Contractor dossier
400 projects on file, including joint ventures this contractor is part of.
Total projects
400
Total budget
₱21.1B
Average progress
97.4%
Completion rate
91.5%
Average risk score
51.4
Medium risk on average, out of 100
Flagged as unusual
23
5.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Negros Island Region | 248 | ₱9.1B | 48.3 | 4 | 99.8% |
| Region VI | 71 | ₱4B | 56.6 | 9 | 93.3% |
| National Capital Region | 17 | ₱1.2B | 55.0 | 3 | 93.6% |
| Region IV-A | 17 | ₱1.1B | 54.4 | 0 | 100.0% |
| Region IV-B | 10 | ₱1.8B | 57.7 | 0 | 100.0% |
| Region VIII | 9 | ₱715.4M | 58.4 | 0 | 97.1% |
| Region VII | 8 | ₱1.1B | 63.4 | 5 | 55.7% |
| Region XI | 5 | ₱481M | 59.6 | 0 | 100.0% |
| Region X | 4 | ₱232M | 52.4 | 0 | 99.3% |
| Region IX | 3 | ₱376.1M | 69.3 | 2 | 100.0% |
| Region III | 3 | ₱431.7M | 50.6 | 0 | 100.0% |
| Region XIII | 3 | ₱289.5M | 43.8 | 0 | 100.0% |
| Region II | 2 | ₱193M | 54.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 143 | ₱8.7B | 52.4 | 4 | 97.9% |
| Flood Control and Drainage | 110 | ₱7.2B | 55.1 | 8 | 96.4% |
| Buildings and Facilities | 87 | ₱2.5B | 40.2 | 3 | 98.0% |
| Bridges | 39 | ₱1.1B | 49.1 | 2 | 99.4% |
| OTHER | 16 | ₱1.4B | 76.8 | 6 | 95.6% |
| GAA 2025 OO-1 | 2 | ₱99.2M | 94.2 | 0 | 87.7% |
| Water Provision and Storage | 2 | ₱97.5M | 48.0 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱35.1M | 87.0 | 0 | 59.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GM0004RECONSTRUCTION TO CONCRETE PAVEMENT - BACOLOD SOUTH RD (KABANKALAN-HINOBAAN SECTION) - K0177+900 - K0179+730, K0182+645 - K0182+903, SIPALAY CITY AND HINOBAAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱53.1M | 89% | High risk95 | —-0.004 |
| 25G00010REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - PANGANTA BR. (B00356PN) ALONG ILOILO-ANTIQUE RD | Region VI | Region VI | On-Going | ₱46.1M | 87% | High risk94 | —-0.002 |
| 24G00129CONSTRUCTION OF NEW COLLEGE OF LAW BUILDING, UP VISAYAS ILOILO- UNIVERSITY OF THE PHILIPPINES SYSTEM | Region VI | Region VI | On-Going | ₱99.5M | 59% | High risk92 | Flagged0.071 |
| 24GK0232CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALULAN RIVER, MANAPLA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱144.7M | 90% | High risk90 | Flagged0.054 |
| 25GO0029CONSTRUCTION OF REVETMENT, SUM-AG RIVER, BARANGAY SUM-AG, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱35.1M | 59% | High risk87 | —-0.012 |
| 24G00049CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG PANAY RIVER BASIN, BARANGAY STO. NIÑO, DUMALAG, CAPIZ | Region VI | Region VI | On-Going | ₱283.1M | 82% | High risk84 | Flagged0.035 |
| 18GP0111SIGMA BY-PASS ROAD INCL.ROW, CAPIZ | Region VI | Capiz 2nd DEO | Completed | ₱82.5M | 100% | High risk81 | —-0.022 |
| 23HK0064SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SHORE PROTECTION/SEAWALL, BRGY. CAPIÑAHAN, BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 100% | High risk81 | Flagged0.013 |
| 18GL0061CONSTRUCTION OF BINALBAGAN RIVER BANK SLOPE PROTECTION (UPSTREAM OF BINALBAGANBAGACAY BRIDGE) ALONG HINIGARAN- ISABELA ROAD, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱91.3M | 100% | High risk76 | —-0.024 |
| 19GM0003RECONSTRUCTION TO CONCRETE PAVEMENT/ASPHALT OVERLAY - AT SPECIFIC LOCATIONS ALONG BACOLOD SOUTH RD (S00274NR) K0084+(-179) - K0084+512, K0084+512 - K0085+070, K0085+217 - K0085+608, K0087+786 - K0088+235, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱49M | 100% | High risk76 | —-0.034 |
| 17RC0022REHABILITATION/RECONSTRUCTION OF NATIONALROADS WITH SLIPS, SOIL COLLAPSE AND LAND SLIDE ALONG VALLEHERMOSO-CANLA-ON CITY-LA CASTELLANA ROAD, LA CASTELLANA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱48.2M | 100% | High risk75 | —-0.034 |
| 19GM0053CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, NRJ LEADING TO SUGAR BEACH RESORT AND LANGUB BEACH RESORT, BRGY. NAUHANG, SIPALAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱39.2M | 100% | High risk74 | —-0.033 |
| 17RA0048CONSTRUCTION/UPGRADING/ REHABILITATION OFDRAINAGE ALONG PLAZA CAPITOL ROAD K0001+ (-650)TO K0001+300, BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱19.6M | 100% | High risk74 | —-0.030 |
| 17RA0044CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG BACOLOD NORTH RD., K0001+670-K0003+620, K0003+629-K0004+267 BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱34.2M | 100% | High risk74 | —-0.012 |
| 20GO0107WIDENING/ IMPROVEMENT/ UPGRADING OF HONORATA MANALO ( BURI ROAD), BRGY. MANDALAGAN , BACOLOD CITY | Negros Island Region | Bacolod City DEO | Terminated | ₱10.6M | 100% | High risk74 | Flagged0.002 |
| 17R00030CONSTRUCTION OF TOURISM WATER (TOUWA) SUPPLY IN MURCIA, NEGROS OCCIDENTAL, MURCIA, NEGROS OCCIDENTAL 3RD LD | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱95.5M | 100% | High risk74 | —-0.017 |
| 21GN0063ROAD WIDENING - DON JORGE ARANETA - AYUNGON - YUNGUE - GURREA - LA CARLOTA CITY (S00208NR) - CHAINAGE 2900 - CHAINAGE 4150, LA CARLOTA CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱39.4M | 100% | High risk74 | —-0.033 |
| 22GO0093OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING / CONSTRUCTION ALONG BACOLOD-CITY BDRY RD (S00096NR) K0006 + 220 - K0007 + 130, K0008 + 605 - K0008 + 989, K0009 + 228 - K0009 + 798 | Negros Island Region | Bacolod City DEO | Completed | ₱19.6M | 100% | High risk74 | —-0.016 |
| 23HO0315CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT PUROK BALANGHOY, BARANGAY YLAYA, | Region VII | Cebu 7th DEO | On-Going | ₱38.3M | 0% | High risk74 | Flagged0.063 |
| 24G00145CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE I), STA. BARBARA, ILOILO | Region VI | Region VI | On-Going | ₱98.1M | 1% | High risk72 | Flagged0.063 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24G00129CONSTRUCTION OF NEW COLLEGE OF LAW BUILDING, UP VISAYAS ILOILO- UNIVERSITY OF THE PHILIPPINES SYSTEM | Region VI | Region VI | On-Going | ₱99.5M | 59% | High risk92 | Flagged0.071 |
| 24G00145CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE I), STA. BARBARA, ILOILO | Region VI | Region VI | On-Going | ₱98.1M | 1% | High risk72 | Flagged0.063 |
| 23HO0315CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT PUROK BALANGHOY, BARANGAY YLAYA, | Region VII | Cebu 7th DEO | On-Going | ₱38.3M | 0% | High risk74 | Flagged0.063 |
| 24GK0232CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALULAN RIVER, MANAPLA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱144.7M | 90% | High risk90 | Flagged0.054 |
| 18OE0269CONSTRUCTION OF FOUR (4) STOREY TWENTY EIGHT (28) CLASSROOM SCHOOL BUILDING AT MABINI ELEMENTARY SCHOOL QUIAPO, MANILA CITY (BASED ON 2017 PLAN, REVISED 3-24-17) | National Capital Region | North Manila DEO | Completed | ₱221M | 100% | High risk71 | Flagged0.052 |
| 24GR0001CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL), MINA, ILOILO | Region VI | Iloilo 6th DEO | On-Going | ₱59.3M | 27% | High risk68 | Flagged0.045 |
| 24G00049CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG PANAY RIVER BASIN, BARANGAY STO. NIÑO, DUMALAG, CAPIZ | Region VI | Region VI | On-Going | ₱283.1M | 82% | High risk84 | Flagged0.035 |
| 22O00105ACTIVE TRANSPORT BIKE SHARE SYSTEM AND SAFE PATHWAYS PROGRAM IN METROPOLITAN AREAS - CONSTRUCTION OF PUBLIC TRANSPORT STOPS AND ESTABLISHMENT OF END-OF-TRIP FACILITIES | National Capital Region | National Capital Region | On-Going | ₱40.7M | 2% | Medium risk50 | Flagged0.034 |
| 23H00053OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGMT. PROG., CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF LOBOC RIVER CONTROL STRUCTURE, TAMBANGAN SECTION (LEFT SIDE), LOAY, BOHOL | Region VII | Region VII | On-Going | ₱236.4M | 0% | High risk67 | Flagged0.033 |
| 23H00054OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGMT. PROG., CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF LOBOC RIVER CONTROL STRUCTURE, TAMBANGAN SECTION (RIGHT SIDE), LOAY, BOHOL | Region VII | Region VII | On-Going | ₱236.3M | 0% | High risk67 | Flagged0.033 |
| 23HL0110ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF PALINPINON RIVER CONTROL, VALENCIA, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | On-Going | ₱96.5M | 100% | High risk72 | Flagged0.026 |
| 22O00107ACTIVE TRANSPORT BIKE SHARE SYSTEM AND SAFE PATHWAYS PROGRAM IN METROPOLITAN AREAS MAINTENANCE AND UPGRADING OF ACTIVE TRANSPORT INFRASTRUCTURE PHASE I | National Capital Region | National Capital Region | On-Going | ₱105.9M | 90% | High risk65 | Flagged0.022 |
| 19J00083CONSTRUCTION OF NEW BRIDGE- ALONG LABANGAN-PAGADIAN CITY-DUMALINAO ROAD | Region IX | Region IX | On-Going | ₱93.6M | 100% | High risk72 | Flagged0.018 |
| 23H00012OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROG, CONSTN/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF LOBOC RIVER CONTROL STRUCTURE, UGPONG SECTION, LOBOC, BOHOL | Region VII | Region VII | On-Going | ₱214.5M | 62% | High risk67 | Flagged0.017 |
| 21G00059BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 2, SEGMENT 3, PACKAGE A, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱161.8M | 35% | High risk63 | Flagged0.014 |
| 21G00030ROAD WIDENING - BACOLOD NORTH RD K0113+429 - K0114+582 | Region VI | Region VI | On-Going | ₱46M | 0% | Medium risk47 | Flagged0.013 |
| 23HK0064SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SHORE PROTECTION/SEAWALL, BRGY. CAPIÑAHAN, BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 100% | High risk81 | Flagged0.013 |
| 23G00041BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 1, SEGMENT 3, PHASE 3, TALISAY CITY, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱100.4M | 78% | High risk62 | Flagged0.009 |
| 21J00035BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF THE MULTI-PURPOSE FACILITY (GYMNASIUM), DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR | Region IX | Region IX | On-Going | ₱181.5M | 100% | High risk65 | Flagged0.004 |
| 18G00093REHABILITATION OF SHORE PROTECTION IN BRGYS. CANJUSA AND TAPONG | Region VI | Region VI | Completed | ₱11.9M | 100% | High risk65 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 326 | 19GN0059PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY- ALONG JCT. SAN ENRIQUE- PONTEVEDRA BY-PASS ROAD, K0038+000 TO K0039+325, SAN ENRIQUE, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱11.4M | 100% | Medium risk44 | —-0.090 |
| 327 | 19GN0058PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ALONG BACOLOD SOUTH ROAD, K0018+221 TO K0018+713, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱9.9M | 100% | Medium risk44 | —-0.091 |
| 328 | 18GM0038CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, NRJ LEADING TO MARICALUM PORT TO CAMPOMANES BAY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱18.6M | 100% | Medium risk44 | —-0.089 |
| 329 | 22GM0036ROAD WIDENING - AT SPECIFIC LOCATIONS ALONG BACOLOD SOUTH RD (KABANKALAN - HINOBAAN SECTION) (S00224NR) K0095+196 - K0097+133, ILOG, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱24.5M | 100% | Medium risk44 | —-0.090 |
| 330 | 20GM0003ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS, DANCALAN - CANDONI - DAMUTAN VALLEY RD K0102+372 - K0103+447, K0118+816 - K0120+040, BRGY. DANCALAN, ILOG AND BRGY. TALACDAN, CAUAYAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱23.3M | 100% | Medium risk44 | —-0.091 |
| 331 | 17RB0228CONSTRUCTION OF 1 UNIT - 2 STY 8 CL SCHOOL BUILDING AT TALISAY ELEMENTARY SCHOOL, CITY OF TALISAY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱17.3M | 100% | Medium risk44 | —-0.025 |
| 332 | 16GK0126CONSTRUCTION OF ONE (1) UNIT - THREE (3) STOREY TWELVE (12) CLASSROOM SCHOOL BUILDING AT COLONIA DIVINA INTEGRATED SCHOOL, SAGAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱20.8M | 100% | Medium risk44 | —-0.023 |
| 333 | 19GM0062CONSTRUCTION OF LOCAL ROAD - SITIO INDAKPAN, BRGY. CANLAMAY, ILOG, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.4M | 100% | Medium risk44 | —-0.091 |
| 334 | 19GM0067CONSTRUCTION OF LOCAL ROAD - PUROK SANTAN-CAIWAN, BRGY. CANLAMAY, ILOG, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.4M | 100% | Medium risk44 | —-0.091 |
| 335 | 17RB0032CONSTRUCTION OF TWO (2) UNITS - TWO (2) STOREY SIX (6) CLASSROOM SCHOOL BUILDING AT MURCIA NATIONAL HIGH SCHOOL, MURCIA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱17M | 100% | Medium risk44 | —-0.024 |
| 336 | 17RB0060COMPLETION OF CITY HEALTH BIRTHING FACILITY EMERGENCY CLINIC AND OTHER DIAGNOSTIC SERVICES, VICTORIAS CHO, VICTORIAS CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱15M | 100% | Medium risk44 | —-0.025 |
| 337 | 18GK0171CONSTRUCTION OF 3STY 6CL BUILDING AT MABINI NHS-ALIMATOC EXT. HS, CADIZ CITY | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱15.4M | 100% | Medium risk44 | —-0.025 |
| 338 | 18GO0145CONSTRUCTION OF FOUR(4) STOREY- EIGHT(8) LABORATORY ( 4 REGULAR WORKSHOP, 2 SCIENCE LAB, 2 ICT) AT DOMINGO LACSON NATIONAL HIGH SCHOOL, BRGY. BANAGO, BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱41M | 100% | Medium risk43 | —-0.036 |
| 339 | 18GK0200CONSTRUCTION OF 3STY12CL BUILDING AT SHS IN CALATRAVA, CALATRAVA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱33.2M | 100% | Medium risk43 | —-0.039 |
| 340 | 18GO0136CONSTRUCTION OF FOUR(4) STOREY-EIGHT(8 ) REGULAR WORKSHOP AT NEGROS OCCIDENTAL HIGH SCHOOL ( 9.5M X 46.0M, BRGY. 39,,BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱36.4M | 100% | Medium risk42 | —-0.032 |
| 341 | 22NI0066CONSTRUCTION OF ROADSLIP PROTECTION STRUCTURES ALONG BARANGAY LAWIGAN, STA. 3+087.50-STA. 3+117.5, BISLIG CITY, SURIGAO DEL SUR | Region XIII | Surigao del Sur 2nd DEO | Completed | ₱96.5M | 100% | Medium risk42 | —-0.063 |
| 342 | 18GL0128CONSTRUCTION OF 1-UNIT 4-STOREY 20-CLASSROOM (9.5M X 54M) SCHOOL BUILDING AT HINIGARAN NATIONAL HIGH SCHOOL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱45M | 100% | Medium risk42 | —-0.035 |
| 343 | 18GG0104CONCRETING OF BRGY. IPIL - LONOY FMR, CALINOG, ILOILO | Region VI | Iloilo 2nd DEO | Completed | ₱9.5M | 100% | Medium risk41 | —-0.036 |
| 344 | 18GK0174CONSTRUCTION OF 2STY 8CL BUILDING AT BANQUEROHAN NHS (DR. VICENTE F. GUSTILO NHS), CADIZ CITY | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱23.7M | 100% | Medium risk41 | —-0.043 |
| 345 | 21GG0165CONCRETING OF BRGY. GUINHULACAN FMR, BRGY. GUINHULACAN, BINGAWAN, ILOILO | Region VI | Iloilo 2nd DEO | Completed | ₱11.8M | 100% | Medium risk41 | —-0.036 |
| 346 | 20GG0185CONCRETING OF ZONE 1 TO ZONE 4, BRGY. GINES INTERIOR FMR, BRGY. GINES INTERIOR, CABATUAN, ILOILO | Region VI | Iloilo 2nd DEO | Completed | ₱9.4M | 100% | Medium risk40 | —-0.035 |
| 347 | 19GG0121CONCRETING OF BRGY. CAHAGUIKICAN FMR, BRGY. CAHAGUIKICAN, POTOTAN, ILOILO | Region VI | Iloilo 2nd DEO | Completed | ₱9.5M | 100% | Medium risk40 | —-0.034 |
| 348 | 18GO0174CONSTRUCTION OF FOUR (4) STOREY - FOUR (4) LABORATORY (2 SCIENCE LAB & 2 ICT) AT M.G. MEDALLA INTEGRATED SCHOOL, BRGY. PAHANOCOY , BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱18.6M | 100% | Medium risk40 | —-0.042 |
| 349 | 18GO0173CONSTRUCTION OF FOUR (4) STOREY- FOUR (4) LABORATORY (2 SCIENCE LAB & 2 ICT LAB ) WITH FOUR (4) CLASSROOM AT LUISA MEDEL NATIONAL HIGH SCHOOL, BRGY. TANGUB , BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱18.5M | 100% | Medium risk40 | —-0.043 |
| 350 | 18GO0156CONSTRUCTION OF TWO(2) STOREY-FOUR(4) LABORATORY ( 2 SCIENCE LAB & 2 ICT) AT ALANGILAN NATIONAL HIGH SCHOOL, BRGY. ALANGILAN, BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱18.2M | 100% | Medium risk40 | —-0.042 |