Contractor dossier
400 projects on file, including joint ventures this contractor is part of.
Total projects
400
Total budget
₱21.1B
Average progress
97.4%
Completion rate
91.5%
Average risk score
51.4
Medium risk on average, out of 100
Flagged as unusual
23
5.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Negros Island Region | 248 | ₱9.1B | 48.3 | 4 | 99.8% |
| Region VI | 71 | ₱4B | 56.6 | 9 | 93.3% |
| National Capital Region | 17 | ₱1.2B | 55.0 | 3 | 93.6% |
| Region IV-A | 17 | ₱1.1B | 54.4 | 0 | 100.0% |
| Region IV-B | 10 | ₱1.8B | 57.7 | 0 | 100.0% |
| Region VIII | 9 | ₱715.4M | 58.4 | 0 | 97.1% |
| Region VII | 8 | ₱1.1B | 63.4 | 5 | 55.7% |
| Region XI | 5 | ₱481M | 59.6 | 0 | 100.0% |
| Region X | 4 | ₱232M | 52.4 | 0 | 99.3% |
| Region IX | 3 | ₱376.1M | 69.3 | 2 | 100.0% |
| Region III | 3 | ₱431.7M | 50.6 | 0 | 100.0% |
| Region XIII | 3 | ₱289.5M | 43.8 | 0 | 100.0% |
| Region II | 2 | ₱193M | 54.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 143 | ₱8.7B | 52.4 | 4 | 97.9% |
| Flood Control and Drainage | 110 | ₱7.2B | 55.1 | 8 | 96.4% |
| Buildings and Facilities | 87 | ₱2.5B | 40.2 | 3 | 98.0% |
| Bridges | 39 | ₱1.1B | 49.1 | 2 | 99.4% |
| OTHER | 16 | ₱1.4B | 76.8 | 6 | 95.6% |
| GAA 2025 OO-1 | 2 | ₱99.2M | 94.2 | 0 | 87.7% |
| Water Provision and Storage | 2 | ₱97.5M | 48.0 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱35.1M | 87.0 | 0 | 59.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GM0004RECONSTRUCTION TO CONCRETE PAVEMENT - BACOLOD SOUTH RD (KABANKALAN-HINOBAAN SECTION) - K0177+900 - K0179+730, K0182+645 - K0182+903, SIPALAY CITY AND HINOBAAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱53.1M | 89% | High risk95 | —-0.004 |
| 25G00010REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - PANGANTA BR. (B00356PN) ALONG ILOILO-ANTIQUE RD | Region VI | Region VI | On-Going | ₱46.1M | 87% | High risk94 | —-0.002 |
| 24G00129CONSTRUCTION OF NEW COLLEGE OF LAW BUILDING, UP VISAYAS ILOILO- UNIVERSITY OF THE PHILIPPINES SYSTEM | Region VI | Region VI | On-Going | ₱99.5M | 59% | High risk92 | Flagged0.071 |
| 24GK0232CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALULAN RIVER, MANAPLA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱144.7M | 90% | High risk90 | Flagged0.054 |
| 25GO0029CONSTRUCTION OF REVETMENT, SUM-AG RIVER, BARANGAY SUM-AG, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱35.1M | 59% | High risk87 | —-0.012 |
| 24G00049CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG PANAY RIVER BASIN, BARANGAY STO. NIÑO, DUMALAG, CAPIZ | Region VI | Region VI | On-Going | ₱283.1M | 82% | High risk84 | Flagged0.035 |
| 18GP0111SIGMA BY-PASS ROAD INCL.ROW, CAPIZ | Region VI | Capiz 2nd DEO | Completed | ₱82.5M | 100% | High risk81 | —-0.022 |
| 23HK0064SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SHORE PROTECTION/SEAWALL, BRGY. CAPIÑAHAN, BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 100% | High risk81 | Flagged0.013 |
| 18GL0061CONSTRUCTION OF BINALBAGAN RIVER BANK SLOPE PROTECTION (UPSTREAM OF BINALBAGANBAGACAY BRIDGE) ALONG HINIGARAN- ISABELA ROAD, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱91.3M | 100% | High risk76 | —-0.024 |
| 19GM0003RECONSTRUCTION TO CONCRETE PAVEMENT/ASPHALT OVERLAY - AT SPECIFIC LOCATIONS ALONG BACOLOD SOUTH RD (S00274NR) K0084+(-179) - K0084+512, K0084+512 - K0085+070, K0085+217 - K0085+608, K0087+786 - K0088+235, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱49M | 100% | High risk76 | —-0.034 |
| 17RC0022REHABILITATION/RECONSTRUCTION OF NATIONALROADS WITH SLIPS, SOIL COLLAPSE AND LAND SLIDE ALONG VALLEHERMOSO-CANLA-ON CITY-LA CASTELLANA ROAD, LA CASTELLANA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱48.2M | 100% | High risk75 | —-0.034 |
| 19GM0053CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, NRJ LEADING TO SUGAR BEACH RESORT AND LANGUB BEACH RESORT, BRGY. NAUHANG, SIPALAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱39.2M | 100% | High risk74 | —-0.033 |
| 17RA0048CONSTRUCTION/UPGRADING/ REHABILITATION OFDRAINAGE ALONG PLAZA CAPITOL ROAD K0001+ (-650)TO K0001+300, BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱19.6M | 100% | High risk74 | —-0.030 |
| 17RA0044CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG BACOLOD NORTH RD., K0001+670-K0003+620, K0003+629-K0004+267 BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱34.2M | 100% | High risk74 | —-0.012 |
| 20GO0107WIDENING/ IMPROVEMENT/ UPGRADING OF HONORATA MANALO ( BURI ROAD), BRGY. MANDALAGAN , BACOLOD CITY | Negros Island Region | Bacolod City DEO | Terminated | ₱10.6M | 100% | High risk74 | Flagged0.002 |
| 17R00030CONSTRUCTION OF TOURISM WATER (TOUWA) SUPPLY IN MURCIA, NEGROS OCCIDENTAL, MURCIA, NEGROS OCCIDENTAL 3RD LD | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱95.5M | 100% | High risk74 | —-0.017 |
| 21GN0063ROAD WIDENING - DON JORGE ARANETA - AYUNGON - YUNGUE - GURREA - LA CARLOTA CITY (S00208NR) - CHAINAGE 2900 - CHAINAGE 4150, LA CARLOTA CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱39.4M | 100% | High risk74 | —-0.033 |
| 22GO0093OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING / CONSTRUCTION ALONG BACOLOD-CITY BDRY RD (S00096NR) K0006 + 220 - K0007 + 130, K0008 + 605 - K0008 + 989, K0009 + 228 - K0009 + 798 | Negros Island Region | Bacolod City DEO | Completed | ₱19.6M | 100% | High risk74 | —-0.016 |
| 23HO0315CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT PUROK BALANGHOY, BARANGAY YLAYA, | Region VII | Cebu 7th DEO | On-Going | ₱38.3M | 0% | High risk74 | Flagged0.063 |
| 24G00145CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE I), STA. BARBARA, ILOILO | Region VI | Region VI | On-Going | ₱98.1M | 1% | High risk72 | Flagged0.063 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24G00129CONSTRUCTION OF NEW COLLEGE OF LAW BUILDING, UP VISAYAS ILOILO- UNIVERSITY OF THE PHILIPPINES SYSTEM | Region VI | Region VI | On-Going | ₱99.5M | 59% | High risk92 | Flagged0.071 |
| 24G00145CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE I), STA. BARBARA, ILOILO | Region VI | Region VI | On-Going | ₱98.1M | 1% | High risk72 | Flagged0.063 |
| 23HO0315CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT PUROK BALANGHOY, BARANGAY YLAYA, | Region VII | Cebu 7th DEO | On-Going | ₱38.3M | 0% | High risk74 | Flagged0.063 |
| 24GK0232CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALULAN RIVER, MANAPLA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱144.7M | 90% | High risk90 | Flagged0.054 |
| 18OE0269CONSTRUCTION OF FOUR (4) STOREY TWENTY EIGHT (28) CLASSROOM SCHOOL BUILDING AT MABINI ELEMENTARY SCHOOL QUIAPO, MANILA CITY (BASED ON 2017 PLAN, REVISED 3-24-17) | National Capital Region | North Manila DEO | Completed | ₱221M | 100% | High risk71 | Flagged0.052 |
| 24GR0001CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL), MINA, ILOILO | Region VI | Iloilo 6th DEO | On-Going | ₱59.3M | 27% | High risk68 | Flagged0.045 |
| 24G00049CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG PANAY RIVER BASIN, BARANGAY STO. NIÑO, DUMALAG, CAPIZ | Region VI | Region VI | On-Going | ₱283.1M | 82% | High risk84 | Flagged0.035 |
| 22O00105ACTIVE TRANSPORT BIKE SHARE SYSTEM AND SAFE PATHWAYS PROGRAM IN METROPOLITAN AREAS - CONSTRUCTION OF PUBLIC TRANSPORT STOPS AND ESTABLISHMENT OF END-OF-TRIP FACILITIES | National Capital Region | National Capital Region | On-Going | ₱40.7M | 2% | Medium risk50 | Flagged0.034 |
| 23H00053OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGMT. PROG., CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF LOBOC RIVER CONTROL STRUCTURE, TAMBANGAN SECTION (LEFT SIDE), LOAY, BOHOL | Region VII | Region VII | On-Going | ₱236.4M | 0% | High risk67 | Flagged0.033 |
| 23H00054OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGMT. PROG., CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF LOBOC RIVER CONTROL STRUCTURE, TAMBANGAN SECTION (RIGHT SIDE), LOAY, BOHOL | Region VII | Region VII | On-Going | ₱236.3M | 0% | High risk67 | Flagged0.033 |
| 23HL0110ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF PALINPINON RIVER CONTROL, VALENCIA, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | On-Going | ₱96.5M | 100% | High risk72 | Flagged0.026 |
| 22O00107ACTIVE TRANSPORT BIKE SHARE SYSTEM AND SAFE PATHWAYS PROGRAM IN METROPOLITAN AREAS MAINTENANCE AND UPGRADING OF ACTIVE TRANSPORT INFRASTRUCTURE PHASE I | National Capital Region | National Capital Region | On-Going | ₱105.9M | 90% | High risk65 | Flagged0.022 |
| 19J00083CONSTRUCTION OF NEW BRIDGE- ALONG LABANGAN-PAGADIAN CITY-DUMALINAO ROAD | Region IX | Region IX | On-Going | ₱93.6M | 100% | High risk72 | Flagged0.018 |
| 23H00012OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROG, CONSTN/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF LOBOC RIVER CONTROL STRUCTURE, UGPONG SECTION, LOBOC, BOHOL | Region VII | Region VII | On-Going | ₱214.5M | 62% | High risk67 | Flagged0.017 |
| 21G00059BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 2, SEGMENT 3, PACKAGE A, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱161.8M | 35% | High risk63 | Flagged0.014 |
| 21G00030ROAD WIDENING - BACOLOD NORTH RD K0113+429 - K0114+582 | Region VI | Region VI | On-Going | ₱46M | 0% | Medium risk47 | Flagged0.013 |
| 23HK0064SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SHORE PROTECTION/SEAWALL, BRGY. CAPIÑAHAN, BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 100% | High risk81 | Flagged0.013 |
| 23G00041BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 1, SEGMENT 3, PHASE 3, TALISAY CITY, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱100.4M | 78% | High risk62 | Flagged0.009 |
| 21J00035BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF THE MULTI-PURPOSE FACILITY (GYMNASIUM), DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR | Region IX | Region IX | On-Going | ₱181.5M | 100% | High risk65 | Flagged0.004 |
| 18G00093REHABILITATION OF SHORE PROTECTION IN BRGYS. CANJUSA AND TAPONG | Region VI | Region VI | Completed | ₱11.9M | 100% | High risk65 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 351 | 18GO0167CONSTRUCTION OF TWO (2) STOREY- FOUR(4) LABORATORY ( 2 SCIENCE LAB & 2 ICT) AT TEOFILO M. GENSOLI SR . NATIONAL HIGH SCHOOL, BRGY. VISTA ALEGRE, BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱18.2M | 100% | Medium risk40 | —-0.043 |
| 352 | 18GO0155CONSTRUCTION OF TWO (2) STOREY-FOUR(4) LABORATORY ( 2 SCIENCE LAB & 2 ICT) AT FR. GRATIAN MURRAY, AFSC INTEGRATED SCHOOL ( BUILDING B), BRGY. GRANADA, BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱18.2M | 100% | Medium risk40 | —-0.045 |
| 353 | 18GO0150CONSTRUCTION OF TWO (2) STOREY-FOUR(4) LABORATORY ( 2 SCIENCE LAB & 2 ICT LAB) AT FR. GRATIAN MURRAY AFSC IS, BRGY. GRANADA, BACOLOD CITY (BUILDING A) | Negros Island Region | Bacolod City DEO | Completed | ₱18.2M | 100% | Medium risk40 | —-0.045 |
| 354 | 18GL0084CONSTRUCTION OF 1-UNIT 2-STOREY 10-CLASSROOM (9.5M X 54M) SCHOOL BUILDING AT PAYAO NATIONAL HIGH SCHOOL, BINALBAGAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱24M | 100% | Medium risk38 | —-0.042 |
| 355 | 16GM0096CONSTRUCTION OF SENIOR HIGH SCHOOL CLASSROOMS (2 UNIT 3STY 12CL) AT TABUGON NATIONAL HIGH SCHOOL, KA | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱38.7M | 100% | Medium risk37 | —-0.015 |
| 356 | 17RD0047CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYMNASIUM), EVA J.MONTILLA NATIONAL SCHOOL, CAUAYAN, NEGROS | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱2.4M | 100% | Medium risk37 | —-0.058 |
| 357 | 17RD0048CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYMNASIUM), BRGY. TALACDAN NATIONAL HIGH SCHOOL, CAUAYAN, NE | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱2.4M | 100% | Medium risk36 | —-0.059 |
| 358 | 18GM0132CONSTRUCTION OF 1 UNIT TWO (2) STOREY ICT LABORATORY BUILDING AT CANINGAY NHS,CANDONI, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.3M | 100% | Medium risk35 | —-0.045 |
| 359 | 18GM0131CONSTRUCTION OF 1 UNIT TWO (2) STOREY SCIENCE LABORATORY BUILDING AT TABU NHS, ILOG, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.2M | 100% | Medium risk35 | —-0.046 |
| 360 | 18GM0149CONSTRUCTION OF 1 UNIT TWO (2) STOREY ICT LABORATORY BUILDING AT TAPI NATIONAL HIGH SCHOOL, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.1M | 100% | Medium risk35 | —-0.046 |
| 361 | 18GM0179CONSTRUCTION OF ONE (1) UNIT TWO (2) STOREY REGULAR WORKSHOP BUILDING AT TAPI NATIONAL HIGH SCHOOL, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9M | 100% | Medium risk35 | —-0.046 |
| 362 | 18GM0112CONSTRUCTION OF 1 UNIT TWO (2) STOREY SCIENCE LABORATORY BUILDING AT TAPI NATIONAL HIGH SCHOOL, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.1M | 100% | Medium risk35 | —-0.046 |
| 363 | 18GM0194CONSTRUCTION OF ONE (1) UNIT TWO (2) STOREY ICT LABORATORY BUILDING AT ANDULAUAN NHS-ILOG POBLACION EXT., ILOG, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9M | 100% | Medium risk35 | —-0.047 |
| 364 | 18GM0156CONSTRUCTION OF 1 UNIT TWO (2) STOREY ICT LABORATORY BUILDING AT CULIPAPA NATIONAL HIGH SCHOOL, HINOBA-AN (ASIA), NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱9.1M | 100% | Medium risk35 | —-0.044 |
| 365 | 18GM0123CONSTRUCTION OF 1 UNIT THREE (3) STOREY REGULAR WORKSHOP BUILDING AT TAMPALON NHS, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱13.2M | 100% | Medium risk35 | —-0.046 |
| 366 | 18GM0124CONSTRUCTION OF 1 UNIT THREE (3) STOREY REGULAR WORKSHOP BUILDING AT TAPI NATIONAL HIGH SCHOOL, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱13.2M | 100% | Medium risk35 | —-0.046 |
| 367 | 17RD0056CONSTRUCTION OF SENIOR HIGH SCHOOL CLASSROOMS (2 UNITS, 3STY12CL) AT BINICUIL NATIONAL HIGH SCHOOL, | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱37.2M | 100% | Medium risk35 | —-0.011 |
| 368 | 17RD0039CONSTRUCTION OF CLASSROOMS (1 UNIT, 2STY12CL) AT SIPALAY CITY NATIONAL HIGH SCHOOL, SIPALAY CITY, NE | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱14M | 100% | Medium risk35 | —-0.016 |
| 369 | 17RD0038CONSTRUCTION OF CLASSROOMS (1 UNIT, 2STY10CL) AT GENARO P. ALVAREZ ELEMENTARY SCHOOL, SIPALAY CITY, | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱12.2M | 100% | Medium risk35 | —-0.016 |
| 370 | 17RD0169CONSTRUCTION OF CLASSROOMS (1UNIT 2STY 12CL) AT FILOMENA G. GEQUILLANA ELEMENTARY SCHOOL, ILOG, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱24.6M | 100% | Medium risk34 | —-0.020 |
| 371 | 16GM0093CONSTRUCTION OF SENIOR HIGH SCHOOL CLASSROOMS (1 UNIT 3 STY 12 CL) AT TAMPALON NATIONAL HIGH SCHOOL, | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱19.2M | 100% | Medium risk34 | —-0.019 |
| 372 | 16GM0094CONSTRUCTION OF SENIOR HIGH SCHOOL CLASSROOMS (1 UNIT 3 STY 12CL) AT TAPI NATIONAL HIGH SCHOOL, KABA | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱19.2M | 100% | Medium risk34 | —-0.021 |
| 373 | 16RD0001CONSTRUCTION OF CLASSROOMS (1UNIT, 2STY8CL) AT CAMANSI NHS, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱14.2M | 100% | Medium risk34 | —-0.024 |
| 374 | 17RD0037CONSTRUCTION OF CLASSROOMS (1 UNIT, 2STY10CL) AT TAN-AWAN NATIONAL HIGH SCHOOL, KABANKALAN CITY, NEG | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱13.5M | 100% | Medium risk34 | —-0.025 |
| 375 | 17RD0033CONSTRUCTION OF CLASSROOMS ( 1 UNIT 2STY6CL) AT BASAK ES, CAUAYAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱7.9M | 100% | Medium risk34 | —-0.024 |