Contractor dossier
402 projects on file, including joint ventures this contractor is part of.
Total projects
402
Total budget
₱20.4B
Average progress
96.7%
Completion rate
90.8%
Average risk score
40.8
Medium risk on average, out of 100
Flagged as unusual
7
1.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 313 | ₱17.1B | 38.8 | 6 | 96.3% |
| National Capital Region | 58 | ₱2.2B | 49.4 | 0 | 98.6% |
| Region IV-B | 14 | ₱307.1M | 37.0 | 0 | 100.0% |
| Region I | 7 | ₱263.6M | 44.8 | 0 | 100.0% |
| Region IV-A | 6 | ₱139.9M | 49.9 | 0 | 100.0% |
| Region V | 2 | ₱77.3M | 74.0 | 1 | 50.0% |
| Central Office | 1 | ₱260.3M | 77.0 | 0 | 100.0% |
| Region II | 1 | ₱96.5M | 54.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 188 | ₱10.9B | 39.9 | 0 | 98.4% |
| Roads | 111 | ₱5.6B | 40.8 | 2 | 97.2% |
| Buildings and Facilities | 90 | ₱3.4B | 41.7 | 3 | 94.2% |
| Bridges | 7 | ₱305.8M | 39.9 | 1 | 85.7% |
| OTHER | 5 | ₱167.6M | 49.0 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱28.1M | 93.3 | 1 | 0.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25F00066ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - MAKABUBOS BR. (B02741LZ) ALONG MAHARLIKA HIGHWAY, BASUD, CAMARINES NORTE (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱28.1M | 0% | High risk93 | Flagged0.019 |
| 24CM0068NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES, CONSTRUCTION OF SUBIC GENERAL HOSPITAL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱289.5M | 92% | High risk82 | Flagged0.003 |
| 25CM0044CSSP, BIP, MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES STRUCTURAL AND RESILIENCE PROGRAM, CONSTRUCTION OF SUBIC MUNICIPAL HALL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱97.5M | 1% | High risk81 | Flagged0.007 |
| 25CC0189CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BARANGAY SAN FRANCISCO, BULAKAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 89% | High risk81 | —-0.023 |
| 25CM0029CSSP, BIP, MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING PHASE 2, BARANGAY SAN AGUSTIN, CASTILLEJOS, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱147.8M | 78% | High risk80 | —-0.007 |
| 25CM0047CSSP, BIP, MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI-PURPOSE BUILDING, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱58.5M | 20% | High risk79 | —-0.006 |
| 25CM0066CSSP, BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. BARACA-CAMACHILE, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱48.7M | 0% | High risk78 | —-0.003 |
| 25C00520CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)-REHAB. OF ROAD, CANDABA-BALIWAG ROAD (PASIG-POBLACION SECT.) CANDABA, P | Region III | Region III | On-Going | ₱236.4M | 0% | High risk77 | Flagged0.013 |
| 21Z00015REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱260.3M | 100% | High risk77 | —-0.028 |
| 24C00410CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-ACCESS RDS. &/OR BRS. FR. THE NAT;L. RD/S LEAD. TO MAJOR/STRATEGIC PUBLIC BLDGS/FACILITIES-CONST. OF STO. TOMAS-ARAYAT BYPASS ROAD (CANDABA-SAN LUIS SECTION), PROV. OF PAMP. | Region III | Region III | On-Going | ₱189.1M | 0% | High risk76 | Flagged0.016 |
| 25CG0031NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BYPASS AND DIVERSION ROADS - STA. ANA - ARAYAT BY-PASS ROAD, (STA. ANA SECTION) PHASE II, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱91.1M | 98% | High risk74 | —-0.034 |
| 20CK0044CONSTRUCTION OF TRADOC ATF FACILITY, TRADOC, CAMP O'DONNELL, BRGY. STA. LUCIA, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱23.8M | 100% | High risk71 | —-0.067 |
| 25CM0036CSSP SPECIAL ROAD FUND MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD LIGHTING (PHASE II) AT OLONGAPO CITY, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱19.1M | 82% | High risk70 | —-0.035 |
| 25CM0038CSSP - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD LIGHTING, SAN MARCELINO, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱19.1M | 100% | High risk69 | —-0.039 |
| 17CM0030REHAB. OF DAMAGED PAVED ROAD INCL. DRAINAGE, JOSE ABAD SANTOS AVENUE (JASA), OLONGAPO CITY | Region III | Zambales 2nd DEO | Completed | ₱12M | 100% | High risk69 | —-0.065 |
| 17CH0032REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON | Region III | Pampanga 2nd DEO | Completed | ₱27.4M | 100% | High risk69 | —-0.067 |
| 17CM0013REHAB. OF DRAINAGE ALONG SAN MARCELINO-NAGBAYTO RD, K0151+(-1012)-KO151+(-459), SAN MARCELINO, ZAMB. | Region III | Zambales 2nd DEO | Completed | ₱9.4M | 100% | High risk69 | —-0.062 |
| 17CG0024REHABILITATION/IMPROVEMENT OF CABALANTIAN CREEK, BACOLOR, PAMPANGA (RA 9506 BACOLOR REHABILITATION ACT), BACOLOR, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱16.2M | 100% | High risk69 | —-0.059 |
| 17CG0031REHABILITATION/IMPROVEMENT OF BUNGANG GUINTO RIVER, SAN LORENZO, MEXICO, PAMPANGA STA. 0+300 - STA. 0+780, MEXICO, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱24.8M | 100% | High risk68 | —-0.064 |
| 16CK0186NETWORK DEV'T.-OFF-CARRIAGEWAY IMPT INCLUDING DRAINAGE ALONG CONCEPCION-LAPAZ ROAD, CONC AND LAPAZ, | Region III | Tarlac 2nd DEO | Completed | ₱26.8M | 100% | High risk68 | —-0.068 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CM0075CONSTRUCTION OF SCHOOL BUILDING, OLONGAPO CITY ELEMENTARY SCHOOL (PHASE 2), BARANGAY WEST BAJAC-BAJAC, OLONGAPO CITY, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱19.7M | 34% | Medium risk54 | Flagged0.027 |
| 24C00022CONVERGENCE & SPL. SUPPORT PROGRAM-SUSTAINABLE INFRA PROJS. ALLEVIATIING GAPS (SIPAG)-ACCESS RDS. &/OR BRS. FR. THE NAT'L. RD./S LEAD. TO MAJOR/STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF STO. TOMAS-ARAYAT BYPASS RD. (SAN LUIS SECT.) SAN LUIS, PAMPANGA. | Region III | Region III | On-Going | ₱89.8M | 0% | High risk68 | Flagged0.025 |
| 25F00066ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - MAKABUBOS BR. (B02741LZ) ALONG MAHARLIKA HIGHWAY, BASUD, CAMARINES NORTE (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱28.1M | 0% | High risk93 | Flagged0.019 |
| 24C00410CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-ACCESS RDS. &/OR BRS. FR. THE NAT;L. RD/S LEAD. TO MAJOR/STRATEGIC PUBLIC BLDGS/FACILITIES-CONST. OF STO. TOMAS-ARAYAT BYPASS ROAD (CANDABA-SAN LUIS SECTION), PROV. OF PAMP. | Region III | Region III | On-Going | ₱189.1M | 0% | High risk76 | Flagged0.016 |
| 25C00520CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)-REHAB. OF ROAD, CANDABA-BALIWAG ROAD (PASIG-POBLACION SECT.) CANDABA, P | Region III | Region III | On-Going | ₱236.4M | 0% | High risk77 | Flagged0.013 |
| 25CM0044CSSP, BIP, MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES STRUCTURAL AND RESILIENCE PROGRAM, CONSTRUCTION OF SUBIC MUNICIPAL HALL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱97.5M | 1% | High risk81 | Flagged0.007 |
| 24CM0068NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES, CONSTRUCTION OF SUBIC GENERAL HOSPITAL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱289.5M | 92% | High risk82 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 20CM0007CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SUBIC BY-PASS, PACKAGE 2, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | Completed | ₱75.6M | 100% | Medium risk41 | —-0.092 |
| 152 | 25CG0172FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED BANK STRUCTURE ALONG PAMPANGA RIVER (PHASE IV), SAN MATEO, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱91.1M | 0% | Medium risk41 | —-0.020 |
| 153 | 25CG0011FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF ERODED BANK STRUCTURE ALONG PAMPANGA RIVER (PHASE III), SAN MATEO, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱91.1M | 86% | Medium risk41 | —-0.044 |
| 154 | 18CK0090REHABILITATION/IMPROVEMENT OF EXISTING DIKE ALONG RIO CHICO RIVER (LA PURISIMA SECTION), UPSTREAM OF RIO CHICO BRIDGE, LAPAZ, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱91.6M | 100% | Medium risk41 | —-0.075 |
| 155 | 19CG0033REHABILITATION/ IMPROVEMENT OF ERODED PAMPANGA RIVER BANK AT BAMBANG, CANDABA, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱91.5M | 100% | Medium risk41 | —-0.081 |
| 156 | 18CG0116REHABILITATION/IMPROVEMENT OF PAMPANGA RIVER ALONG MANDASIG (PHASE III), CANDABA, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱91.5M | 100% | Medium risk41 | —-0.081 |
| 157 | 18CG0117ERHABILITATION/IMPROVEMENT OF PAMPANGA RIVER ALONG MANDASIG (PHASE IV), CANDABA, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱91.5M | 100% | Medium risk41 | —-0.081 |
| 158 | 24CM0063REHABILITATION OF SAN MARCELINO MULTI-PURPOSE BUILDING, SAN MARCELINO, ZAMBALES | Region III | Zambales 2nd DEO | Completed | ₱49.5M | 100% | Medium risk41 | —-0.093 |
| 159 | 19CG0055CONSTRUCTION/ REHABILITATION OF PAMPANGA RIVER BANK ALONG BRGY. STA. CRUZ, POBLACION, SAN LUIS, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱91.5M | 100% | Medium risk41 | —-0.081 |
| 160 | 23CG0134FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS AT MALASIK RIVER, PHASE II (SAN AGUSTIN SECTION) BARANGAY SAN AGUSTIN, CANDABA, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱91.2M | 100% | Medium risk41 | —-0.077 |
| 161 | 19CL0057CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, IBA BYPASS ROAD (GOVIC HIGHWAY) IBA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱80M | 100% | Medium risk41 | —-0.088 |
| 162 | 24CG0002FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION OF ERODED PAMPANGA RIVER BANK AT SAN MATEO (PHASE I), ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱91.1M | 100% | Medium risk40 | —-0.081 |
| 163 | 16AH0230CONST'N.OF STANDARD FOUR(4)STOREY,TWENTY(20)CL,S/B (DEPED DESIGN)AT SAN JACINTO NHS,SAN JACINTO, PAN | Region I | Pangasinan 2nd DEO | Completed | ₱30.8M | 100% | Medium risk40 | —-0.007 |
| 164 | 24CG0017FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION OF PAMPANGA RIVER ALONG CANDABA, PAMPANGA (MANDASIG - PASIG - LANANG SECTION) | Region III | Pampanga 1st DEO | Completed | ₱91.1M | 100% | Medium risk40 | —-0.081 |
| 165 | 23CG0080FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION WORKS AT MALASIK RIVER, PHASE I (SAN AGUSTIN SECTION) BARANGAY SAN AGUSTIN, CANDABA, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱91.1M | 100% | Medium risk40 | —-0.079 |
| 166 | 20CJ0130CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS CONSTRUCTION OF SAN JOSE, TARLAC-PALAUIG, ZAMBALES ROAD INCLUDING DRAINAGE PHASE 9, SAN JOSE, TARLAC | Region III | Tarlac DEO | Completed | ₱74.9M | 100% | Medium risk40 | —-0.089 |
| 167 | 18CL0072CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO DAMPAY SALAZA ACCESS ROAD LEADNG TO MT. TAPULAO ECOTOURISM PROJECT, PALAUIG, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱65.9M | 100% | Medium risk40 | —-0.092 |
| 168 | 18CK0091CONSTRUCTION OF TWO (2) STOREY DPWH TARLAC 2ND DISTRICT ENGINEERING OFFICE BUILDING INCLUDING SITE DEVELOPMENT AND OTHER FACILITIES, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱83.8M | 100% | Medium risk40 | —-0.087 |
| 169 | 18CJ0176ASSET PRESERVATION PROGRAM CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS ROMULO H-WAY - K0150+812.10 - K0151+902, K0153+750.80 - K0154 + 667, K0154 + 689 - K0155 + 316.50 | Region III | Tarlac DEO | Completed | ₱79.8M | 100% | Medium risk40 | —-0.092 |
| 170 | 23CG0281BASIC INFRASTRUCTURE PROGRAM: MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL), CANDABA, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱69.2M | 100% | Medium risk40 | —-0.095 |
| 171 | 23CG0097SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - REHABILITATION OF RIVER CHANNEL & CONSTRUCTION OF CONCRETE SLOPE PROTECTION OF MALISIK RIVER CONTROL, MAGUMBALI, CAND | Region III | Pampanga 1st DEO | Completed | ₱91.1M | 100% | Medium risk40 | —-0.079 |
| 172 | 17AH0317CONST'N.OF 3 STOREY,9 CL S/B (K TO 10)AT CARANGLAAN ELEM.SCHOOL,DAGUPAN CITY,PANGASINAN | Region I | Pangasinan 2nd DEO | Completed | ₱23.6M | 100% | Medium risk39 | —-0.008 |
| 173 | 24CM0059REHABILITATION OF MULTI-PURPOSE BUILDING (SUBIC SPORTS COMPLEX) INCLUDING FACILITIES, BRGY. WAWANDUE, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | Completed | ₱44.5M | 100% | Medium risk39 | —-0.095 |
| 174 | 25CJ0305CONSTRUCTION OF MULTI-PURPOSE BUILDING (TARLAC CITY CONVENTION HALL), BARANGAY BARAS BARAS, TARLAC CITY, TARLAC (PHASE 7) | Region III | Tarlac DEO | On-Going | ₱49M | 49% | Medium risk39 | —-0.044 |
| 175 | 18CG0284ASSET PRESERVATION PROGRAM: REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE, TERTIARY ROADS, BALIWAG-CANDABA-STA. ANA ROAD - K0066+155 - K0067 + 357, CANDABA, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱79M | 100% | Medium risk39 | —-0.097 |