIC MUNICIPAL HALL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱97.5M | 1% | High risk81 | Flagged0.007 |
| 25CC0189CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BARANGAY SAN FRANCISCO, BULAKAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 89% | High risk81 | —-0.023 |
| 25CM0029CSSP, BIP, MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING PHASE 2, BARANGAY SAN AGUSTIN, CASTILLEJOS, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱147.8M | 78% | High risk80 | —-0.007 |
| 25CM0047CSSP, BIP, MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI-PURPOSE BUILDING, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱58.5M | 20% | High risk79 | —-0.006 |
| 25CM0066CSSP, BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. BARACA-CAMACHILE, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱48.7M | 0% | High risk78 | —-0.003 |
| 25C00520CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)-REHAB. OF ROAD, CANDABA-BALIWAG ROAD (PASIG-POBLACION SECT.) CANDABA, P | Region III | Region III | On-Going | ₱236.4M | 0% | High risk77 | Flagged0.013 |
| 21Z00015REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱260.3M | 100% | High risk77 | —-0.028 |
| 24C00410CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-ACCESS RDS. &/OR BRS. FR. THE NAT;L. RD/S LEAD. TO MAJOR/STRATEGIC PUBLIC BLDGS/FACILITIES-CONST. OF STO. TOMAS-ARAYAT BYPASS ROAD (CANDABA-SAN LUIS SECTION), PROV. OF PAMP. | Region III | Region III | On-Going | ₱189.1M | 0% | High risk76 | Flagged0.016 |
| 25CG0031NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BYPASS AND DIVERSION ROADS - STA. ANA - ARAYAT BY-PASS ROAD, (STA. ANA SECTION) PHASE II, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱91.1M | 98% | High risk74 | —-0.034 |
| 20CK0044CONSTRUCTION OF TRADOC ATF FACILITY, TRADOC, CAMP O'DONNELL, BRGY. STA. LUCIA, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱23.8M | 100% | High risk71 | —-0.067 |
| 25CM0036CSSP SPECIAL ROAD FUND MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD LIGHTING (PHASE II) AT OLONGAPO CITY, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱19.1M | 82% | High risk70 | —-0.035 |
| 25CM0038CSSP - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD LIGHTING, SAN MARCELINO, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱19.1M | 100% | High risk69 | —-0.039 |
| 17CM0030REHAB. OF DAMAGED PAVED ROAD INCL. DRAINAGE, JOSE ABAD SANTOS AVENUE (JASA), OLONGAPO CITY | Region III | Zambales 2nd DEO | Completed | ₱12M | 100% | High risk69 | —-0.065 |
| 17CH0032REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON | Region III | Pampanga 2nd DEO | Completed | ₱27.4M | 100% | High risk69 | —-0.067 |
| 17CM0013REHAB. OF DRAINAGE ALONG SAN MARCELINO-NAGBAYTO RD, K0151+(-1012)-KO151+(-459), SAN MARCELINO, ZAMB. | Region III | Zambales 2nd DEO | Completed | ₱9.4M | 100% | High risk69 | —-0.062 |
| 17CG0024REHABILITATION/IMPROVEMENT OF CABALANTIAN CREEK, BACOLOR, PAMPANGA (RA 9506 BACOLOR REHABILITATION ACT), BACOLOR, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱16.2M | 100% | High risk69 | —-0.059 |
| 17CG0031REHABILITATION/IMPROVEMENT OF BUNGANG GUINTO RIVER, SAN LORENZO, MEXICO, PAMPANGA STA. 0+300 - STA. 0+780, MEXICO, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱24.8M | 100% | High risk68 | —-0.064 |
| 16CK0186NETWORK DEV'T.-OFF-CARRIAGEWAY IMPT INCLUDING DRAINAGE ALONG CONCEPCION-LAPAZ ROAD, CONC AND LAPAZ, | Region III | Tarlac 2nd DEO | Completed | ₱26.8M | 100% | High risk68 | —-0.068 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CM0075CONSTRUCTION OF SCHOOL BUILDING, OLONGAPO CITY ELEMENTARY SCHOOL (PHASE 2), BARANGAY WEST BAJAC-BAJAC, OLONGAPO CITY, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱19.7M | 34% | Medium risk54 | Flagged0.027 |
| 24C00022CONVERGENCE & SPL. SUPPORT PROGRAM-SUSTAINABLE INFRA PROJS. ALLEVIATIING GAPS (SIPAG)-ACCESS RDS. &/OR BRS. FR. THE NAT'L. RD./S LEAD. TO MAJOR/STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF STO. TOMAS-ARAYAT BYPASS RD. (SAN LUIS SECT.) SAN LUIS, PAMPANGA. | Region III | Region III | On-Going | ₱89.8M | 0% | High risk68 | Flagged0.025 |
| 25F00066ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - MAKABUBOS BR. (B02741LZ) ALONG MAHARLIKA HIGHWAY, BASUD, CAMARINES NORTE (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱28.1M | 0% | High risk93 | Flagged0.019 |
| 24C00410CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-ACCESS RDS. &/OR BRS. FR. THE NAT;L. RD/S LEAD. TO MAJOR/STRATEGIC PUBLIC BLDGS/FACILITIES-CONST. OF STO. TOMAS-ARAYAT BYPASS ROAD (CANDABA-SAN LUIS SECTION), PROV. OF PAMP. | Region III | Region III | On-Going | ₱189.1M | 0% | High risk76 | Flagged0.016 |
| 25C00520CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)-REHAB. OF ROAD, CANDABA-BALIWAG ROAD (PASIG-POBLACION SECT.) CANDABA, P | Region III | Region III | On-Going | ₱236.4M | 0% | High risk77 | Flagged0.013 |
| 25CM0044CSSP, BIP, MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES STRUCTURAL AND RESILIENCE PROGRAM, CONSTRUCTION OF SUBIC MUNICIPAL HALL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱97.5M | 1% | High risk81 | Flagged0.007 |
| 24CM0068NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES, CONSTRUCTION OF SUBIC GENERAL HOSPITAL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱289.5M | 92% | High risk82 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 226 | 20CL0081CONSTRUCTION OF SLOPE PROTECTION ALONG OLONGAPO BUGALLON ROAD, BOTOLAN SECTION K0 189 + 000 - K0 189+776, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱42.3M | 100% | Medium risk36 | —-0.095 |
| 227 | 21CM0023FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION OF STA. RITA RIVER, STA. 6+331.20 - STA. 6+756.00 (LEFT SIDE), OLONGAPO CITY | Region III | Zambales 2nd DEO | Completed | ₱80.2M | 100% | Medium risk36 | —-0.083 |
| 228 | 20EA0060CONSTRUCTION OF TORRIJOS PUBLIC MARKET (PHASE III), TORRIJOS, MARINDUQUE PROVINCE | Region IV-B | Marinduque DEO | Completed | ₱9.7M | 100% | Medium risk36 | —-0.088 |
| 229 | 24CG0010BRIDGE PROGRAM: CONSTRUCTION OF NEW BRIDGES - CANDABA BR. (PARALLEL BR.) ALONG BALIWAG - CANDABA - STA ANA RD, CANDABA, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱59.2M | 100% | Medium risk36 | —-0.062 |
| 230 | 21CM0058REHABILITATION OF FLOOD MITIGATION STRUCTURE & DRAINAGE SYSTEM OF STA. RITA RIVER, STA. 7+481.60 TO STA. 7+881.00 (RIGHT SIDE), OLONGAPO CITY | Region III | Zambales 2nd DEO | Completed | ₱77.2M | 100% | Medium risk36 | —-0.082 |
| 231 | 20CM0079REHABILITATION OF STA. RITA RIVER, STA. 8+240 TO STA. 8+640 (RIGHT SIDE), OLONGAPO CITY | Region III | Zambales 2nd DEO | Completed | ₱77.2M | 100% | Medium risk36 | —-0.084 |
| 232 | 20CM0082REHABILITATION OF STA. RITA RIVER, STA. 7+850 TO STA. 8+240 (RIGHT SIDE), OLONGAPO CITY | Region III | Zambales 2nd DEO | Completed | ₱74.9M | 100% | Medium risk36 | —-0.086 |
| 233 | 19CL0023REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG SECONDARY ROADS, OLONGAPO-BUGALLON ROAD, K0 175+585 - K0 176+544, K0 177+818 - K0 178+705 | Region III | Zambales 1st DEO | Completed | ₱23.5M | 100% | Medium risk36 | —-0.097 |
| 234 | 20CM0017REHABILITATION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM OF STA. RITA RIVER, STA. 3+688 - STA. 3+960 (RIGHT SIDE), OLONGAPO CITY | Region III | Zambales 2nd DEO | Completed | ₱56.7M | 100% | Medium risk36 | —-0.086 |
| 235 | 18CL0002OFF- CARRIAGEWAY IMPROVEMENT, SECONDARY ROADS ALONG OLONGAPO- BUGALLON ROAD, K0176+198- K0176+543, K | Region III | Zambales 1st DEO | Completed | ₱25.9M | 100% | Medium risk36 | —-0.095 |
| 236 | 21CL0015REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS -AMUNGAN-PALAUIG-BANLOG RD- K0217+760 - K0218+753 | Region III | Zambales 1st DEO | Completed | ₱18.7M | 100% | Medium risk35 | —-0.095 |
| 237 | 20CM0016REHABILITATION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM OF STA. RITA RIVER, STA. 4+291.60 - STA. 4+612.60 (LEFT SIDE), OLONGAPO CITY | Region III | Zambales 2nd DEO | Completed | ₱66.2M | 100% | Medium risk35 | —-0.086 |
| 238 | 24CG0015CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF SLOPE PROTECTION AT MALISIK RIVER, PHASE IV, BARANGAY BARANGCA, CANDABA, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱78.8M | 100% | Medium risk35 | —-0.086 |
| 239 | 23CM0015CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION OF CALAPACUAN RIVER, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | Completed | ₱67.5M | 100% | Medium risk35 | —-0.083 |
| 240 | 24CG0014CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF SLOPE PROTECTION AT MALISIK RIVER, PHASE III, BARANGAY BARANGCA, CANDABA, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱78.8M | 100% | Medium risk35 | —-0.086 |
| 241 | 20CM0066REHABILITATION OF STA. RITA RIVER, STA. 6+480.60 - STA. 6+756 (LEFT SIDE), OLONGAPO CITY | Region III | Zambales 2nd DEO | Completed | ₱57.6M | 100% | Medium risk35 | —-0.087 |
| 242 | 23CK0007CONSTRUCTION OF GROUNDSILL WITH REINFORCED CONCRETE SLOPE PROTECTION ALONG PARUA RIVER, DOWNSTREAM OF SAN FRANCISCO BRIDGE, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱86.8M | 100% | Medium risk35 | —-0.082 |
| 243 | 18CF0073CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PEÑARANDA RIVER, BRGY. MALAPIT, SAN ISIDRO, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱71.2M | 100% | Medium risk35 | —-0.087 |
| 244 | 20CM0067FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, REHABILITATION OF STA. RITA RIVER, STA. 7+155.40 TO STA. 7+433.20 (RIGHT SIDE), OLONGAPO CITY | Region III | Zambales 2nd DEO | Completed | ₱57.2M | 100% | Medium risk35 | —-0.087 |
| 245 | 24CG0011FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG SAPANG ARE RIVER, APALIT, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱74.9M | 100% | Medium risk35 | —-0.089 |
| 246 | 21CD0067REHABILITATION / IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG BULO RIVER, LAMBAKIN SECTION, BRGY. LAMBAKIN, SAN MIGUEL, BULACAN PHASE III | Region III | Bulacan 2nd DEO | Terminated | ₱47.8M | 100% | Medium risk35 | —-0.056 |
| 247 | 24CG0016FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION AT MALISIK RIVER, PHASE III (SAN AGUSTIN SECTION), BARANGAY SAN AGUSTIN, CANDABA, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱78.9M | 100% | Medium risk35 | —-0.087 |
| 248 | 22CK0030REHABILITATION OF EXISTING BANK ALONG RIO CHICO RIVER (SAN ROQUE SECTION, RIGHT BANK), D/S OF RIO CHICO BRIDGE, LA PAZ, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱72.8M | 100% | Medium risk35 | —-0.084 |
| 249 | 22CK0029REHABILITATION/IMPROVEMENT OF EXISTING BANK ALONG RIO CHICO RIVER (BALANOY SECTION, RIGHT BANK), LA PAZ, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱73.2M | 100% | Medium risk35 | —-0.084 |
| 250 | 23CM0050FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION OF CAMACHILE RIVER (PRMSU SECTION), SAN MARCELINO, ZAMBALES | Region III | Zambales 2nd DEO | Completed | ₱67.5M | 100% | Medium risk35 | —-0.083 |