Contractor dossier
402 projects on file, including joint ventures this contractor is part of.
Total projects
402
Total budget
₱20.4B
Average progress
96.7%
Completion rate
90.8%
Average risk score
40.8
Medium risk on average, out of 100
Flagged as unusual
7
1.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 313 | ₱17.1B | 38.8 | 6 | 96.3% |
| National Capital Region | 58 | ₱2.2B | 49.4 | 0 | 98.6% |
| Region IV-B | 14 | ₱307.1M | 37.0 | 0 | 100.0% |
| Region I | 7 | ₱263.6M | 44.8 | 0 | 100.0% |
| Region IV-A | 6 | ₱139.9M | 49.9 | 0 | 100.0% |
| Region V | 2 | ₱77.3M | 74.0 | 1 | 50.0% |
| Central Office | 1 | ₱260.3M | 77.0 | 0 | 100.0% |
| Region II | 1 | ₱96.5M | 54.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 188 | ₱10.9B | 39.9 | 0 | 98.4% |
| Roads | 111 | ₱5.6B | 40.8 | 2 | 97.2% |
| Buildings and Facilities | 90 | ₱3.4B | 41.7 | 3 | 94.2% |
| Bridges | 7 | ₱305.8M | 39.9 | 1 | 85.7% |
| OTHER | 5 | ₱167.6M | 49.0 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱28.1M | 93.3 | 1 | 0.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25F00066ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - MAKABUBOS BR. (B02741LZ) ALONG MAHARLIKA HIGHWAY, BASUD, CAMARINES NORTE (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱28.1M | 0% | High risk93 | Flagged0.019 |
| 24CM0068NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES, CONSTRUCTION OF SUBIC GENERAL HOSPITAL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱289.5M | 92% | High risk82 | Flagged0.003 |
| 25CM0044CSSP, BIP, MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES STRUCTURAL AND RESILIENCE PROGRAM, CONSTRUCTION OF SUBIC MUNICIPAL HALL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱97.5M | 1% | High risk81 | Flagged0.007 |
| 25CC0189CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BARANGAY SAN FRANCISCO, BULAKAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 89% | High risk81 | —-0.023 |
| 25CM0029CSSP, BIP, MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING PHASE 2, BARANGAY SAN AGUSTIN, CASTILLEJOS, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱147.8M | 78% | High risk80 | —-0.007 |
| 25CM0047CSSP, BIP, MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI-PURPOSE BUILDING, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱58.5M | 20% | High risk79 | —-0.006 |
| 25CM0066CSSP, BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. BARACA-CAMACHILE, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱48.7M | 0% | High risk78 | —-0.003 |
| 25C00520CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)-REHAB. OF ROAD, CANDABA-BALIWAG ROAD (PASIG-POBLACION SECT.) CANDABA, P | Region III | Region III | On-Going | ₱236.4M | 0% | High risk77 | Flagged0.013 |
| 21Z00015REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱260.3M | 100% | High risk77 | —-0.028 |
| 24C00410CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-ACCESS RDS. &/OR BRS. FR. THE NAT;L. RD/S LEAD. TO MAJOR/STRATEGIC PUBLIC BLDGS/FACILITIES-CONST. OF STO. TOMAS-ARAYAT BYPASS ROAD (CANDABA-SAN LUIS SECTION), PROV. OF PAMP. | Region III | Region III | On-Going | ₱189.1M | 0% | High risk76 | Flagged0.016 |
| 25CG0031NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BYPASS AND DIVERSION ROADS - STA. ANA - ARAYAT BY-PASS ROAD, (STA. ANA SECTION) PHASE II, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱91.1M | 98% | High risk74 | —-0.034 |
| 20CK0044CONSTRUCTION OF TRADOC ATF FACILITY, TRADOC, CAMP O'DONNELL, BRGY. STA. LUCIA, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱23.8M | 100% | High risk71 | —-0.067 |
| 25CM0036CSSP SPECIAL ROAD FUND MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD LIGHTING (PHASE II) AT OLONGAPO CITY, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱19.1M | 82% | High risk70 | —-0.035 |
| 25CM0038CSSP - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD LIGHTING, SAN MARCELINO, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱19.1M | 100% | High risk69 | —-0.039 |
| 17CM0030REHAB. OF DAMAGED PAVED ROAD INCL. DRAINAGE, JOSE ABAD SANTOS AVENUE (JASA), OLONGAPO CITY | Region III | Zambales 2nd DEO | Completed | ₱12M | 100% | High risk69 | —-0.065 |
| 17CH0032REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON | Region III | Pampanga 2nd DEO | Completed | ₱27.4M | 100% | High risk69 | —-0.067 |
| 17CM0013REHAB. OF DRAINAGE ALONG SAN MARCELINO-NAGBAYTO RD, K0151+(-1012)-KO151+(-459), SAN MARCELINO, ZAMB. | Region III | Zambales 2nd DEO | Completed | ₱9.4M | 100% | High risk69 | —-0.062 |
| 17CG0024REHABILITATION/IMPROVEMENT OF CABALANTIAN CREEK, BACOLOR, PAMPANGA (RA 9506 BACOLOR REHABILITATION ACT), BACOLOR, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱16.2M | 100% | High risk69 | —-0.059 |
| 17CG0031REHABILITATION/IMPROVEMENT OF BUNGANG GUINTO RIVER, SAN LORENZO, MEXICO, PAMPANGA STA. 0+300 - STA. 0+780, MEXICO, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱24.8M | 100% | High risk68 | —-0.064 |
| 16CK0186NETWORK DEV'T.-OFF-CARRIAGEWAY IMPT INCLUDING DRAINAGE ALONG CONCEPCION-LAPAZ ROAD, CONC AND LAPAZ, | Region III | Tarlac 2nd DEO | Completed | ₱26.8M | 100% | High risk68 | —-0.068 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CM0075CONSTRUCTION OF SCHOOL BUILDING, OLONGAPO CITY ELEMENTARY SCHOOL (PHASE 2), BARANGAY WEST BAJAC-BAJAC, OLONGAPO CITY, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱19.7M | 34% | Medium risk54 | Flagged0.027 |
| 24C00022CONVERGENCE & SPL. SUPPORT PROGRAM-SUSTAINABLE INFRA PROJS. ALLEVIATIING GAPS (SIPAG)-ACCESS RDS. &/OR BRS. FR. THE NAT'L. RD./S LEAD. TO MAJOR/STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF STO. TOMAS-ARAYAT BYPASS RD. (SAN LUIS SECT.) SAN LUIS, PAMPANGA. | Region III | Region III | On-Going | ₱89.8M | 0% | High risk68 | Flagged0.025 |
| 25F00066ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - MAKABUBOS BR. (B02741LZ) ALONG MAHARLIKA HIGHWAY, BASUD, CAMARINES NORTE (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱28.1M | 0% | High risk93 | Flagged0.019 |
| 24C00410CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-ACCESS RDS. &/OR BRS. FR. THE NAT;L. RD/S LEAD. TO MAJOR/STRATEGIC PUBLIC BLDGS/FACILITIES-CONST. OF STO. TOMAS-ARAYAT BYPASS ROAD (CANDABA-SAN LUIS SECTION), PROV. OF PAMP. | Region III | Region III | On-Going | ₱189.1M | 0% | High risk76 | Flagged0.016 |
| 25C00520CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)-REHAB. OF ROAD, CANDABA-BALIWAG ROAD (PASIG-POBLACION SECT.) CANDABA, P | Region III | Region III | On-Going | ₱236.4M | 0% | High risk77 | Flagged0.013 |
| 25CM0044CSSP, BIP, MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES STRUCTURAL AND RESILIENCE PROGRAM, CONSTRUCTION OF SUBIC MUNICIPAL HALL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱97.5M | 1% | High risk81 | Flagged0.007 |
| 24CM0068NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES, CONSTRUCTION OF SUBIC GENERAL HOSPITAL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱289.5M | 92% | High risk82 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 19CM0047REHAB/RECONS/UPGRADING OF DAMAGED PAVED ROADS SECONDARY ROADS, OLONGAPO-BUGALLON ROAD,K0139+000-K0139+714, K0140+000-K0141+757, K0141+981 -K0142+320, K0142+562-K0143+060, K0143+287- K0143+660, K0146+180-K0146+798.4, K0149+877-K0150+303,ZAMBALES | Region III | Zambales 2nd DEO | Completed | ₱91.6M | 100% | Medium risk45 | —-0.086 |
| 127 | 20CL0045CONSTRUCTION OF MISSING LINK/NEW ROADS, STA. CRUZ - MANGATAREM ROAD, PACKAGE 5, ZAMBALES STA. CRUZ, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱91.7M | 100% | Medium risk45 | —-0.082 |
| 128 | 19AH0239CONST'N.OF THREE(3)STOREY-NINE(9)CLASSROOM SB AT BACAYAO SUR ELEM.SCHOOL,DAGUPAN CITY, PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱30.5M | 100% | Medium risk45 | —-0.034 |
| 129 | 23OB0455CONSTRUCTION OF SCHOOL BUILDING (4 STOREY 4 CLASSROOM), PINAGLABANAN ELEMENTARY SCHOOL, SAN JUAN CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱10.6M | 100% | Medium risk44 | —-0.054 |
| 130 | 23CK0112CONSTRUCTION OF CONCRETE SLOPE PROTECTION AND ROAD DIKE ALONG PARUA RIVER, BRGY. SAN VICENTE SECTION, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱67.5M | 100% | Medium risk44 | —-0.026 |
| 131 | 22CL0019CONSTRUCTION OF SLOPE PROTECTION ALONG OLONGAPO-BUGALLON ROAD, SALAZA SECTION (PHASE 4) PALAUIG, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱91.7M | 100% | Medium risk44 | —-0.070 |
| 132 | 18CK0154REPAIR/REHABILITATION/RESTORATION OF DAMAGED SLOPE DIKE ALONG RIO CHICO RIVER (GUEVARRA SECTION, LAPAZ, TARLAC), LAPAZ, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱69.1M | 100% | Medium risk43 | —-0.024 |
| 133 | 17DQ0135CONSTRUCTION OF FOUR (4) STOREY EIGHT (8) CLASSROOM SCHOOL BUILDING AT BAGONG BUHAY ELEMENTARY SCHOOL, SILANG, CAVITE | Region IV-A | Cavite 3rd DEO | Completed | ₱17.5M | 100% | Medium risk43 | —-0.033 |
| 134 | 24CG0188SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF STA. ANA - ARAYAT BYPASS ROAD, PHASE II, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱91.1M | 100% | Medium risk43 | —-0.092 |
| 135 | 23CH0086CONSTRUCTION OF MULT-PURPOSE BUILDING (CONVENTION CENTER) PHASE IV, LUBAO, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱57.9M | 100% | Medium risk43 | —-0.094 |
| 136 | 24CG0129SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF SAN JUAN - SAN PABLO BYPASS ROAD, MEXICO, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱91.1M | 100% | Medium risk42 | —-0.092 |
| 137 | 17CD0272CONSTRUCTION OF 4-STOREY, 8-CLASSROOM SAN JOSE DEL MONTE NAT'L TRADE SCHOOL, CITY OF SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱19.3M | 100% | Medium risk42 | —-0.026 |
| 138 | 20EA0059CONSTRUCTION OF TORRIJOS PUBLIC MARKET (PHASE II), TORRIJOS, MARINDUQUE | Region IV-B | Marinduque DEO | Completed | ₱48.8M | 100% | Medium risk42 | —-0.082 |
| 139 | 20EA0016NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS, MARINDUQUE CIRCUMFERENTIAL RD - K0010+580-K0011+900, MOGPOG, MARINDUQUE | Region IV-B | Marinduque DEO | Completed | ₱47.7M | 100% | Medium risk42 | —-0.085 |
| 140 | 17OE0177CONSTRUCTION OF FOUR STOREY TWENTY CLASSROOM SCHOOL BUILDING (REVISED 3-24-17) PIO DEL PILAR ELEMENTARY SCHOOL, STA. MESA, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱55.3M | 100% | Medium risk42 | —-0.021 |
| 141 | 19CK0051REHABILITATION OF EXISTING DIKE ALONG BANGUT RIVER (STA. LUCIA SECTION, RIGHT SIDE) DOWNSTREAM OF BANGUT BRIDGE, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱91.7M | 100% | Medium risk42 | —-0.075 |
| 142 | 17CD0365CONSTRUCTION OF 4-STOREY, 8-CLASSROOM STO. CRISTO NATIONAL HIGH SCHOOL, CITY OF SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱19.2M | 100% | Medium risk42 | —-0.026 |
| 143 | 20CD0036CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG OBANDO RIVER, PHASE III, OBANDO, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱83.9M | 100% | Medium risk42 | —-0.084 |
| 144 | 18CK0115REHABILITATION/IMPROVEMENT OF EXISTING DIKE ALONG RIO CHICO RIVER, (TALIMUNDOC-MARIMLA SECTION, RIGHT BANK), STA. 0+274.40 TO STA. 0+875, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱91.6M | 100% | Medium risk42 | —-0.081 |
| 145 | 19CM0048NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BYPASS AND DIVERSION ROAD, (INCLUDING ROW), CAWAG-PHILSECO BYPASS ROAD, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | Completed | ₱81.9M | 100% | Medium risk42 | —-0.087 |
| 146 | 18CK0116REHABILITATION/IMPROVEMENT OF EXISTING DIKE ALONG RIO CHICO RIVER (CONFLUENCE OF PARUA RIVER, RIGHT BANK), STA. 0+000 TO STA. (-)0+600, LAPAZ, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱91.7M | 100% | Medium risk42 | —-0.081 |
| 147 | 18CM0079NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CAWAG - PHILSECO BYPASS ROAD, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | Completed | ₱83.2M | 100% | Medium risk42 | —-0.087 |
| 148 | 25CG0122FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION OF ERODED PAMPANGA RIVER AT CANDATING(PHASE I), ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱91.6M | 47% | Medium risk41 | —-0.034 |
| 149 | 18CM0075CONST./UPGRADING/REHAB. OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS, SAN MARCELINO - NAGBAYTO ROAD, K0151+(-999) - K0152+346, SAN MARCELINO, ZAMBALES | Region III | Zambales 2nd DEO | Completed | ₱60.6M | 100% | Medium risk41 | —-0.093 |
| 150 | 21CL0075CONSTRUCTION OF MISSING LINKS/NEW ROADS MANGATAREM-STA. CRUZ ROAD, PACKAGE 6, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱88.4M | 100% | Medium risk41 | —-0.029 |