Contractor dossier
402 projects on file, including joint ventures this contractor is part of.
Total projects
402
Total budget
₱20.4B
Average progress
96.7%
Completion rate
90.8%
Average risk score
40.8
Medium risk on average, out of 100
Flagged as unusual
7
1.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 313 | ₱17.1B | 38.8 | 6 | 96.3% |
| National Capital Region | 58 | ₱2.2B | 49.4 | 0 | 98.6% |
| Region IV-B | 14 | ₱307.1M | 37.0 | 0 | 100.0% |
| Region I | 7 | ₱263.6M | 44.8 | 0 | 100.0% |
| Region IV-A | 6 | ₱139.9M | 49.9 | 0 | 100.0% |
| Region V | 2 | ₱77.3M | 74.0 | 1 | 50.0% |
| Central Office | 1 | ₱260.3M | 77.0 | 0 | 100.0% |
| Region II | 1 | ₱96.5M | 54.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 188 | ₱10.9B | 39.9 | 0 | 98.4% |
| Roads | 111 | ₱5.6B | 40.8 | 2 | 97.2% |
| Buildings and Facilities | 90 | ₱3.4B | 41.7 | 3 | 94.2% |
| Bridges | 7 | ₱305.8M | 39.9 | 1 | 85.7% |
| OTHER | 5 | ₱167.6M | 49.0 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱28.1M | 93.3 | 1 | 0.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25F00066ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - MAKABUBOS BR. (B02741LZ) ALONG MAHARLIKA HIGHWAY, BASUD, CAMARINES NORTE (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱28.1M | 0% | High risk93 | Flagged0.019 |
| 24CM0068NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES, CONSTRUCTION OF SUBIC GENERAL HOSPITAL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱289.5M | 92% | High risk82 | Flagged0.003 |
| 25CM0044CSSP, BIP, MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES STRUCTURAL AND RESILIENCE PROGRAM, CONSTRUCTION OF SUBIC MUNICIPAL HALL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱97.5M | 1% | High risk81 | Flagged0.007 |
| 25CC0189CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BARANGAY SAN FRANCISCO, BULAKAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 89% | High risk81 | —-0.023 |
| 25CM0029CSSP, BIP, MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING PHASE 2, BARANGAY SAN AGUSTIN, CASTILLEJOS, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱147.8M | 78% | High risk80 | —-0.007 |
| 25CM0047CSSP, BIP, MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI-PURPOSE BUILDING, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱58.5M | 20% | High risk79 | —-0.006 |
| 25CM0066CSSP, BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. BARACA-CAMACHILE, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱48.7M | 0% | High risk78 | —-0.003 |
| 25C00520CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)-REHAB. OF ROAD, CANDABA-BALIWAG ROAD (PASIG-POBLACION SECT.) CANDABA, P | Region III | Region III | On-Going | ₱236.4M | 0% | High risk77 | Flagged0.013 |
| 21Z00015REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱260.3M | 100% | High risk77 | —-0.028 |
| 24C00410CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-ACCESS RDS. &/OR BRS. FR. THE NAT;L. RD/S LEAD. TO MAJOR/STRATEGIC PUBLIC BLDGS/FACILITIES-CONST. OF STO. TOMAS-ARAYAT BYPASS ROAD (CANDABA-SAN LUIS SECTION), PROV. OF PAMP. | Region III | Region III | On-Going | ₱189.1M | 0% | High risk76 | Flagged0.016 |
| 25CG0031NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BYPASS AND DIVERSION ROADS - STA. ANA - ARAYAT BY-PASS ROAD, (STA. ANA SECTION) PHASE II, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱91.1M | 98% | High risk74 | —-0.034 |
| 20CK0044CONSTRUCTION OF TRADOC ATF FACILITY, TRADOC, CAMP O'DONNELL, BRGY. STA. LUCIA, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱23.8M | 100% | High risk71 | —-0.067 |
| 25CM0036CSSP SPECIAL ROAD FUND MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD LIGHTING (PHASE II) AT OLONGAPO CITY, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱19.1M | 82% | High risk70 | —-0.035 |
| 25CM0038CSSP - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD LIGHTING, SAN MARCELINO, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱19.1M | 100% | High risk69 | —-0.039 |
| 17CM0030REHAB. OF DAMAGED PAVED ROAD INCL. DRAINAGE, JOSE ABAD SANTOS AVENUE (JASA), OLONGAPO CITY | Region III | Zambales 2nd DEO | Completed | ₱12M | 100% | High risk69 | —-0.065 |
| 17CH0032REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON | Region III | Pampanga 2nd DEO | Completed | ₱27.4M | 100% | High risk69 | —-0.067 |
| 17CM0013REHAB. OF DRAINAGE ALONG SAN MARCELINO-NAGBAYTO RD, K0151+(-1012)-KO151+(-459), SAN MARCELINO, ZAMB. | Region III | Zambales 2nd DEO | Completed | ₱9.4M | 100% | High risk69 | —-0.062 |
| 17CG0024REHABILITATION/IMPROVEMENT OF CABALANTIAN CREEK, BACOLOR, PAMPANGA (RA 9506 BACOLOR REHABILITATION ACT), BACOLOR, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱16.2M | 100% | High risk69 | —-0.059 |
| 17CG0031REHABILITATION/IMPROVEMENT OF BUNGANG GUINTO RIVER, SAN LORENZO, MEXICO, PAMPANGA STA. 0+300 - STA. 0+780, MEXICO, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱24.8M | 100% | High risk68 | —-0.064 |
| 16CK0186NETWORK DEV'T.-OFF-CARRIAGEWAY IMPT INCLUDING DRAINAGE ALONG CONCEPCION-LAPAZ ROAD, CONC AND LAPAZ, | Region III | Tarlac 2nd DEO | Completed | ₱26.8M | 100% | High risk68 | —-0.068 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CM0075CONSTRUCTION OF SCHOOL BUILDING, OLONGAPO CITY ELEMENTARY SCHOOL (PHASE 2), BARANGAY WEST BAJAC-BAJAC, OLONGAPO CITY, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱19.7M | 34% | Medium risk54 | Flagged0.027 |
| 24C00022CONVERGENCE & SPL. SUPPORT PROGRAM-SUSTAINABLE INFRA PROJS. ALLEVIATIING GAPS (SIPAG)-ACCESS RDS. &/OR BRS. FR. THE NAT'L. RD./S LEAD. TO MAJOR/STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF STO. TOMAS-ARAYAT BYPASS RD. (SAN LUIS SECT.) SAN LUIS, PAMPANGA. | Region III | Region III | On-Going | ₱89.8M | 0% | High risk68 | Flagged0.025 |
| 25F00066ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - MAKABUBOS BR. (B02741LZ) ALONG MAHARLIKA HIGHWAY, BASUD, CAMARINES NORTE (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱28.1M | 0% | High risk93 | Flagged0.019 |
| 24C00410CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-ACCESS RDS. &/OR BRS. FR. THE NAT;L. RD/S LEAD. TO MAJOR/STRATEGIC PUBLIC BLDGS/FACILITIES-CONST. OF STO. TOMAS-ARAYAT BYPASS ROAD (CANDABA-SAN LUIS SECTION), PROV. OF PAMP. | Region III | Region III | On-Going | ₱189.1M | 0% | High risk76 | Flagged0.016 |
| 25C00520CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)-REHAB. OF ROAD, CANDABA-BALIWAG ROAD (PASIG-POBLACION SECT.) CANDABA, P | Region III | Region III | On-Going | ₱236.4M | 0% | High risk77 | Flagged0.013 |
| 25CM0044CSSP, BIP, MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES STRUCTURAL AND RESILIENCE PROGRAM, CONSTRUCTION OF SUBIC MUNICIPAL HALL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱97.5M | 1% | High risk81 | Flagged0.007 |
| 24CM0068NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES, CONSTRUCTION OF SUBIC GENERAL HOSPITAL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱289.5M | 92% | High risk82 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 251 | 23CG0105FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS AT MAASIM RIVER, PHASE II (TRIBUTARY OF PAMPANGA RIVER) BARANGAY PULONG GUBAT, CANDABA, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱68.3M | 100% | Medium risk35 | —-0.090 |
| 252 | 18CL0028PACKAGE 1- A. CONSTRUCTION OF MULTI- PURPOSE BUILDING, BRGY. APO- APO, CABANGAN, ZAMBALES; B. CONSTRUCTION OF MULTI- PURPOSE BUILDING, BRGY. LOMBOY, CABANGAN, ZAMBALES; C. CONSTRUCTION OF MULTI- PURPOSE BUILDING, BR | Region III | Zambales 1st DEO | Completed | ₱17.3M | 100% | Medium risk35 | —-0.097 |
| 253 | 19CH0031NETWORK DEVELOPMENT PROGRAM-OFF-CARRIAGEWAY IMPROVEMENT-TERTIARY ROADS-SAN ANTONIO-FLORIDABLANCA ROAD, K0083+000-K0083+700, K0090+544-K0091+000, K0091+237-K0092+762.30, GUAGUA AND FLORIDABLANCA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱34.2M | 100% | Medium risk35 | —-0.089 |
| 254 | 18CD0234CONSTRUCTION/IMPROVEMENT OF ROAD BRGY. SAN MATEO, NORZAGARAY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱23.3M | 100% | Medium risk35 | —-0.105 |
| 255 | 23CG0140FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS AT MALISIK RIVER PHASE II BARANGAY BARANGCA, CANDABA, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱68.4M | 100% | Medium risk35 | —-0.090 |
| 256 | 20CL0015ROAD WIDENING-TERTIARY ROADS, SAN MARCELINO- SAN ANTONIO-SAN NARCISO ROAD K0 165+745 K0 166+269, SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱14.2M | 100% | Medium risk35 | —-0.036 |
| 257 | 17OE0173CONSTRUCTION OF FOUR STOREY TWELVE CLASSROOM SCHOOL BUILDING (REVISED 3-24-17) VALERIANO E. FUGOSO MEMORIAL SCHOOL, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱30.2M | 100% | Medium risk35 | —-0.021 |
| 258 | 22CG0269NATIONAL BUILDING PROGRAM: BUILDING AND OTHER STRUCTURES - MULTI-PURPOSE/ FACILITIES - REHABILITATION OF PAMPANGA RIVER CONTROL SYSTEM (PRCS) OFFICE/ BUILDING, SULIPAN, APALIT, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱23.1M | 100% | Medium risk35 | —-0.103 |
| 259 | 23CK0008REHABILITATION OF EXISTNG DIKE ALONG O'DONNELL RIVER (PATLING SECTION, RIGHT BANK), STA. 7+658.00 TO STA. 8+214.00, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱66.1M | 100% | Medium risk34 | —-0.084 |
| 260 | 19CK0022CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING OTHER FACILITIES, TARLAC 2ND DISTRICT ENGINEERING OFFICE, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱30.9M | 100% | Medium risk34 | —-0.100 |
| 261 | 21CG0165CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES LOCAL ROADS - CONSTRUCTION OF BY-PASS ROAD ( SAN ESTEBAN) MACABEBE - (MALAULI) MASANTOL, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱45.9M | 100% | Medium risk34 | —-0.102 |
| 262 | 23CG0089FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE IMPROVEMENT AND CONSTRUCTION OF CONCRETE SLOPE PROTECTION WORK AT MAASIM RIVER, PHASE II, BARANGAY BAHAY P | Region III | Pampanga 1st DEO | Completed | ₱68.3M | 100% | Medium risk34 | —-0.088 |
| 263 | 23CG0073FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE IMPROVEMENT AND CONSTRUCTION OF CONCRETE SLOPE PROTECTION WORK AT MAASIM RIVER, PHASE I, BARANGAY BAHAY | Region III | Pampanga 1st DEO | Completed | ₱68.3M | 100% | Medium risk34 | —-0.090 |
| 264 | 23CG0133FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DAMAGED DIKE WITH CONCRETE SLOPE PROTECTION WORKS INCLUDING RIVER TRAINING WORKS AT MAASIM RIVER, PHASE II, BARANGAY VIZAL SAN PABLO, | Region III | Pampanga 1st DEO | Completed | ₱68.4M | 100% | Medium risk34 | —-0.090 |
| 265 | 23CG0079FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DAMAGE DIKE WITH CONCRETE SLOPE PROTECTION WORKS INCLUDING RIVER TRAINING WORKS AT MAASIM RIVER, PHASE I, BARANGAY VIZAL SAN PABLO, C | Region III | Pampanga 1st DEO | Completed | ₱68.3M | 100% | Medium risk34 | —-0.090 |
| 266 | 20CG0018REHABILITATION OF PAMPANGA RIVER ALONG BAMBANG (PHASE I), CANDABA, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱61.8M | 100% | Medium risk34 | —-0.091 |
| 267 | 19CD0069ASSET PRESERVATION REHABILITATION / RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE NORZAGARAY BIGTE ROAD, K0073 + 700 - K0074 + 100, NORZAGARAY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱18.6M | 100% | Medium risk34 | —-0.106 |
| 268 | 21CK0034REHABILITATION OF EXISTING DIKE ALONG TINANG RIVER (LEFT & RIGHT BANK), UPSTREAM OF STA. MONICA BRIDGE, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱67.5M | 100% | Medium risk34 | —-0.085 |
| 269 | 20CM0061REHABILITATION OF KALAKLAN RIVER, BRGY. KALAKLAN, OLONGAPO CITY | Region III | Zambales 2nd DEO | Completed | ₱47.3M | 100% | Medium risk34 | —-0.089 |
| 270 | 18CJ0210LOCAL INFRASTRUCTURE PROGRAM CONSTRUCTION OF TARLAC 1ST DISTRICT HOSPITAL, MONCADA, TARLAC | Region III | Tarlac DEO | Completed | ₱19.2M | 100% | Medium risk34 | —-0.099 |
| 271 | 24CI0062OFF-CARRIAGEWAY IMPROVEMENT-SECONDARY ROADS: ARAYAT-MAGALANG-MABALACAT RD- K0113+158-K0113+235, K0113+580-K0113+645, K0113+849-K0113+903, K0113+903-K0114+140, K0114+140-K0114+186, K0114+186-K0114+265, K0114+662-K0115+510, K0115+510-K0115+567 | Region III | Pampanga 3rd DEO | Completed | ₱35.3M | 100% | Medium risk34 | —-0.102 |
| 272 | 18CI0089LOCAL PROGRAM;CONSTRUCTION/REPAIR/REHAB/IMPROVEMENT OF VARIOUS INFRA INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES;LOCAL ROADS, CONST OF NEW ROAD INCLUDING DRAINAGE LEADING TO PAMPANGA ECONOMIC ZONE (PEZ),ANGELES CITY, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱33.8M | 100% | Medium risk33 | —-0.101 |
| 273 | 22CG0039SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD AT TINAJERO - CABETICAN BANK, BACOLOR, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱46.3M | 100% | Medium risk33 | —-0.103 |
| 274 | 24CI0032SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES: ONSTRUCTION OF ROADS AND DRAINAGE IN MABALACAT, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱34.3M | 100% | Medium risk33 | —-0.103 |
| 275 | 23CG0022SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF APALIT - PULILAN BY-PASS ROAD, (APALIT, PAMPANGA SECTION), BARANG | Region III | Pampanga 1st DEO | Completed | ₱45.8M | 100% | Medium risk33 | —-0.104 |