Contractor dossier
402 projects on file, including joint ventures this contractor is part of.
Total projects
402
Total budget
₱20.4B
Average progress
96.7%
Completion rate
90.8%
Average risk score
40.8
Medium risk on average, out of 100
Flagged as unusual
7
1.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 313 | ₱17.1B | 38.8 | 6 | 96.3% |
| National Capital Region | 58 | ₱2.2B | 49.4 | 0 | 98.6% |
| Region IV-B | 14 | ₱307.1M | 37.0 | 0 | 100.0% |
| Region I | 7 | ₱263.6M | 44.8 | 0 | 100.0% |
| Region IV-A | 6 | ₱139.9M | 49.9 | 0 | 100.0% |
| Region V | 2 | ₱77.3M | 74.0 | 1 | 50.0% |
| Central Office | 1 | ₱260.3M | 77.0 | 0 | 100.0% |
| Region II | 1 | ₱96.5M | 54.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 188 | ₱10.9B | 39.9 | 0 | 98.4% |
| Roads | 111 | ₱5.6B | 40.8 | 2 | 97.2% |
| Buildings and Facilities | 90 | ₱3.4B | 41.7 | 3 | 94.2% |
| Bridges | 7 | ₱305.8M | 39.9 | 1 | 85.7% |
| OTHER | 5 | ₱167.6M | 49.0 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱28.1M | 93.3 | 1 | 0.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25F00066ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - MAKABUBOS BR. (B02741LZ) ALONG MAHARLIKA HIGHWAY, BASUD, CAMARINES NORTE (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱28.1M | 0% | High risk93 | Flagged0.019 |
| 24CM0068NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES, CONSTRUCTION OF SUBIC GENERAL HOSPITAL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱289.5M | 92% | High risk82 | Flagged0.003 |
| 25CM0044CSSP, BIP, MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES STRUCTURAL AND RESILIENCE PROGRAM, CONSTRUCTION OF SUBIC MUNICIPAL HALL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱97.5M | 1% | High risk81 | Flagged0.007 |
| 25CC0189CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BARANGAY SAN FRANCISCO, BULAKAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 89% | High risk81 | —-0.023 |
| 25CM0029CSSP, BIP, MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING PHASE 2, BARANGAY SAN AGUSTIN, CASTILLEJOS, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱147.8M | 78% | High risk80 | —-0.007 |
| 25CM0047CSSP, BIP, MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI-PURPOSE BUILDING, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱58.5M | 20% | High risk79 | —-0.006 |
| 25CM0066CSSP, BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. BARACA-CAMACHILE, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱48.7M | 0% | High risk78 | —-0.003 |
| 25C00520CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)-REHAB. OF ROAD, CANDABA-BALIWAG ROAD (PASIG-POBLACION SECT.) CANDABA, P | Region III | Region III | On-Going | ₱236.4M | 0% | High risk77 | Flagged0.013 |
| 21Z00015REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱260.3M | 100% | High risk77 | —-0.028 |
| 24C00410CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-ACCESS RDS. &/OR BRS. FR. THE NAT;L. RD/S LEAD. TO MAJOR/STRATEGIC PUBLIC BLDGS/FACILITIES-CONST. OF STO. TOMAS-ARAYAT BYPASS ROAD (CANDABA-SAN LUIS SECTION), PROV. OF PAMP. | Region III | Region III | On-Going | ₱189.1M | 0% | High risk76 | Flagged0.016 |
| 25CG0031NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BYPASS AND DIVERSION ROADS - STA. ANA - ARAYAT BY-PASS ROAD, (STA. ANA SECTION) PHASE II, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱91.1M | 98% | High risk74 | —-0.034 |
| 20CK0044CONSTRUCTION OF TRADOC ATF FACILITY, TRADOC, CAMP O'DONNELL, BRGY. STA. LUCIA, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱23.8M | 100% | High risk71 | —-0.067 |
| 25CM0036CSSP SPECIAL ROAD FUND MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD LIGHTING (PHASE II) AT OLONGAPO CITY, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱19.1M | 82% | High risk70 | —-0.035 |
| 25CM0038CSSP - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD LIGHTING, SAN MARCELINO, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱19.1M | 100% | High risk69 | —-0.039 |
| 17CM0030REHAB. OF DAMAGED PAVED ROAD INCL. DRAINAGE, JOSE ABAD SANTOS AVENUE (JASA), OLONGAPO CITY | Region III | Zambales 2nd DEO | Completed | ₱12M | 100% | High risk69 | —-0.065 |
| 17CH0032REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON | Region III | Pampanga 2nd DEO | Completed | ₱27.4M | 100% | High risk69 | —-0.067 |
| 17CM0013REHAB. OF DRAINAGE ALONG SAN MARCELINO-NAGBAYTO RD, K0151+(-1012)-KO151+(-459), SAN MARCELINO, ZAMB. | Region III | Zambales 2nd DEO | Completed | ₱9.4M | 100% | High risk69 | —-0.062 |
| 17CG0024REHABILITATION/IMPROVEMENT OF CABALANTIAN CREEK, BACOLOR, PAMPANGA (RA 9506 BACOLOR REHABILITATION ACT), BACOLOR, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱16.2M | 100% | High risk69 | —-0.059 |
| 17CG0031REHABILITATION/IMPROVEMENT OF BUNGANG GUINTO RIVER, SAN LORENZO, MEXICO, PAMPANGA STA. 0+300 - STA. 0+780, MEXICO, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱24.8M | 100% | High risk68 | —-0.064 |
| 16CK0186NETWORK DEV'T.-OFF-CARRIAGEWAY IMPT INCLUDING DRAINAGE ALONG CONCEPCION-LAPAZ ROAD, CONC AND LAPAZ, | Region III | Tarlac 2nd DEO | Completed | ₱26.8M | 100% | High risk68 | —-0.068 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CM0075CONSTRUCTION OF SCHOOL BUILDING, OLONGAPO CITY ELEMENTARY SCHOOL (PHASE 2), BARANGAY WEST BAJAC-BAJAC, OLONGAPO CITY, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱19.7M | 34% | Medium risk54 | Flagged0.027 |
| 24C00022CONVERGENCE & SPL. SUPPORT PROGRAM-SUSTAINABLE INFRA PROJS. ALLEVIATIING GAPS (SIPAG)-ACCESS RDS. &/OR BRS. FR. THE NAT'L. RD./S LEAD. TO MAJOR/STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF STO. TOMAS-ARAYAT BYPASS RD. (SAN LUIS SECT.) SAN LUIS, PAMPANGA. | Region III | Region III | On-Going | ₱89.8M | 0% | High risk68 | Flagged0.025 |
| 25F00066ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - MAKABUBOS BR. (B02741LZ) ALONG MAHARLIKA HIGHWAY, BASUD, CAMARINES NORTE (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱28.1M | 0% | High risk93 | Flagged0.019 |
| 24C00410CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-ACCESS RDS. &/OR BRS. FR. THE NAT;L. RD/S LEAD. TO MAJOR/STRATEGIC PUBLIC BLDGS/FACILITIES-CONST. OF STO. TOMAS-ARAYAT BYPASS ROAD (CANDABA-SAN LUIS SECTION), PROV. OF PAMP. | Region III | Region III | On-Going | ₱189.1M | 0% | High risk76 | Flagged0.016 |
| 25C00520CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)-REHAB. OF ROAD, CANDABA-BALIWAG ROAD (PASIG-POBLACION SECT.) CANDABA, P | Region III | Region III | On-Going | ₱236.4M | 0% | High risk77 | Flagged0.013 |
| 25CM0044CSSP, BIP, MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES STRUCTURAL AND RESILIENCE PROGRAM, CONSTRUCTION OF SUBIC MUNICIPAL HALL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱97.5M | 1% | High risk81 | Flagged0.007 |
| 24CM0068NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES, CONSTRUCTION OF SUBIC GENERAL HOSPITAL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱289.5M | 92% | High risk82 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 276 | 20CJ0096LOCAL INFRASTRUCTURE PROGRAM CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG CAMILING RIVER CONTROL SURGUI 2ND - SURGUI 1ST PACKAGE B, CAMILING, TARLAC | Region III | Tarlac DEO | Completed | ₱48M | 100% | Medium risk33 | —-0.086 |
| 277 | 19CM0040FLOOD MANAGEMENT PROGRAM, CONS/MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, IMPROVEMENT OF BANICAIN CHANNEL IN BETWEEN OLONGAPO CITY AND SBMA, OLONGAPO CITY, ZAMBALES | Region III | Zambales 2nd DEO | Completed | ₱47.8M | 100% | Medium risk33 | —-0.086 |
| 278 | 19CG0019IMPROVEMENT/ CONCRETING OF SAN VICENTE - TALBA GUGU DIKE ROAD, BACOLOR, PAMPANGA (R.A. 9506- BACOLOR REHABILITATION ACT) | Region III | Pampanga 1st DEO | Completed | ₱37M | 100% | Medium risk33 | —-0.102 |
| 279 | 19CG0066IMPROVEMENT / CONCRETING OF CABALANTIAN - MESALIPIT GUGU DIKE ROAD, BACOLOR, PAMPANGA (R.A. 9506 - BACOLOR, PAMPANGA) | Region III | Pampanga 1st DEO | Completed | ₱41.6M | 100% | Medium risk33 | —-0.103 |
| 280 | 20CG0088FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION/ RESTORATION OF SLOPE PROTECTION ALONG SAPANG BALEN (LEFT SIDE FACING DOWNSTREAM) BRGY. PULUNGBULU, CITY OF SAN FERNANDO, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱54.5M | 100% | Medium risk33 | —-0.089 |
| 281 | 22CH0054CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION ALONG PORAC RIVER, VALDEZ SECTION, FLORIDABLANCA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱48.8M | 100% | Medium risk33 | —-0.091 |
| 282 | 18EA0190PACKAGE 48 - A) CONCRETING/CONSTRUCTION OF BRGY. MARKET SITE TO BRGY. JANAGDONG FARM TO MARKET ROAD, BRGY. JANAGDONG, B) CONCRETING OF BRGY. INO FARM TO MARKET ROAD, BRGY. INO | Region IV-B | Marinduque DEO | Completed | ₱10.8M | 100% | Medium risk33 | —-0.038 |
| 283 | 19CG0095REHABILITATION/ IMPROVEMENT OF SEPUNG ILOG, STA. LUCIA, STA. ANA BYPASS ROAD, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱35.9M | 100% | Medium risk33 | —-0.103 |
| 284 | 18CG0118CONSTRUCTION OF TANGLE MEXICO - SAPALIBUTAD ANGELES CITY BYPASS ROAD LEADING TO DMIA, MEXICO, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱37.5M | 100% | Medium risk33 | —-0.102 |
| 285 | 19CL0062CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. CAPAYAWAN, MUNICIPALITY OF BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱4.9M | 100% | Medium risk33 | —-0.098 |
| 286 | 23CG0145SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF BALITI - PANIPUAN ROAD, CITY OF SAN FERNANDO, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱36.4M | 100% | Medium risk33 | —-0.101 |
| 287 | 18CG0335NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - SAN JUAN - STO NIÑO BYPASS ROAD INCLUDING BRIDGES, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱36.9M | 100% | Medium risk33 | —-0.102 |
| 288 | 19CL0064CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. STO.NIÑO, MUNICIPALITY OF CABANGAN, PROVINCE OF ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱4.9M | 100% | Medium risk33 | —-0.099 |
| 289 | 19CJ0063ASSET PRESERVATION PROGRAM CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS VICTORIA - PURA RD - K0151+561 - K0153 + 581 | Region III | Tarlac DEO | Completed | ₱39.1M | 100% | Medium risk33 | —-0.100 |
| 290 | 18CG0286NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROAD - STA. ANA-ARAYAT BYPASS ROAD, STA. ANA, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱41.6M | 100% | Medium risk33 | —-0.103 |
| 291 | 24CG0061NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - STA. ANA - ARAYAT BYPASS ROAD, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱46.3M | 100% | Medium risk33 | —-0.103 |
| 292 | 19CG0144NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - STA. ANA-ARAYAT BYPASS ROAD, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱37.4M | 100% | Medium risk33 | —-0.104 |
| 293 | 21CL0081CONSTRUCTION OF SLOPE PROTECTION/FLOOD CONTROL, NAYUM RIVER,SANTA CRUZ, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱47M | 100% | Medium risk33 | —-0.081 |
| 294 | 21EA0150CONCRETING OF SITIO ILAYA, BRGY. BALANACAN FMR, BRGY. BALANACAN, MOGPOG, MARINDUQUE | Region IV-B | Marinduque DEO | Completed | ₱12.4M | 100% | Medium risk32 | —-0.040 |
| 295 | 18CL0109CONSTRUCTION OF 4 STOREY 20 CLASSROOM AT CABANGAN NATIONAL HIGH SCHOOL, CABANGAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱40.6M | 100% | Medium risk32 | —-0.035 |
| 296 | 19CG0096REHABILITATION/ IMPROVEMENT OF MEXICO-MAGALANG ROAD / NINOY AQUINO BYWAY, MEXICO, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱37M | 100% | Medium risk32 | —-0.103 |
| 297 | 21CK0030NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING ALONG VICTORIA - LA PAZ ROAD, LA PAZ, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱44.9M | 100% | Medium risk32 | —-0.103 |
| 298 | 22CL0016CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GUISGUIS-MANGATAREM BRIDGE 2, SANTA CRUZ, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱47M | 100% | Medium risk32 | —-0.083 |
| 299 | 18CL0108CONSTRUCTION OF 4 STOREY 20 CLASSROOM SCHOOL BUILDING AT BOTOLAN NATIONAL HIGH SCHOOL, BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱41.1M | 100% | Medium risk32 | —-0.034 |
| 300 | 19CL0030CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL STRUCTURE AT LIPAY RIVER CONTROL (DOWNSTREAM) SOUTH APPROACH, STA. CRUZ, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱47M | 100% | Medium risk32 | —-0.082 |