Contractor dossier
400 projects on file, including joint ventures this contractor is part of.
Total projects
400
Total budget
₱21.1B
Average progress
97.4%
Completion rate
91.5%
Average risk score
51.4
Medium risk on average, out of 100
Flagged as unusual
23
5.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Negros Island Region | 248 | ₱9.1B | 48.3 | 4 | 99.8% |
| Region VI | 71 | ₱4B | 56.6 | 9 | 93.3% |
| National Capital Region | 17 | ₱1.2B | 55.0 | 3 | 93.6% |
| Region IV-A | 17 | ₱1.1B | 54.4 | 0 | 100.0% |
| Region IV-B | 10 | ₱1.8B | 57.7 | 0 | 100.0% |
| Region VIII | 9 | ₱715.4M | 58.4 | 0 | 97.1% |
| Region VII | 8 | ₱1.1B | 63.4 | 5 | 55.7% |
| Region XI | 5 | ₱481M | 59.6 | 0 | 100.0% |
| Region X | 4 | ₱232M | 52.4 | 0 | 99.3% |
| Region IX | 3 | ₱376.1M | 69.3 | 2 | 100.0% |
| Region III | 3 | ₱431.7M | 50.6 | 0 | 100.0% |
| Region XIII | 3 | ₱289.5M | 43.8 | 0 | 100.0% |
| Region II | 2 | ₱193M | 54.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 143 | ₱8.7B | 52.4 | 4 | 97.9% |
| Flood Control and Drainage | 110 | ₱7.2B | 55.1 | 8 | 96.4% |
| Buildings and Facilities | 87 | ₱2.5B | 40.2 | 3 | 98.0% |
| Bridges | 39 | ₱1.1B | 49.1 | 2 | 99.4% |
| OTHER | 16 | ₱1.4B | 76.8 | 6 | 95.6% |
| GAA 2025 OO-1 | 2 | ₱99.2M | 94.2 | 0 | 87.7% |
| Water Provision and Storage | 2 | ₱97.5M | 48.0 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱35.1M | 87.0 | 0 | 59.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GM0004RECONSTRUCTION TO CONCRETE PAVEMENT - BACOLOD SOUTH RD (KABANKALAN-HINOBAAN SECTION) - K0177+900 - K0179+730, K0182+645 - K0182+903, SIPALAY CITY AND HINOBAAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱53.1M | 89% | High risk95 | —-0.004 |
| 25G00010REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - PANGANTA BR. (B00356PN) ALONG ILOILO-ANTIQUE RD | Region VI | Region VI | On-Going | ₱46.1M | 87% | High risk94 | —-0.002 |
| 24G00129CONSTRUCTION OF NEW COLLEGE OF LAW BUILDING, UP VISAYAS ILOILO- UNIVERSITY OF THE PHILIPPINES SYSTEM | Region VI | Region VI | On-Going | ₱99.5M | 59% | High risk92 | Flagged0.071 |
| 24GK0232CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALULAN RIVER, MANAPLA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱144.7M | 90% | High risk90 | Flagged0.054 |
| 25GO0029CONSTRUCTION OF REVETMENT, SUM-AG RIVER, BARANGAY SUM-AG, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱35.1M | 59% | High risk87 | —-0.012 |
| 24G00049CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG PANAY RIVER BASIN, BARANGAY STO. NIÑO, DUMALAG, CAPIZ | Region VI | Region VI | On-Going | ₱283.1M | 82% | High risk84 | Flagged0.035 |
| 18GP0111SIGMA BY-PASS ROAD INCL.ROW, CAPIZ | Region VI | Capiz 2nd DEO | Completed | ₱82.5M | 100% | High risk81 | —-0.022 |
| 23HK0064SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SHORE PROTECTION/SEAWALL, BRGY. CAPIÑAHAN, BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 100% | High risk81 | Flagged0.013 |
| 18GL0061CONSTRUCTION OF BINALBAGAN RIVER BANK SLOPE PROTECTION (UPSTREAM OF BINALBAGANBAGACAY BRIDGE) ALONG HINIGARAN- ISABELA ROAD, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱91.3M | 100% | High risk76 | —-0.024 |
| 19GM0003RECONSTRUCTION TO CONCRETE PAVEMENT/ASPHALT OVERLAY - AT SPECIFIC LOCATIONS ALONG BACOLOD SOUTH RD (S00274NR) K0084+(-179) - K0084+512, K0084+512 - K0085+070, K0085+217 - K0085+608, K0087+786 - K0088+235, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱49M | 100% | High risk76 | —-0.034 |
| 17RC0022REHABILITATION/RECONSTRUCTION OF NATIONALROADS WITH SLIPS, SOIL COLLAPSE AND LAND SLIDE ALONG VALLEHERMOSO-CANLA-ON CITY-LA CASTELLANA ROAD, LA CASTELLANA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱48.2M | 100% | High risk75 | —-0.034 |
| 19GM0053CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, NRJ LEADING TO SUGAR BEACH RESORT AND LANGUB BEACH RESORT, BRGY. NAUHANG, SIPALAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱39.2M | 100% | High risk74 | —-0.033 |
| 17RA0048CONSTRUCTION/UPGRADING/ REHABILITATION OFDRAINAGE ALONG PLAZA CAPITOL ROAD K0001+ (-650)TO K0001+300, BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱19.6M | 100% | High risk74 | —-0.030 |
| 17RA0044CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG BACOLOD NORTH RD., K0001+670-K0003+620, K0003+629-K0004+267 BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱34.2M | 100% | High risk74 | —-0.012 |
| 20GO0107WIDENING/ IMPROVEMENT/ UPGRADING OF HONORATA MANALO ( BURI ROAD), BRGY. MANDALAGAN , BACOLOD CITY | Negros Island Region | Bacolod City DEO | Terminated | ₱10.6M | 100% | High risk74 | Flagged0.002 |
| 17R00030CONSTRUCTION OF TOURISM WATER (TOUWA) SUPPLY IN MURCIA, NEGROS OCCIDENTAL, MURCIA, NEGROS OCCIDENTAL 3RD LD | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱95.5M | 100% | High risk74 | —-0.017 |
| 21GN0063ROAD WIDENING - DON JORGE ARANETA - AYUNGON - YUNGUE - GURREA - LA CARLOTA CITY (S00208NR) - CHAINAGE 2900 - CHAINAGE 4150, LA CARLOTA CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱39.4M | 100% | High risk74 | —-0.033 |
| 22GO0093OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING / CONSTRUCTION ALONG BACOLOD-CITY BDRY RD (S00096NR) K0006 + 220 - K0007 + 130, K0008 + 605 - K0008 + 989, K0009 + 228 - K0009 + 798 | Negros Island Region | Bacolod City DEO | Completed | ₱19.6M | 100% | High risk74 | —-0.016 |
| 23HO0315CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT PUROK BALANGHOY, BARANGAY YLAYA, | Region VII | Cebu 7th DEO | On-Going | ₱38.3M | 0% | High risk74 | Flagged0.063 |
| 24G00145CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE I), STA. BARBARA, ILOILO | Region VI | Region VI | On-Going | ₱98.1M | 1% | High risk72 | Flagged0.063 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24G00129CONSTRUCTION OF NEW COLLEGE OF LAW BUILDING, UP VISAYAS ILOILO- UNIVERSITY OF THE PHILIPPINES SYSTEM | Region VI | Region VI | On-Going | ₱99.5M | 59% | High risk92 | Flagged0.071 |
| 24G00145CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE I), STA. BARBARA, ILOILO | Region VI | Region VI | On-Going | ₱98.1M | 1% | High risk72 | Flagged0.063 |
| 23HO0315CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT PUROK BALANGHOY, BARANGAY YLAYA, | Region VII | Cebu 7th DEO | On-Going | ₱38.3M | 0% | High risk74 | Flagged0.063 |
| 24GK0232CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALULAN RIVER, MANAPLA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱144.7M | 90% | High risk90 | Flagged0.054 |
| 18OE0269CONSTRUCTION OF FOUR (4) STOREY TWENTY EIGHT (28) CLASSROOM SCHOOL BUILDING AT MABINI ELEMENTARY SCHOOL QUIAPO, MANILA CITY (BASED ON 2017 PLAN, REVISED 3-24-17) | National Capital Region | North Manila DEO | Completed | ₱221M | 100% | High risk71 | Flagged0.052 |
| 24GR0001CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL), MINA, ILOILO | Region VI | Iloilo 6th DEO | On-Going | ₱59.3M | 27% | High risk68 | Flagged0.045 |
| 24G00049CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG PANAY RIVER BASIN, BARANGAY STO. NIÑO, DUMALAG, CAPIZ | Region VI | Region VI | On-Going | ₱283.1M | 82% | High risk84 | Flagged0.035 |
| 22O00105ACTIVE TRANSPORT BIKE SHARE SYSTEM AND SAFE PATHWAYS PROGRAM IN METROPOLITAN AREAS - CONSTRUCTION OF PUBLIC TRANSPORT STOPS AND ESTABLISHMENT OF END-OF-TRIP FACILITIES | National Capital Region | National Capital Region | On-Going | ₱40.7M | 2% | Medium risk50 | Flagged0.034 |
| 23H00053OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGMT. PROG., CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF LOBOC RIVER CONTROL STRUCTURE, TAMBANGAN SECTION (LEFT SIDE), LOAY, BOHOL | Region VII | Region VII | On-Going | ₱236.4M | 0% | High risk67 | Flagged0.033 |
| 23H00054OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGMT. PROG., CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF LOBOC RIVER CONTROL STRUCTURE, TAMBANGAN SECTION (RIGHT SIDE), LOAY, BOHOL | Region VII | Region VII | On-Going | ₱236.3M | 0% | High risk67 | Flagged0.033 |
| 23HL0110ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF PALINPINON RIVER CONTROL, VALENCIA, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | On-Going | ₱96.5M | 100% | High risk72 | Flagged0.026 |
| 22O00107ACTIVE TRANSPORT BIKE SHARE SYSTEM AND SAFE PATHWAYS PROGRAM IN METROPOLITAN AREAS MAINTENANCE AND UPGRADING OF ACTIVE TRANSPORT INFRASTRUCTURE PHASE I | National Capital Region | National Capital Region | On-Going | ₱105.9M | 90% | High risk65 | Flagged0.022 |
| 19J00083CONSTRUCTION OF NEW BRIDGE- ALONG LABANGAN-PAGADIAN CITY-DUMALINAO ROAD | Region IX | Region IX | On-Going | ₱93.6M | 100% | High risk72 | Flagged0.018 |
| 23H00012OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROG, CONSTN/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF LOBOC RIVER CONTROL STRUCTURE, UGPONG SECTION, LOBOC, BOHOL | Region VII | Region VII | On-Going | ₱214.5M | 62% | High risk67 | Flagged0.017 |
| 21G00059BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 2, SEGMENT 3, PACKAGE A, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱161.8M | 35% | High risk63 | Flagged0.014 |
| 21G00030ROAD WIDENING - BACOLOD NORTH RD K0113+429 - K0114+582 | Region VI | Region VI | On-Going | ₱46M | 0% | Medium risk47 | Flagged0.013 |
| 23HK0064SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SHORE PROTECTION/SEAWALL, BRGY. CAPIÑAHAN, BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 100% | High risk81 | Flagged0.013 |
| 23G00041BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 1, SEGMENT 3, PHASE 3, TALISAY CITY, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱100.4M | 78% | High risk62 | Flagged0.009 |
| 21J00035BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF THE MULTI-PURPOSE FACILITY (GYMNASIUM), DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR | Region IX | Region IX | On-Going | ₱181.5M | 100% | High risk65 | Flagged0.004 |
| 18G00093REHABILITATION OF SHORE PROTECTION IN BRGYS. CANJUSA AND TAPONG | Region VI | Region VI | Completed | ₱11.9M | 100% | High risk65 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 301 | 22GO0028CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF REVETMENT WITH FLOODWALL IN MAGSUNGAY RIVER, PHASE 6, BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱44.1M | 100% | Medium risk45 | —-0.069 |
| 302 | 20GO0009CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. PAHANOCOY, PHASE 2, BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱34.3M | 100% | Medium risk45 | —-0.069 |
| 303 | 19GM0016CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG HILABANGAN RIVER, BRGY. ORONG, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱36.5M | 100% | Medium risk45 | —-0.068 |
| 304 | 18GG0053PREVENTIVE MAINTENANCE OF ROAD: CONCRETE REBLOCKING - ILOILO - CAPIZ ROAD (OLD ROUTE), K0065 + 000 - K0068 + 000 | Region VI | Iloilo 2nd DEO | Completed | ₱27.9M | 100% | Medium risk45 | —-0.087 |
| 305 | 20GM0050REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGE - BINICUIL BR. (B00216NR) ALONG BACOLOD SOUTH ROAD, BRGY. BINICUIL, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱14M | 100% | Medium risk45 | —-0.060 |
| 306 | 20GM0021CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION - JCT. BACOLOD SOUTH ROAD LEADING TO DAAN BANWA (BIRD WATCHING AREA), BRGY. DAAN BANUA, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱40.1M | 100% | Medium risk45 | —-0.077 |
| 307 | 22GM0031RECONSTRUCTION TO CONCRETE PAVEMENT - AT SPECIFIC LOCATIONS ALONG BACOLOD SOUTH RD (KABANKALAN-HINOBAAN SECTION (S00224NR) K0151+000 - K0152+101, BRGY. BULATA, CAUAYAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱38.1M | 100% | Medium risk45 | —-0.088 |
| 308 | 20GM0024CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION-NRJ LEADING TO MARICALUM PORT TO CAMPOMANES BAY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱37.2M | 100% | Medium risk45 | —-0.088 |
| 309 | 18GM0058PREVENTIVE MAINTENANCE ALONG TERTIARY ROADS DANCALAN CANDONI DAMUTAN VLLEY ROAD K0099+(-817) - K0099+(-483), K0100+606 - K0101+000, K0101+144 - K0101+302, K0105+027 - K0105+166, K0115+751 - K0116+000, K0117+705 - K0118+000, K0118+697 - K0118+816, K0123+00 | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱30.2M | 100% | Medium risk45 | —-0.089 |
| 310 | 20GM0043ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS, KABANKALAN JCT. SALONG-TAPI-DACONGCOGON-BANTAYAN RD - K0109+200 - K0113+000, BRGY. TAPI, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱40.6M | 100% | Medium risk45 | —-0.089 |
| 311 | 22NB0058CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ALONG NRJ BAYUGAN-CALAITAN-TANDAG RD (S00457MN) K1273+550 - K1273+691, BAYUGAN, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱96.5M | 100% | Medium risk45 | —-0.076 |
| 312 | 22NB0057CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ALONG NRJ BAYUGAN-CALAITAN-TANDAG RD (S00457MN) K1275+374 - K1275+592, BAYUGAN, AGUSAN DEL SUR | Region XIII | Agusan del Sur 1st DEO | Completed | ₱96.5M | 100% | Medium risk45 | —-0.076 |
| 313 | 19GM0013RETROFITTING/STRENGTHENING OF BRIDGE - SI-ALAY BR. (B00240NR) ALONG BACOLOD SOUTH RD. (KABANKALAN- HINOBAAN SECTION), BRGY. BULATA, CAUAYAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱7M | 100% | Medium risk45 | —-0.058 |
| 314 | 19GM0014RETROFITTING/ STRENGTHENING OF BRIDGE - TAUANGAN BR. (B00245NR) ALONG BACOLOD SOUTH RD (KABANKALAN-HINOBAAN SECTION), BRGY. GIL MONTILLA, SIPALAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱7.4M | 100% | Medium risk45 | —-0.058 |
| 315 | 19GM0009RETROFITTING/ STRENGTHENING OF BRIDGE - CALILING BR. (B00233NR) ALONG BACOLOD SOUTH RD (KABANKALAN-HINOBAAN SECTION), BRGY. CALILING, CAUAYAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱7.4M | 100% | Medium risk45 | —-0.058 |
| 316 | 19DO0110CONSTRUCTION OF THREE (3) STOREY SIX (6) CLASSROOM SCHOOL BUILDING AT ABUYOD NHS, TERESA, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱18M | 100% | Medium risk45 | —-0.057 |
| 317 | 18GK0022PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY OF BACOLOD NORTH RD - K0007+-793 - K0007+-378 | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱18.7M | 100% | Medium risk45 | —-0.092 |
| 318 | 18RA0037CONSTRUCTION/UPGRADING/ REHABILITATION OF DRAINAGE ALONG BACOLOD SOUTH ROAD,K0000+000-K0001+000, BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱23.3M | 100% | Medium risk45 | —-0.093 |
| 319 | 18GG0060PREVENTIVE MAINTENANCE OF ROAD - CONCRETE REBLOCKING OF ILOILO-CAPIZ RD. (OLD ROUTE), K0061+000 - K0064+000 | Region VI | Iloilo 2nd DEO | Completed | ₱18.6M | 100% | Medium risk45 | —-0.087 |
| 320 | 18GM0039CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, JCT. BACOLOD SOUTH ROAD LEADING TO DAAN BANWA (BIRD WATCHING AREA), BRGY. DAAN BANWA, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱18.6M | 100% | Medium risk45 | —-0.090 |
| 321 | 18GM0056CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, NRJ LEADING TO MAG-ASO FALLS, BRGY. ORINGAO, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱27.9M | 100% | Medium risk45 | —-0.091 |
| 322 | 20GM0001ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS, KABANKALAN - BAIS RD - K0100+000 - K0101+000, BRGY. ORINGAO, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱20M | 100% | Medium risk45 | —-0.092 |
| 323 | 19GK0161CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ALONG BACOLOD-MURCIA-DS BENEDICTO-SN CARLOS CITY RD (S00009NR) - K0035+000 - K0035+063 | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱9.8M | 100% | Medium risk45 | —-0.091 |
| 324 | 19GG0086COMPLETION OF PUBLIC MARKET, BRGY. ILAWOD, BAROTAC NUEVO, ILOILO | Region VI | Iloilo 2nd DEO | Completed | ₱4.8M | 100% | Medium risk44 | —-0.082 |
| 325 | 19GO0143CONSTRUCTION/REHABILITATION/ IMPROVEMENT OF ACCESS ROAD,BRGY. HANDUMANAN, BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱11.3M | 100% | Medium risk44 | —-0.092 |