Opening the dossier…
Opening the dossier…
Contractor dossier
130 projects on file, including joint ventures this contractor is part of.
Total projects
130
Total budget
₱11.7B
Average progress
90.4%
Completion rate
83.8%
Average risk score
49.5
Medium risk on average, out of 100
Flagged as unusual
13
10.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-B | 114 | ₱11.4B | 52.3 | 13 | 89.1% |
| Region IV-A | 14 | ₱41.1M | 24.7 | 0 | 100.0% |
| Central Office | 1 | ₱170.2M | 63.4 | 0 | 100.0% |
| National Capital Region | 1 | ₱98.1M | 62.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 92 | ₱9.5B | 50.9 | 6 | 89.6% |
| Flood Control and Drainage | 13 | ₱1B | 47.4 | 3 | 87.3% |
| Buildings and Facilities | 10 | ₱82.9M | 29.7 | 0 | 100.0% |
| Water Provision and Storage | 6 | ₱17.2M | 23.6 | 0 | 100.0% |
| Bridges | 3 | ₱441.9M | 61.0 | 1 | 100.0% |
| GAA 2025 SSP | 2 | ₱192M | 94.9 | 2 | 56.6% |
| GAA 2025 OO-1 | 2 | ₱211.7M | 84.2 | 1 | 91.3% |
| GAA 2025 OO-2 | 1 | ₱49M | 91.2 | 0 | 85.4% |
| Bridges, Roads | 1 | ₱144.7M | 65.4 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25ED0114REHABILITATION OF SUGUI - PALHI ROAD, TIBAG - PACHOCA - WAWA ROAD, CALAPAN CITY, ORIENTAL MINDORO (PHASE 2) | Region IV-B | Mindoro Oriental DEO | On-Going | ₱96M | 57% | High risk95 | Flagged0.029 |
| 25ED0113REHABILITATION OF NAUHAN BEACH ROAD, PAGKAKAISA - BAGONG BUHAY ROAD AND PINAHAN - BUHANGIN - NAG-IBA ROAD, NAUJAN, ORIENTAL MINDORO (PHASE 2) | Region IV-B | Mindoro Oriental DEO | On-Going | ₱96M | 56% | High risk95 | Flagged0.029 |
| 25ED0059CONSTRUCTION OF RIVER PROTECTION DIKE, SITIO MAPALAD MALUANLUAN, POLA, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱49M | 85% | High risk91 | —-0.014 |
| 25ED0072PREVENTIVE MAINTENANCE ALONG CALAPAN SOUTH RD - K0047+462 - K0049+000, SOCORRO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱122.8M | 83% | High risk88 | Flagged0.008 |
| 25ED0069PREVENTIVE MAINTENANCE ALONG CALAPAN SOUTH RD - K004+148 - K0005+415, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱88.9M | 100% | High risk81 | —-0.019 |
| 25E00094BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD MITIGATING STRUCTURE WITH ROAD COMPONENT ALONG MAG-ASAWANG TUBIG RIVERT, BRGY. PINAGSABANGAN I TO BRGY. PINAGSABANGAN II, NAUJAN, | Region IV-B | Region IV-B | On-Going | ₱151.1M | 72% | High risk78 | Flagged0.008 |
| 25E00123SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. ZONE III, STA. 000+290-STA. 000+620; STA. 000+660-STA. 000+813.50, PINAMALAYAN, O | Region IV-B | Region IV-B | On-Going | ₱230.8M | 35% | High risk73 | Flagged0.010 |
| 25E00122SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTYAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. ZONE III-BRGY. QUINABIGAN, PINAMALAYAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231M | 36% | High risk73 | Flagged0.010 |
| 25E00236SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. MONTEMAYOR, STA. 000+000-STA. 000+430.55, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231M | 38% | High risk73 | Flagged0.008 |
| 25E00233SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. MELGAR B-BRGY. MASAGUING, STA. 001+760-STA. 002+203.20, NAUJAN, OR.MINDORO | Region IV-B | Region IV-B | On-Going | ₱230.9M | 32% | High risk72 | Flagged0.010 |
| 25E00234SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. MELGAR B, STA. 001+280-STA. 001+759.95, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231M | 34% | High risk72 | Flagged0.010 |
| 25E00201SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. SALVACION-BRGY. MALAWAAN, STA. 000+000-STA. 000+395.38, RIZAL, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱230.8M | 31% | High risk72 | Flagged0.014 |
| 25E00189FLOOD MANAGEMENT PROGRAM- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF FLOOD MITIGATION STRUCTURES ALONG AMNAY RIVER, STA. 000+600-STA. 000+956.28, SABLAYAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱185M | 0% | High risk68 | Flagged0.010 |
| 17E00013IMPROVEMENT/WIDENING OF CALAPAN SOUTH ROAD SECT 1. K0147+240 - K0147+483; SECT 2. K0147+700-K0148+380; SECT 3. K0149+120-K0149+400; SECT. 4. K0149+680-K0149+900, MANSALAYA, ORIENTAL MINDORO | Region IV-B | Region IV-B | Completed | ₱117M | 100% | High risk68 | —-0.042 |
| 22E00165CLUSTER 12: CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, ORIENTAL MINDORO, 12.1: CONST. OF BALITE R/C, BRGY. MALAMIG SECT., STA. 0+000-STA. 0+308.60; 12.2: CONST. OF CAWACAT R/C, TABUK SECT., BULALACAO, STA.0+000-STA. 0+324.3; 1 | Region IV-B | Region IV-B | On-Going | ₱289.5M | 62% | High risk67 | Flagged0.022 |
| 24E00187FLOOD MANAGEMENT PROGRAM- CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE ALONG BONGABONG RIVER, BRGY. LISAP, BONGABONG, OR. MINDORO | Region IV-B | Region IV-B | Completed | ₱193M | 100% | High risk66 | —-0.044 |
| 22E00009CONST. OF MISSING LINKS/NEW ROADS - VICTORIA SABLAYAN (MINDORO CROSS ISLAND ROAD), PACKAGE I, STA. 0+0472.90-STA. 0+670.30; STA. 0+670.30-STA. 0+771.30, ORIENTAL MINDORO | Region IV-B | Region IV-B | Completed | ₱144.7M | 100% | High risk65 | —-0.050 |
| 18E00070CONST. OF MISSING LINK/NEW ROADS: VICTORIA-SABLAYAN (MINDORO CROSS ISLAND ROAD), PACKAGE I, INCLUDING BRIDGE, STA. 2+959.90-STA. 3+454.20, BRIDGE LENGTH= 494.30 L.M.; STA. 3+454.20-STA. 3+470, APPROACH B LENGTH= 15.80 L.M., VICTORIA, OR. MINDORO | Region IV-B | Region IV-B | Completed | ₱237.3M | 100% | High risk65 | Flagged0.002 |
| 20E00110PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) MINDORO WEST COASTAL ROAD K0254+000.00 - K0254+046.00; K0255+363.00 - K0255+396.00; K0255+600.00 - K0261+923.00 | Central Office | Roads Management Cluster I (Bilateral) | Completed | ₱170.2M | 100% | High risk63 | —-0.097 |
| 25E00194SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. IRIRON, STA. 000+000-STA. 000+380.50, CALINTAAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231M | 33% | High risk63 | —-0.018 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25ED0114REHABILITATION OF SUGUI - PALHI ROAD, TIBAG - PACHOCA - WAWA ROAD, CALAPAN CITY, ORIENTAL MINDORO (PHASE 2) | Region IV-B | Mindoro Oriental DEO | On-Going | ₱96M | 57% | High risk95 | Flagged0.029 |
| 25ED0113REHABILITATION OF NAUHAN BEACH ROAD, PAGKAKAISA - BAGONG BUHAY ROAD AND PINAHAN - BUHANGIN - NAG-IBA ROAD, NAUJAN, ORIENTAL MINDORO (PHASE 2) | Region IV-B | Mindoro Oriental DEO | On-Going | ₱96M | 56% | High risk95 | Flagged0.029 |
| 22E00165CLUSTER 12: CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, ORIENTAL MINDORO, 12.1: CONST. OF BALITE R/C, BRGY. MALAMIG SECT., STA. 0+000-STA. 0+308.60; 12.2: CONST. OF CAWACAT R/C, TABUK SECT., BULALACAO, STA.0+000-STA. 0+324.3; 1 | Region IV-B | Region IV-B | On-Going | ₱289.5M | 62% | High risk67 | Flagged0.022 |
| 25E00201SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. SALVACION-BRGY. MALAWAAN, STA. 000+000-STA. 000+395.38, RIZAL, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱230.8M | 31% | High risk72 | Flagged0.014 |
| 25E00233SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. MELGAR B-BRGY. MASAGUING, STA. 001+760-STA. 002+203.20, NAUJAN, OR.MINDORO | Region IV-B | Region IV-B | On-Going | ₱230.9M | 32% | High risk72 | Flagged0.010 |
| 25E00234SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. MELGAR B, STA. 001+280-STA. 001+759.95, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231M | 34% | High risk72 | Flagged0.010 |
| 25E00123SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. ZONE III, STA. 000+290-STA. 000+620; STA. 000+660-STA. 000+813.50, PINAMALAYAN, O | Region IV-B | Region IV-B | On-Going | ₱230.8M | 35% | High risk73 | Flagged0.010 |
| 25E00189FLOOD MANAGEMENT PROGRAM- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF FLOOD MITIGATION STRUCTURES ALONG AMNAY RIVER, STA. 000+600-STA. 000+956.28, SABLAYAN, OCC. MINDORO | Region IV-B | Region IV-B | On-Going | ₱185M | 0% | High risk68 | Flagged0.010 |
| 25E00122SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTYAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. ZONE III-BRGY. QUINABIGAN, PINAMALAYAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231M | 36% | High risk73 | Flagged0.010 |
| 25E00236SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES- CONST. OF COASTAL ROAD/SHORE PROTECTION ALONG BRGY. MONTEMAYOR, STA. 000+000-STA. 000+430.55, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | On-Going | ₱231M | 38% | High risk73 | Flagged0.008 |
| 25E00094BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF FLOOD MITIGATING STRUCTURE WITH ROAD COMPONENT ALONG MAG-ASAWANG TUBIG RIVERT, BRGY. PINAGSABANGAN I TO BRGY. PINAGSABANGAN II, NAUJAN, | Region IV-B | Region IV-B | On-Going | ₱151.1M | 72% | High risk78 | Flagged0.008 |
| 25ED0072PREVENTIVE MAINTENANCE ALONG CALAPAN SOUTH RD - K0047+462 - K0049+000, SOCORRO, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱122.8M | 83% | High risk88 | Flagged0.008 |
| 18E00070CONST. OF MISSING LINK/NEW ROADS: VICTORIA-SABLAYAN (MINDORO CROSS ISLAND ROAD), PACKAGE I, INCLUDING BRIDGE, STA. 2+959.90-STA. 3+454.20, BRIDGE LENGTH= 494.30 L.M.; STA. 3+454.20-STA. 3+470, APPROACH B LENGTH= 15.80 L.M., VICTORIA, OR. MINDORO | Region IV-B | Region IV-B | Completed | ₱237.3M | 100% | High risk65 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 18ED0013ASPHALT OVERLAY 50MM WITH CORRECTION ALONG CALAPAN AIRPORT ROAD CHAINAGE 000 - CHAINAGE 363, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱4.1M | 100% | Low risk22 | —-0.089 |
| 127 | 20DD0169LOCAL PROGRAM, CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, WATER MANAGEMENT FACILITIES, WATER SUPPLY, CONSTRUCTION OF WATER SYSTEM - LEVEL III, MABINI ELEMENTARY SCHOOL, BARANGAY MABINI, LIPA CITY, | Region IV-A | Batangas 4th DEO | Completed | ₱1.9M | 100% | Low risk18 | —-0.069 |
| 128 | 17ED0128REPAIR/REHABILITATION/IMPROVEMENT (ASPHALT OVERLAY) OF CALAPAN NORTH ROAD K0050+984 - K0051+110, PUERTO GALERA, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱1.9M | 100% | Low risk17 | —-0.002 |
| 129 | 19DD0281LOCAL PROGRAM, BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/ FACILITIES- CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, REHABILITATION/IMPROVEMENT OF MULTIPURPOSE FACILITIES AT SAN SEBASTIAN ELEMENTA | Region IV-A | Batangas 4th DEO | Completed | ₱1.9M | 100% | Low risk15 | —-0.103 |
| 130 | 19DD0222LOCAL PROGRAM, BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/ FACILITIES- CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, REHABILITATION/IMPROVEMENT OF MULTIPURPOSE BUILDING (DAYCARE) AT BARANGAY STO. | Region IV-A | Batangas 4th DEO | Completed | ₱1.9M | 100% | Low risk15 | —-0.103 |