Contractor dossier
400 projects on file, including joint ventures this contractor is part of.
Total projects
400
Total budget
₱21.1B
Average progress
97.4%
Completion rate
91.5%
Average risk score
51.4
Medium risk on average, out of 100
Flagged as unusual
23
5.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Negros Island Region | 248 | ₱9.1B | 48.3 | 4 | 99.8% |
| Region VI | 71 | ₱4B | 56.6 | 9 | 93.3% |
| National Capital Region | 17 | ₱1.2B | 55.0 | 3 | 93.6% |
| Region IV-A | 17 | ₱1.1B | 54.4 | 0 | 100.0% |
| Region IV-B | 10 | ₱1.8B | 57.7 | 0 | 100.0% |
| Region VIII | 9 | ₱715.4M | 58.4 | 0 | 97.1% |
| Region VII | 8 | ₱1.1B | 63.4 | 5 | 55.7% |
| Region XI | 5 | ₱481M | 59.6 | 0 | 100.0% |
| Region X | 4 | ₱232M | 52.4 | 0 | 99.3% |
| Region IX | 3 | ₱376.1M | 69.3 | 2 | 100.0% |
| Region III | 3 | ₱431.7M | 50.6 | 0 | 100.0% |
| Region XIII | 3 | ₱289.5M | 43.8 | 0 | 100.0% |
| Region II | 2 | ₱193M | 54.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 143 | ₱8.7B | 52.4 | 4 | 97.9% |
| Flood Control and Drainage | 110 | ₱7.2B | 55.1 | 8 | 96.4% |
| Buildings and Facilities | 87 | ₱2.5B | 40.2 | 3 | 98.0% |
| Bridges | 39 | ₱1.1B | 49.1 | 2 | 99.4% |
| OTHER | 16 | ₱1.4B | 76.8 | 6 | 95.6% |
| GAA 2025 OO-1 | 2 | ₱99.2M | 94.2 | 0 | 87.7% |
| Water Provision and Storage | 2 | ₱97.5M | 48.0 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱35.1M | 87.0 | 0 | 59.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GM0004RECONSTRUCTION TO CONCRETE PAVEMENT - BACOLOD SOUTH RD (KABANKALAN-HINOBAAN SECTION) - K0177+900 - K0179+730, K0182+645 - K0182+903, SIPALAY CITY AND HINOBAAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱53.1M | 89% | High risk95 | —-0.004 |
| 25G00010REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - PANGANTA BR. (B00356PN) ALONG ILOILO-ANTIQUE RD | Region VI | Region VI | On-Going | ₱46.1M | 87% | High risk94 | —-0.002 |
| 24G00129CONSTRUCTION OF NEW COLLEGE OF LAW BUILDING, UP VISAYAS ILOILO- UNIVERSITY OF THE PHILIPPINES SYSTEM | Region VI | Region VI | On-Going | ₱99.5M | 59% | High risk92 | Flagged0.071 |
| 24GK0232CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALULAN RIVER, MANAPLA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱144.7M | 90% | High risk90 | Flagged0.054 |
| 25GO0029CONSTRUCTION OF REVETMENT, SUM-AG RIVER, BARANGAY SUM-AG, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱35.1M | 59% | High risk87 | —-0.012 |
| 24G00049CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG PANAY RIVER BASIN, BARANGAY STO. NIÑO, DUMALAG, CAPIZ | Region VI | Region VI | On-Going | ₱283.1M | 82% | High risk84 | Flagged0.035 |
| 18GP0111SIGMA BY-PASS ROAD INCL.ROW, CAPIZ | Region VI | Capiz 2nd DEO | Completed | ₱82.5M | 100% | High risk81 | —-0.022 |
| 23HK0064SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SHORE PROTECTION/SEAWALL, BRGY. CAPIÑAHAN, BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 100% | High risk81 | Flagged0.013 |
| 18GL0061CONSTRUCTION OF BINALBAGAN RIVER BANK SLOPE PROTECTION (UPSTREAM OF BINALBAGANBAGACAY BRIDGE) ALONG HINIGARAN- ISABELA ROAD, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱91.3M | 100% | High risk76 | —-0.024 |
| 19GM0003RECONSTRUCTION TO CONCRETE PAVEMENT/ASPHALT OVERLAY - AT SPECIFIC LOCATIONS ALONG BACOLOD SOUTH RD (S00274NR) K0084+(-179) - K0084+512, K0084+512 - K0085+070, K0085+217 - K0085+608, K0087+786 - K0088+235, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱49M | 100% | High risk76 | —-0.034 |
| 17RC0022REHABILITATION/RECONSTRUCTION OF NATIONALROADS WITH SLIPS, SOIL COLLAPSE AND LAND SLIDE ALONG VALLEHERMOSO-CANLA-ON CITY-LA CASTELLANA ROAD, LA CASTELLANA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱48.2M | 100% | High risk75 | —-0.034 |
| 19GM0053CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, NRJ LEADING TO SUGAR BEACH RESORT AND LANGUB BEACH RESORT, BRGY. NAUHANG, SIPALAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱39.2M | 100% | High risk74 | —-0.033 |
| 17RA0048CONSTRUCTION/UPGRADING/ REHABILITATION OFDRAINAGE ALONG PLAZA CAPITOL ROAD K0001+ (-650)TO K0001+300, BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱19.6M | 100% | High risk74 | —-0.030 |
| 17RA0044CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG BACOLOD NORTH RD., K0001+670-K0003+620, K0003+629-K0004+267 BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱34.2M | 100% | High risk74 | —-0.012 |
| 20GO0107WIDENING/ IMPROVEMENT/ UPGRADING OF HONORATA MANALO ( BURI ROAD), BRGY. MANDALAGAN , BACOLOD CITY | Negros Island Region | Bacolod City DEO | Terminated | ₱10.6M | 100% | High risk74 | Flagged0.002 |
| 17R00030CONSTRUCTION OF TOURISM WATER (TOUWA) SUPPLY IN MURCIA, NEGROS OCCIDENTAL, MURCIA, NEGROS OCCIDENTAL 3RD LD | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱95.5M | 100% | High risk74 | —-0.017 |
| 21GN0063ROAD WIDENING - DON JORGE ARANETA - AYUNGON - YUNGUE - GURREA - LA CARLOTA CITY (S00208NR) - CHAINAGE 2900 - CHAINAGE 4150, LA CARLOTA CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱39.4M | 100% | High risk74 | —-0.033 |
| 22GO0093OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING / CONSTRUCTION ALONG BACOLOD-CITY BDRY RD (S00096NR) K0006 + 220 - K0007 + 130, K0008 + 605 - K0008 + 989, K0009 + 228 - K0009 + 798 | Negros Island Region | Bacolod City DEO | Completed | ₱19.6M | 100% | High risk74 | —-0.016 |
| 23HO0315CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT PUROK BALANGHOY, BARANGAY YLAYA, | Region VII | Cebu 7th DEO | On-Going | ₱38.3M | 0% | High risk74 | Flagged0.063 |
| 24G00145CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE I), STA. BARBARA, ILOILO | Region VI | Region VI | On-Going | ₱98.1M | 1% | High risk72 | Flagged0.063 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24G00129CONSTRUCTION OF NEW COLLEGE OF LAW BUILDING, UP VISAYAS ILOILO- UNIVERSITY OF THE PHILIPPINES SYSTEM | Region VI | Region VI | On-Going | ₱99.5M | 59% | High risk92 | Flagged0.071 |
| 24G00145CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE I), STA. BARBARA, ILOILO | Region VI | Region VI | On-Going | ₱98.1M | 1% | High risk72 | Flagged0.063 |
| 23HO0315CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT PUROK BALANGHOY, BARANGAY YLAYA, | Region VII | Cebu 7th DEO | On-Going | ₱38.3M | 0% | High risk74 | Flagged0.063 |
| 24GK0232CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALULAN RIVER, MANAPLA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱144.7M | 90% | High risk90 | Flagged0.054 |
| 18OE0269CONSTRUCTION OF FOUR (4) STOREY TWENTY EIGHT (28) CLASSROOM SCHOOL BUILDING AT MABINI ELEMENTARY SCHOOL QUIAPO, MANILA CITY (BASED ON 2017 PLAN, REVISED 3-24-17) | National Capital Region | North Manila DEO | Completed | ₱221M | 100% | High risk71 | Flagged0.052 |
| 24GR0001CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL), MINA, ILOILO | Region VI | Iloilo 6th DEO | On-Going | ₱59.3M | 27% | High risk68 | Flagged0.045 |
| 24G00049CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG PANAY RIVER BASIN, BARANGAY STO. NIÑO, DUMALAG, CAPIZ | Region VI | Region VI | On-Going | ₱283.1M | 82% | High risk84 | Flagged0.035 |
| 22O00105ACTIVE TRANSPORT BIKE SHARE SYSTEM AND SAFE PATHWAYS PROGRAM IN METROPOLITAN AREAS - CONSTRUCTION OF PUBLIC TRANSPORT STOPS AND ESTABLISHMENT OF END-OF-TRIP FACILITIES | National Capital Region | National Capital Region | On-Going | ₱40.7M | 2% | Medium risk50 | Flagged0.034 |
| 23H00053OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGMT. PROG., CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF LOBOC RIVER CONTROL STRUCTURE, TAMBANGAN SECTION (LEFT SIDE), LOAY, BOHOL | Region VII | Region VII | On-Going | ₱236.4M | 0% | High risk67 | Flagged0.033 |
| 23H00054OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGMT. PROG., CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF LOBOC RIVER CONTROL STRUCTURE, TAMBANGAN SECTION (RIGHT SIDE), LOAY, BOHOL | Region VII | Region VII | On-Going | ₱236.3M | 0% | High risk67 | Flagged0.033 |
| 23HL0110ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF PALINPINON RIVER CONTROL, VALENCIA, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | On-Going | ₱96.5M | 100% | High risk72 | Flagged0.026 |
| 22O00107ACTIVE TRANSPORT BIKE SHARE SYSTEM AND SAFE PATHWAYS PROGRAM IN METROPOLITAN AREAS MAINTENANCE AND UPGRADING OF ACTIVE TRANSPORT INFRASTRUCTURE PHASE I | National Capital Region | National Capital Region | On-Going | ₱105.9M | 90% | High risk65 | Flagged0.022 |
| 19J00083CONSTRUCTION OF NEW BRIDGE- ALONG LABANGAN-PAGADIAN CITY-DUMALINAO ROAD | Region IX | Region IX | On-Going | ₱93.6M | 100% | High risk72 | Flagged0.018 |
| 23H00012OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROG, CONSTN/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF LOBOC RIVER CONTROL STRUCTURE, UGPONG SECTION, LOBOC, BOHOL | Region VII | Region VII | On-Going | ₱214.5M | 62% | High risk67 | Flagged0.017 |
| 21G00059BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 2, SEGMENT 3, PACKAGE A, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱161.8M | 35% | High risk63 | Flagged0.014 |
| 21G00030ROAD WIDENING - BACOLOD NORTH RD K0113+429 - K0114+582 | Region VI | Region VI | On-Going | ₱46M | 0% | Medium risk47 | Flagged0.013 |
| 23HK0064SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SHORE PROTECTION/SEAWALL, BRGY. CAPIÑAHAN, BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 100% | High risk81 | Flagged0.013 |
| 23G00041BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 1, SEGMENT 3, PHASE 3, TALISAY CITY, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱100.4M | 78% | High risk62 | Flagged0.009 |
| 21J00035BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF THE MULTI-PURPOSE FACILITY (GYMNASIUM), DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR | Region IX | Region IX | On-Going | ₱181.5M | 100% | High risk65 | Flagged0.004 |
| 18G00093REHABILITATION OF SHORE PROTECTION IN BRGYS. CANJUSA AND TAPONG | Region VI | Region VI | Completed | ₱11.9M | 100% | High risk65 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 251 | 18RA0033WIDENING OF LOYGOY BRIDGE2 (B00337NR) ALONG BACOLOD CITY BOUNDARY ROAD, BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱19.5M | 100% | Medium risk46 | —-0.060 |
| 252 | 19GK0051WIDENING OF BRIDGE - PANDANON BR. (B00302NR) ALONG BACOLOD-MURCIA-DS BENEDICTO-SN CARLOS CITY RD | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱21.2M | 100% | Medium risk46 | —-0.060 |
| 253 | 20GF0076REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - GUIMBAL-IGBARAS-TUBUNGAN-LEON RD. K0058+594- K0058+695 | Region VI | Iloilo 1st DEO | Completed | ₱31.9M | 100% | Medium risk46 | —-0.083 |
| 254 | 18GK0032ROAD CONCRETING OF ACCESS ROAD LEADING TO IMBANG SAN FERNANDO-BAYUSAN TAMBARA ROAD, BRGY. SAN FERNANDO, TALISAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱46.3M | 100% | Medium risk46 | —-0.090 |
| 255 | 20GK0198CONSTRUCTION OF BRIDGE - CONSTRUCTION OF MATAB-ANG BRIDGE INCLUDING APPROACHES, TALISAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱24.7M | 100% | Medium risk46 | —-0.053 |
| 256 | 18RA0032WIDENING OF LOYGOY BRIDGE 1(B00336NR) ALONG BACOLOD CITY BOUNDARY ROAD, BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱17.7M | 100% | Medium risk46 | —-0.055 |
| 257 | 19GK0052WIDENING OF BRIDGE - SUM-AG BR. (B00385NR) ALONG JCT MURCIA-CANSILAYAN-DAMSITE-ABUANAN-BAGO CITY RD | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱27.3M | 100% | Medium risk46 | —-0.060 |
| 258 | 18GL0018IMPROVEMENT/WIDENING OF NATIONAL ROAD ALONG VALLEHERMOSO-CANLA-ON CITY-LA CASTELLANA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱46.5M | 100% | Medium risk45 | —-0.089 |
| 259 | 18GK0053ROAD CONCRETING OF BANGGA DOSE - FIRST FARMER MILL - BARANGAY CONCEPCION TOURISM ROAD, BRGY. DOS HERMANAS, TALISAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱46.5M | 100% | Medium risk45 | —-0.090 |
| 260 | 20GN0044OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS - JCT. PALENCIA-BOY SCOUT CAMPSITE ROAD, K0050+(-615) - K0053+400, K0054+360 - K0056+807, K0062+251 - K0063+000 , LA CARLOTA CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱44.8M | 100% | Medium risk45 | —-0.090 |
| 261 | 18GN0055CONSTRUCTION IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - ALIANZA-AYUNGON-LA CARLOTA ROAD LEADING TO BANTAYAN PARK AND BALAY DAKU, BAGO CITY - LA CARLOTA CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱46.5M | 100% | Medium risk45 | —-0.090 |
| 262 | 19GM0011RETROFITTING/STRENGTHENING OF BRIDGE, INAYAWAN BR. (B00239NR) ALONG BACOLOD SOUTH ROAD (KABANKALAN-HINOBA-AN SECTION), BRGY. INAYAWAN, CAUAYAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱4.8M | 100% | Medium risk45 | —-0.058 |
| 263 | 20GM0026CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - NRJ LEADING TO SUGAR BEACH RESORT AND LANGUB BEACH RESORT, BRGY. NAUHANG, SIPALAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱46.5M | 100% | Medium risk45 | —-0.051 |
| 264 | 19GO0167REPAIR/REHABILITATION/IMPROVEMENT OF HONORATA MANALO (BURI ROAD), BRGY. MANDALAGAN, BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱29.8M | 100% | Medium risk45 | —-0.086 |
| 265 | 21GO0071ROAD WIDENING - WIDENING / IMPROVEMENT OF GM CORDOVA AVE. (BURI ROAD), MANDALAGAN, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | Completed | ₱41.2M | 100% | Medium risk45 | —-0.086 |
| 266 | 22GN0049CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD - BAGO-MAMBUCAL ROAD, K0038+660 - K0039+100, K0039+940 - K0040+580, K0041+540 - K0041+900, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱42.1M | 100% | Medium risk45 | —-0.090 |
| 267 | 18GO0089OFF-CARRIAGEWAY IMPROVEMENT - BACOLOD CIRCUMFERENTIAL ROAD INCLUDING ROW - K0007+363 - K0009+025, K0009+717 - K0010+146, BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱42M | 100% | Medium risk45 | —-0.091 |
| 268 | 18RA0038CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG BACOLOD NORTH ROAD, K0000+000- K0001+325,K0001+353-K0001+670, BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱34.9M | 100% | Medium risk45 | —-0.091 |
| 269 | 19GK0040RECONSTRUCTION TO CONCRETE PAVEMENT - BANGGA DOSE - FIRST FARMERS MILL-BARANGAY CONCEPCION TOURISM ROAD, BRGY. DOS HERMANAS, TALISAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱37.2M | 100% | Medium risk45 | —-0.091 |
| 270 | 18GM0035CONSTRUCTION/ IMPROVEMENT OF ACCESS ROAD LEADING TO KABANKALAN AIRPORT, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱46.5M | 100% | Medium risk45 | —-0.088 |
| 271 | 20GN0016CONSTRUCTION IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - LA CARLOTA - LA CARLOTA SUGAR CENTRAL ROAD LEADING TO MUSCOVADO SUGAR MILL BRICK CHIMNEYS, CANMAN-OG, LA CARLOTA CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱38.2M | 100% | Medium risk45 | —-0.090 |
| 272 | 21GN0057RECONSTRUCTION TO CONCRETE PAVEMENT - LA CARLOTA - LA CARLOTA SUGAR CENTRAL ROAD LEADING TO MUSCOVADO SUGAR MILL BRICK CHIMNEYS, CANMAN-OG, LA CARLOTA CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱29.7M | 100% | Medium risk45 | —-0.091 |
| 273 | 22GN0068ROAD WIDENING - DON JORGE ARANETA-AYUNGON-YUNGUE-GURREA-LA CARLOTA CITY ROAD (S00208NR), CHAINAGE 4150 - CHAINAGE 5155, LA CARLOTA CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱35.3M | 100% | Medium risk45 | —-0.091 |
| 274 | 18GN0014CONSTRUCTION OF CONCRETE ROAD - JCT. BACOLOD SOUTH ROAD CONNECTING BANGGA MARIA MORENA AND RELOCATION SITE IN SUPPORT OF TUMANDOK CRAFTS INDUSTRIES, ALTER TRADE MANUFACTURING CORP., ENGERGREEN POWER DEVELOPMENT AND MANAGEMENT INC., AND HOC PO FEEDS CORPOR | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱33.7M | 100% | Medium risk45 | —-0.092 |
| 275 | 18GL0058TANOLO BR. 1 (B00352NR) ALONGBACOLOD SOUTH ROAD | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱18.4M | 100% | Medium risk45 | —-0.055 |