Contractor dossier
402 projects on file, including joint ventures this contractor is part of.
Total projects
402
Total budget
₱20.4B
Average progress
96.7%
Completion rate
90.8%
Average risk score
40.8
Medium risk on average, out of 100
Flagged as unusual
7
1.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 313 | ₱17.1B | 38.8 | 6 | 96.3% |
| National Capital Region | 58 | ₱2.2B | 49.4 | 0 | 98.6% |
| Region IV-B | 14 | ₱307.1M | 37.0 | 0 | 100.0% |
| Region I | 7 | ₱263.6M | 44.8 | 0 | 100.0% |
| Region IV-A | 6 | ₱139.9M | 49.9 | 0 | 100.0% |
| Region V | 2 | ₱77.3M | 74.0 | 1 | 50.0% |
| Central Office | 1 | ₱260.3M | 77.0 | 0 | 100.0% |
| Region II | 1 | ₱96.5M | 54.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 188 | ₱10.9B | 39.9 | 0 | 98.4% |
| Roads | 111 | ₱5.6B | 40.8 | 2 | 97.2% |
| Buildings and Facilities | 90 | ₱3.4B | 41.7 | 3 | 94.2% |
| Bridges | 7 | ₱305.8M | 39.9 | 1 | 85.7% |
| OTHER | 5 | ₱167.6M | 49.0 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱28.1M | 93.3 | 1 | 0.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25F00066ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - MAKABUBOS BR. (B02741LZ) ALONG MAHARLIKA HIGHWAY, BASUD, CAMARINES NORTE (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱28.1M | 0% | High risk93 | Flagged0.019 |
| 24CM0068NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES, CONSTRUCTION OF SUBIC GENERAL HOSPITAL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱289.5M | 92% | High risk82 | Flagged0.003 |
| 25CM0044CSSP, BIP, MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES STRUCTURAL AND RESILIENCE PROGRAM, CONSTRUCTION OF SUBIC MUNICIPAL HALL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱97.5M | 1% | High risk81 | Flagged0.007 |
| 25CC0189CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BARANGAY SAN FRANCISCO, BULAKAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 89% | High risk81 | —-0.023 |
| 25CM0029CSSP, BIP, MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING PHASE 2, BARANGAY SAN AGUSTIN, CASTILLEJOS, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱147.8M | 78% | High risk80 | —-0.007 |
| 25CM0047CSSP, BIP, MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI-PURPOSE BUILDING, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱58.5M | 20% | High risk79 | —-0.006 |
| 25CM0066CSSP, BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. BARACA-CAMACHILE, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱48.7M | 0% | High risk78 | —-0.003 |
| 25C00520CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)-REHAB. OF ROAD, CANDABA-BALIWAG ROAD (PASIG-POBLACION SECT.) CANDABA, P | Region III | Region III | On-Going | ₱236.4M | 0% | High risk77 | Flagged0.013 |
| 21Z00015REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱260.3M | 100% | High risk77 | —-0.028 |
| 24C00410CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-ACCESS RDS. &/OR BRS. FR. THE NAT;L. RD/S LEAD. TO MAJOR/STRATEGIC PUBLIC BLDGS/FACILITIES-CONST. OF STO. TOMAS-ARAYAT BYPASS ROAD (CANDABA-SAN LUIS SECTION), PROV. OF PAMP. | Region III | Region III | On-Going | ₱189.1M | 0% | High risk76 | Flagged0.016 |
| 25CG0031NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF BYPASS AND DIVERSION ROADS - STA. ANA - ARAYAT BY-PASS ROAD, (STA. ANA SECTION) PHASE II, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱91.1M | 98% | High risk74 | —-0.034 |
| 20CK0044CONSTRUCTION OF TRADOC ATF FACILITY, TRADOC, CAMP O'DONNELL, BRGY. STA. LUCIA, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱23.8M | 100% | High risk71 | —-0.067 |
| 25CM0036CSSP SPECIAL ROAD FUND MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD LIGHTING (PHASE II) AT OLONGAPO CITY, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱19.1M | 82% | High risk70 | —-0.035 |
| 25CM0038CSSP - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD LIGHTING, SAN MARCELINO, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱19.1M | 100% | High risk69 | —-0.039 |
| 17CM0030REHAB. OF DAMAGED PAVED ROAD INCL. DRAINAGE, JOSE ABAD SANTOS AVENUE (JASA), OLONGAPO CITY | Region III | Zambales 2nd DEO | Completed | ₱12M | 100% | High risk69 | —-0.065 |
| 17CH0032REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON | Region III | Pampanga 2nd DEO | Completed | ₱27.4M | 100% | High risk69 | —-0.067 |
| 17CM0013REHAB. OF DRAINAGE ALONG SAN MARCELINO-NAGBAYTO RD, K0151+(-1012)-KO151+(-459), SAN MARCELINO, ZAMB. | Region III | Zambales 2nd DEO | Completed | ₱9.4M | 100% | High risk69 | —-0.062 |
| 17CG0024REHABILITATION/IMPROVEMENT OF CABALANTIAN CREEK, BACOLOR, PAMPANGA (RA 9506 BACOLOR REHABILITATION ACT), BACOLOR, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱16.2M | 100% | High risk69 | —-0.059 |
| 17CG0031REHABILITATION/IMPROVEMENT OF BUNGANG GUINTO RIVER, SAN LORENZO, MEXICO, PAMPANGA STA. 0+300 - STA. 0+780, MEXICO, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱24.8M | 100% | High risk68 | —-0.064 |
| 16CK0186NETWORK DEV'T.-OFF-CARRIAGEWAY IMPT INCLUDING DRAINAGE ALONG CONCEPCION-LAPAZ ROAD, CONC AND LAPAZ, | Region III | Tarlac 2nd DEO | Completed | ₱26.8M | 100% | High risk68 | —-0.068 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CM0075CONSTRUCTION OF SCHOOL BUILDING, OLONGAPO CITY ELEMENTARY SCHOOL (PHASE 2), BARANGAY WEST BAJAC-BAJAC, OLONGAPO CITY, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱19.7M | 34% | Medium risk54 | Flagged0.027 |
| 24C00022CONVERGENCE & SPL. SUPPORT PROGRAM-SUSTAINABLE INFRA PROJS. ALLEVIATIING GAPS (SIPAG)-ACCESS RDS. &/OR BRS. FR. THE NAT'L. RD./S LEAD. TO MAJOR/STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF STO. TOMAS-ARAYAT BYPASS RD. (SAN LUIS SECT.) SAN LUIS, PAMPANGA. | Region III | Region III | On-Going | ₱89.8M | 0% | High risk68 | Flagged0.025 |
| 25F00066ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - MAKABUBOS BR. (B02741LZ) ALONG MAHARLIKA HIGHWAY, BASUD, CAMARINES NORTE (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱28.1M | 0% | High risk93 | Flagged0.019 |
| 24C00410CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-ACCESS RDS. &/OR BRS. FR. THE NAT;L. RD/S LEAD. TO MAJOR/STRATEGIC PUBLIC BLDGS/FACILITIES-CONST. OF STO. TOMAS-ARAYAT BYPASS ROAD (CANDABA-SAN LUIS SECTION), PROV. OF PAMP. | Region III | Region III | On-Going | ₱189.1M | 0% | High risk76 | Flagged0.016 |
| 25C00520CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS)-REHAB. OF ROAD, CANDABA-BALIWAG ROAD (PASIG-POBLACION SECT.) CANDABA, P | Region III | Region III | On-Going | ₱236.4M | 0% | High risk77 | Flagged0.013 |
| 25CM0044CSSP, BIP, MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES STRUCTURAL AND RESILIENCE PROGRAM, CONSTRUCTION OF SUBIC MUNICIPAL HALL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱97.5M | 1% | High risk81 | Flagged0.007 |
| 24CM0068NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES, CONSTRUCTION OF SUBIC GENERAL HOSPITAL, SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱289.5M | 92% | High risk82 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 22CM0062CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, REHABILITATION OF FLOOD MITIGATION AND DRAINAGE SYSTEM OF PAMATAWAN RIVER (SAN AGUSTIN SECTION), STA. 21+974 - STA. 22+374, CASTILLEJOS, ZAMBALES | Region III | Zambales 2nd DEO | Completed | ₱77.2M | 100% | Medium risk37 | —-0.083 |
| 202 | 22CM0061FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, REHABILITATION OF FLOOD MITIGATION AND DRAINAGE SYSTEM OF PAMATAWAN RIVER (LOOC SECTION), STA. 18+690 - STA. 19+090, CASTI | Region III | Zambales 2nd DEO | Completed | ₱77.2M | 100% | Medium risk37 | —-0.083 |
| 203 | 21CG0047NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - STA. ANA - ARAYAT BYPASS ROAD, PACKAGE 3, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱54.2M | 100% | Medium risk37 | —-0.101 |
| 204 | 18EA0125PACKAGE 44-A) CONCRETING OF 0.700 LANE KM. MABUHAY-DUONGAN ROAD, BARANGAY MABUHAY, TORRIJOS, MARINDU | Region IV-B | Marinduque DEO | Completed | ₱16.2M | 100% | Medium risk37 | —-0.086 |
| 205 | 23CD0017CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER CALUMPANG SECTION NORZAGARAY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱57.9M | 100% | Medium risk37 | —-0.090 |
| 206 | 18EA0025CONSTRUCTION OF SUMANGGA FLOOD CONTROL STRUCTURE | Region IV-B | Marinduque DEO | Completed | ₱17.7M | 100% | Medium risk37 | —-0.075 |
| 207 | 18EA0026CONSTRUCTION OF LIBTANGIN FLOOD CONTROL STRUCTURE | Region IV-B | Marinduque DEO | Completed | ₱20.5M | 100% | Medium risk37 | —-0.067 |
| 208 | 21CD0092REHABILITATION / IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG SAN MIGUEL RIVER, MASIPILIT SECTION PHASE I, SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱64.8M | 100% | Medium risk37 | —-0.088 |
| 209 | 23CM0005REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, SAN MARCELINO - NAGBAYTO ROAD, K0151+(-999) - K0152+180, SAN MARCELINO, ZAMBALES | Region III | Zambales 2nd DEO | Completed | ₱39.1M | 100% | Medium risk37 | —-0.097 |
| 210 | 18EA0123CONCRETING OF 5.0 LANE KM. MARANLIG-BANGWAYIN ROAD, BARANGAY BANGWAYIN, TORRIJOS, MARINDUQUE | Region IV-B | Marinduque DEO | Completed | ₱24M | 100% | Medium risk37 | —-0.090 |
| 211 | 18EA0122PACKAGE 42-A) CONCRETING OF 1.5 LANE KM. PAKASKASAN-BANGWAYIN ROAD, BARANGAY PAKASKASAN, TORRIJOS, M | Region IV-B | Marinduque DEO | Completed | ₱19M | 100% | Medium risk37 | —-0.092 |
| 212 | 20CL0033CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, SAN NARCISO BYPASS ROAD (LUCERO-DALIPAWEN-NAMATACAN-GRULLO-LIBERTAD), SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱33.2M | 100% | Medium risk37 | —-0.034 |
| 213 | 19CA0085CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-ANGELES-PORAC-FLORIDABLANCA-DINALUPIHAN-JOSE ABAD SANTOS AVENUE DIVERSION ROAD,DINALUPIHAN, BATAAN | Region III | Bataan 1st DEO | Completed | ₱44.1M | 100% | Medium risk36 | —-0.100 |
| 214 | 23CM0006REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE PRIMARY ROADS - JOSE ABAD SANTOS AVENUE (JASA), K0121+450 - K0121+550, OLONGAPO CITY | Region III | Zambales 2nd DEO | Completed | ₱19.6M | 100% | Medium risk36 | —-0.100 |
| 215 | 22CM0066CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION OF KALAKLAN RIVER, STA. 2+720 - STA. 3+045 (RIGHT SIDE), OLONGAPO CITY | Region III | Zambales 2nd DEO | Completed | ₱77.2M | 100% | Medium risk36 | —-0.085 |
| 216 | 18CL0074CONSTRUCTION OF ROADS, BRGY. PUNDAKIT, SAN ANTONIO, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱28.2M | 100% | Medium risk36 | —-0.097 |
| 217 | 25CK0003ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE - TERTIARY ROAD - ALONG TARLAC-ZAMBALES ROAD, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱50.6M | 100% | Medium risk36 | —-0.099 |
| 218 | 24CK0040REHABILITATION OF EXISTING DIKE ALONG O'DONNELL RIVER, BARANGAY MARUGLU SECTION, RIGHT BANK, (PACKAGE A), CAPAS, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱86.8M | 100% | Medium risk36 | —-0.079 |
| 219 | 20CD0120CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BULO RIVER, STA. LUCIA SECTION, PHASE I, SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱57.3M | 100% | Medium risk36 | —-0.090 |
| 220 | 21CM0022FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION OF STA. RITA RIVER, STA. 5+906.40 - STA. 6+331.20 (LEFT SIDE), OLONGAPO CITY | Region III | Zambales 2nd DEO | Completed | ₱81.2M | 100% | Medium risk36 | —-0.083 |
| 221 | 18CF0074CONCRETE OF SLOPE PROTECTION PAMPANGA RIVER FLOOD CONTROL, STO. TOMAS NORTH, JAEN, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱86.9M | 100% | Medium risk36 | —-0.080 |
| 222 | 20CL0080CONSTRUCTION OF SLOPE PROTECTION ALONG OLONGAPO BUGALLON ROAD SALAZA SECTION K0 223+800 - K0223+844.5, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱37.6M | 100% | Medium risk36 | —-0.094 |
| 223 | 21CK0019CONSTRUCTION OF TRADOC ENLISTED PERSONNEL QUARTERS AT TRADOC CAMP O'DONNELL, BRGY. STA. LUCIA, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱28.9M | 100% | Medium risk36 | —-0.097 |
| 224 | 21CD0066REHABILITATION / IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG BULO RIVER, LAMBAKIN SECTION, BRGY. LAMBAKIN, SAN MIGUEL, BULACAN PHASE II | Region III | Bulacan 2nd DEO | Completed | ₱64.8M | 100% | Medium risk36 | —-0.084 |
| 225 | 21CD0068REHABILITATION / IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG BULO RIVER, STA. LUCIA SECTION, BRGY. STA. LUCIA, SAN MIGUEL, BULACAN PHASE III | Region III | Bulacan 2nd DEO | Completed | ₱64.8M | 100% | Medium risk36 | —-0.087 |