Contractor dossier
34 projects on file, including joint ventures this contractor is part of.
Total projects
34
Total budget
₱614.4M
Average progress
98.0%
Completion rate
88.2%
Average risk score
46.8
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 34 | ₱614.4M | 46.8 | 0 | 98.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 26 | ₱515.1M | 46.8 | 0 | 98.2% |
| Roads | 3 | ₱52.4M | 45.9 | 0 | 100.0% |
| Bridges | 2 | ₱19M | 48.4 | 0 | 100.0% |
| Water Provision and Storage | 2 | ₱7.5M | 24.9 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱20.3M | 91.2 | 0 | 80.5% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IG0047ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - TACLOBAN-BAYBAY - SOUTH RD - K0987+468-K0987+498, K1001+275-K1001+305 | Region VIII | Leyte 5th DEO | On-Going | ₱20.3M | 81% | High risk91 | —-0.000 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25IG0047ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - TACLOBAN-BAYBAY - SOUTH RD - K0987+468-K0987+498, K1001+275-K1001+305 | Region VIII | Leyte 5th DEO | On-Going | ₱20.3M | 81% | High risk91 | —-0.000 |
| 2 | 22IA0085CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE BILIRAN CIRCUMFERENTIAL ROAD - K1074+950 - K1075+220 (11.611093, 124.563013 TO 11.608852, 124.562516) | Region VIII | Biliran DEO | Completed | ₱38.1M | 100% | Medium risk49 | —-0.090 |
| 3 | 22IA0131REPAIR/REHABILITATION OF PERMANENT BRIDGE DAMAGED BY TYPHOON ODETTE - BOOL BRIDGE, CULABA, BILIRAN 11.67342817° N, 124.5207435° E | Region VIII | Biliran DEO | Completed | ₱9.5M | 100% | Medium risk48 | —-0.061 |
| 4 | 22IA0132REPAIR/REHABILITATION OF PERMANENT BRIDGE DAMAGED BY TYPHOON ODETTE - CALAMBIS BRIDGE, CAIBIRAN, BILIRAN 11.57497 N, 124.56384 E | Region VIII | Biliran DEO | Completed | ₱9.5M | 100% | Medium risk48 | —-0.062 |
| 5 | 24IA0065CONSTRUCTION OF ALMERIA FLOOD CONTROL STRUCTURE ALONG BILIRAN CIRCUMFERENTIAL ROAD, PHASE 2, ALMERIA, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱28.7M | 90% | Medium risk47 | —-0.030 |
| 6 | 23IA0068CONSTRUCTION OF BAGONGBONG FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD, PHASE V, ALMERIA, BILIRAN | Region VIII | Biliran DEO | Completed | ₱14.7M | 100% | Medium risk47 | —-0.082 |
| 7 | 25IA0083CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY AGPANGI, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱29.3M | 79% | Medium risk47 | —-0.040 |
| 8 | 23IA0021CONSTRUCTION OF CARAYCARAY FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD, PHASE V, NAVAL, BILIRAN (124.41571°, 11.55785° TO 124.41736°, 11.55821°), CARAYCARAY, NAVAL, BILIRAN PROVINCE | Region VIII | Biliran DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.082 |
| 9 | 22IA0025CONSTRUCTION OF CARAYCARAY FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD, NAVAL, BILIRAN 0+684 TO 0+966 (LEFT BANK UPSTREAM (124.4133333°, 11.55833333° TO 124.4158333°, 11.60722222° | Region VIII | Biliran DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.083 |
| 10 | 24IA0009CONSTRUCTION OF CARAYCARAY FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD, PHASE VII, NAVAL, BILIRAN | Region VIII | Biliran DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.083 |
| 11 | 22IA0045CONSTRUCTION OF BAGONGBONG FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD, ALMERIA, BILIRAN (124.383289°, 11.610992° - 124.385009, 11.610814°; 124.393246°, 11.615214° - 124.393602, 11.616887°) | Region VIII | Biliran DEO | On-Going | ₱23.4M | 84% | Medium risk47 | —-0.014 |
| 12 | 23IA0090CONSTRUCTION OF BAGOMBONG FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD, PHASE 5, ALMERIA, BILIRAN | Region VIII | Biliran DEO | Completed | ₱19.6M | 100% | Medium risk47 | —-0.083 |
| 13 | 21IA0028REHABILITATION OF CARAYCARAY FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD (124.55998, 11.41286 TO 124.41359, 11.5583) 0+480 TO 0+710 (RIGHT SIDE UPSTREAM), CARAYCARAY, NAVAL, PROVINCE OF BILIRAN | Region VIII | Biliran DEO | Completed | ₱24M | 100% | Medium risk47 | —-0.083 |
| 14 | 21IA0029CONSTRUCTION OF FLOOD PROTECTION STRUCTURE, BRGY. CARAYCARAY (124.41446, 11.55741 TO 124.41598, 11.55767 ) 0+858 TO 1+048 (RIGHT BANK UPSTREAM), CARAYCARAY, NAVAL, PROVINCE OF BILIRAN | Region VIII | Biliran DEO | Completed | ₱20.1M | 100% | Medium risk47 | —-0.083 |
| 15 | 22IA0082CONSTRUCTION OF CABADIANGAN FLOOD CONTROL ALONG NAVAL-CAIBIRAN CROSS COUNTRY ROAD, NAVAL, BILIRAN (124.460727, 11.581567 - 124.460902, 11.581835) | Region VIII | Biliran DEO | Completed | ₱14.2M | 100% | Medium risk47 | —-0.082 |
| 16 | 22IA0055CONSTRUCTION OF LAWAAN FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD, PHASE 2, CABUCGAYAN, BILIRAN (124.517888°, 11.477469° - 124.517594°, 11.475783°) | Region VIII | Biliran DEO | Completed | ₱14.2M | 100% | Medium risk47 | —-0.082 |
| 17 | 22IA0054CONSTRUCTION OF LAWAAN FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD, CABUCGAYAN, BILIRAN (124.518091°, 11.477474° - 124.519210°, 11.479873°) | Region VIII | Biliran DEO | Completed | ₱28.5M | 100% | Medium risk47 | —-0.083 |
| 18 | 24IA0021CONSTRUCTION OF GUERON FLOOD CONTROL ALONG NAVAL-CAIBIRAN CROSS COUNTRY ROAD, PHASE I, NAVAL, BILIRAN | Region VIII | Biliran DEO | Completed | ₱26.6M | 100% | Medium risk47 | —-0.082 |
| 19 | 23IA0018CONSTRUCTION OF BUSALI FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD, PHASE VI, BILIRAN, BILIRAN (124.453730°, 11.495401° - 124.454642°, 11.495455°) | Region VIII | Biliran DEO | Completed | ₱19.6M | 100% | Medium risk47 | —-0.082 |
| 20 | 23IA0022CONSTRUCTION OF LAWAAN FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD, PHASE III, CABUCGAYAN, BILIRAN (124.517723°, 11.475791° - 124.517777°, 11.476355°) | Region VIII | Biliran DEO | Completed | ₱19M | 100% | Medium risk47 | —-0.083 |
| 21 | 22IA0097CONSTRUCTION OF ALAWIHAW FLOOD CONTROL ALONG NAVAL-CAIBIRAN CROSS COUNTRY ROAD, NAVAL, BILIRAN (124.459677, 11.579385 - 12 | Region VIII | Biliran DEO | Completed | ₱19M | 100% | Medium risk47 | —-0.083 |
| 22 | 22IA0008REHABILITATION OF AÑOG FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD, PHASE 3, CABUCGAYAN, BILIRAN (124.564202°, 11.48048 | Region VIII | Biliran DEO | Completed | ₱14M | 100% | Medium risk47 | —-0.081 |
| 23 | 22IA0009REHABILITATION OF AÑOG FLOOD CONTROL ALONG BILIRAN CIRCUMFERENTIAL ROAD, PHASE 4, CABUCGAYAN, BILIRAN (124.563499°, 11.48243 | Region VIII | Biliran DEO | Completed | ₱14M | 100% | Medium risk47 | —-0.081 |
| 24 | 22IA0007CONSTRUCTION OF AÑOG FLOOD CONTROL STRUCTURE ALONG BILIRAN CIRCUMFERENTIAL ROAD (CABUCGAYAN-BILIRAN SECTION), CABUCGAYAN, BILIRAN (124.563333°, 11.484601° - 124.563326°, 11.484566°) | Region VIII | Biliran DEO | Completed | ₱28.1M | 100% | Medium risk47 | —-0.082 |
| 25 | 22IA0066CONSTRUCTION OF CABIBIHAN FLOOD CONTROL, BRGY. CABIBIHAN, CAIBIRAN, BILIRAN (124.556374°, 11.576766° - 124.554189°, 11.575158°) | Region VIII | Biliran DEO | Completed | ₱19.6M | 100% | Medium risk47 | —-0.082 |