Contractor dossier
400 projects on file, including joint ventures this contractor is part of.
Total projects
400
Total budget
₱21.1B
Average progress
97.4%
Completion rate
91.5%
Average risk score
51.4
Medium risk on average, out of 100
Flagged as unusual
23
5.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Negros Island Region | 248 | ₱9.1B | 48.3 | 4 | 99.8% |
| Region VI | 71 | ₱4B | 56.6 | 9 | 93.3% |
| National Capital Region | 17 | ₱1.2B | 55.0 | 3 | 93.6% |
| Region IV-A | 17 | ₱1.1B | 54.4 | 0 | 100.0% |
| Region IV-B | 10 | ₱1.8B | 57.7 | 0 | 100.0% |
| Region VIII | 9 | ₱715.4M | 58.4 | 0 | 97.1% |
| Region VII | 8 | ₱1.1B | 63.4 | 5 | 55.7% |
| Region XI | 5 | ₱481M | 59.6 | 0 | 100.0% |
| Region X | 4 | ₱232M | 52.4 | 0 | 99.3% |
| Region IX | 3 | ₱376.1M | 69.3 | 2 | 100.0% |
| Region III | 3 | ₱431.7M | 50.6 | 0 | 100.0% |
| Region XIII | 3 | ₱289.5M | 43.8 | 0 | 100.0% |
| Region II | 2 | ₱193M | 54.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 143 | ₱8.7B | 52.4 | 4 | 97.9% |
| Flood Control and Drainage | 110 | ₱7.2B | 55.1 | 8 | 96.4% |
| Buildings and Facilities | 87 | ₱2.5B | 40.2 | 3 | 98.0% |
| Bridges | 39 | ₱1.1B | 49.1 | 2 | 99.4% |
| OTHER | 16 | ₱1.4B | 76.8 | 6 | 95.6% |
| GAA 2025 OO-1 | 2 | ₱99.2M | 94.2 | 0 | 87.7% |
| Water Provision and Storage | 2 | ₱97.5M | 48.0 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱35.1M | 87.0 | 0 | 59.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GM0004RECONSTRUCTION TO CONCRETE PAVEMENT - BACOLOD SOUTH RD (KABANKALAN-HINOBAAN SECTION) - K0177+900 - K0179+730, K0182+645 - K0182+903, SIPALAY CITY AND HINOBAAN, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | On-Going | ₱53.1M | 89% | High risk95 | —-0.004 |
| 25G00010REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - PANGANTA BR. (B00356PN) ALONG ILOILO-ANTIQUE RD | Region VI | Region VI | On-Going | ₱46.1M | 87% | High risk94 | —-0.002 |
| 24G00129CONSTRUCTION OF NEW COLLEGE OF LAW BUILDING, UP VISAYAS ILOILO- UNIVERSITY OF THE PHILIPPINES SYSTEM | Region VI | Region VI | On-Going | ₱99.5M | 59% | High risk92 | Flagged0.071 |
| 24GK0232CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALULAN RIVER, MANAPLA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱144.7M | 90% | High risk90 | Flagged0.054 |
| 25GO0029CONSTRUCTION OF REVETMENT, SUM-AG RIVER, BARANGAY SUM-AG, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | On-Going | ₱35.1M | 59% | High risk87 | —-0.012 |
| 24G00049CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG PANAY RIVER BASIN, BARANGAY STO. NIÑO, DUMALAG, CAPIZ | Region VI | Region VI | On-Going | ₱283.1M | 82% | High risk84 | Flagged0.035 |
| 18GP0111SIGMA BY-PASS ROAD INCL.ROW, CAPIZ | Region VI | Capiz 2nd DEO | Completed | ₱82.5M | 100% | High risk81 | —-0.022 |
| 23HK0064SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SHORE PROTECTION/SEAWALL, BRGY. CAPIÑAHAN, BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 100% | High risk81 | Flagged0.013 |
| 18GL0061CONSTRUCTION OF BINALBAGAN RIVER BANK SLOPE PROTECTION (UPSTREAM OF BINALBAGANBAGACAY BRIDGE) ALONG HINIGARAN- ISABELA ROAD, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱91.3M | 100% | High risk76 | —-0.024 |
| 19GM0003RECONSTRUCTION TO CONCRETE PAVEMENT/ASPHALT OVERLAY - AT SPECIFIC LOCATIONS ALONG BACOLOD SOUTH RD (S00274NR) K0084+(-179) - K0084+512, K0084+512 - K0085+070, K0085+217 - K0085+608, K0087+786 - K0088+235, KABANKALAN CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱49M | 100% | High risk76 | —-0.034 |
| 17RC0022REHABILITATION/RECONSTRUCTION OF NATIONALROADS WITH SLIPS, SOIL COLLAPSE AND LAND SLIDE ALONG VALLEHERMOSO-CANLA-ON CITY-LA CASTELLANA ROAD, LA CASTELLANA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 2nd DEO | Completed | ₱48.2M | 100% | High risk75 | —-0.034 |
| 19GM0053CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, NRJ LEADING TO SUGAR BEACH RESORT AND LANGUB BEACH RESORT, BRGY. NAUHANG, SIPALAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 3rd DEO | Completed | ₱39.2M | 100% | High risk74 | —-0.033 |
| 17RA0048CONSTRUCTION/UPGRADING/ REHABILITATION OFDRAINAGE ALONG PLAZA CAPITOL ROAD K0001+ (-650)TO K0001+300, BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱19.6M | 100% | High risk74 | —-0.030 |
| 17RA0044CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG BACOLOD NORTH RD., K0001+670-K0003+620, K0003+629-K0004+267 BACOLOD CITY | Negros Island Region | Bacolod City DEO | Completed | ₱34.2M | 100% | High risk74 | —-0.012 |
| 20GO0107WIDENING/ IMPROVEMENT/ UPGRADING OF HONORATA MANALO ( BURI ROAD), BRGY. MANDALAGAN , BACOLOD CITY | Negros Island Region | Bacolod City DEO | Terminated | ₱10.6M | 100% | High risk74 | Flagged0.002 |
| 17R00030CONSTRUCTION OF TOURISM WATER (TOUWA) SUPPLY IN MURCIA, NEGROS OCCIDENTAL, MURCIA, NEGROS OCCIDENTAL 3RD LD | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱95.5M | 100% | High risk74 | —-0.017 |
| 21GN0063ROAD WIDENING - DON JORGE ARANETA - AYUNGON - YUNGUE - GURREA - LA CARLOTA CITY (S00208NR) - CHAINAGE 2900 - CHAINAGE 4150, LA CARLOTA CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱39.4M | 100% | High risk74 | —-0.033 |
| 22GO0093OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING / CONSTRUCTION ALONG BACOLOD-CITY BDRY RD (S00096NR) K0006 + 220 - K0007 + 130, K0008 + 605 - K0008 + 989, K0009 + 228 - K0009 + 798 | Negros Island Region | Bacolod City DEO | Completed | ₱19.6M | 100% | High risk74 | —-0.016 |
| 23HO0315CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT PUROK BALANGHOY, BARANGAY YLAYA, | Region VII | Cebu 7th DEO | On-Going | ₱38.3M | 0% | High risk74 | Flagged0.063 |
| 24G00145CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE I), STA. BARBARA, ILOILO | Region VI | Region VI | On-Going | ₱98.1M | 1% | High risk72 | Flagged0.063 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24G00129CONSTRUCTION OF NEW COLLEGE OF LAW BUILDING, UP VISAYAS ILOILO- UNIVERSITY OF THE PHILIPPINES SYSTEM | Region VI | Region VI | On-Going | ₱99.5M | 59% | High risk92 | Flagged0.071 |
| 24G00145CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE I), STA. BARBARA, ILOILO | Region VI | Region VI | On-Going | ₱98.1M | 1% | High risk72 | Flagged0.063 |
| 23HO0315CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT PUROK BALANGHOY, BARANGAY YLAYA, | Region VII | Cebu 7th DEO | On-Going | ₱38.3M | 0% | High risk74 | Flagged0.063 |
| 24GK0232CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALULAN RIVER, MANAPLA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | On-Going | ₱144.7M | 90% | High risk90 | Flagged0.054 |
| 18OE0269CONSTRUCTION OF FOUR (4) STOREY TWENTY EIGHT (28) CLASSROOM SCHOOL BUILDING AT MABINI ELEMENTARY SCHOOL QUIAPO, MANILA CITY (BASED ON 2017 PLAN, REVISED 3-24-17) | National Capital Region | North Manila DEO | Completed | ₱221M | 100% | High risk71 | Flagged0.052 |
| 24GR0001CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL), MINA, ILOILO | Region VI | Iloilo 6th DEO | On-Going | ₱59.3M | 27% | High risk68 | Flagged0.045 |
| 24G00049CONSTRUCTION OF RIVER CONTROL STRUCTURE ALONG PANAY RIVER BASIN, BARANGAY STO. NIÑO, DUMALAG, CAPIZ | Region VI | Region VI | On-Going | ₱283.1M | 82% | High risk84 | Flagged0.035 |
| 22O00105ACTIVE TRANSPORT BIKE SHARE SYSTEM AND SAFE PATHWAYS PROGRAM IN METROPOLITAN AREAS - CONSTRUCTION OF PUBLIC TRANSPORT STOPS AND ESTABLISHMENT OF END-OF-TRIP FACILITIES | National Capital Region | National Capital Region | On-Going | ₱40.7M | 2% | Medium risk50 | Flagged0.034 |
| 23H00053OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGMT. PROG., CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF LOBOC RIVER CONTROL STRUCTURE, TAMBANGAN SECTION (LEFT SIDE), LOAY, BOHOL | Region VII | Region VII | On-Going | ₱236.4M | 0% | High risk67 | Flagged0.033 |
| 23H00054OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MGMT. PROG., CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF LOBOC RIVER CONTROL STRUCTURE, TAMBANGAN SECTION (RIGHT SIDE), LOAY, BOHOL | Region VII | Region VII | On-Going | ₱236.3M | 0% | High risk67 | Flagged0.033 |
| 23HL0110ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: FLOOD MANAGEMENT PROGRAM: CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF PALINPINON RIVER CONTROL, VALENCIA, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | On-Going | ₱96.5M | 100% | High risk72 | Flagged0.026 |
| 22O00107ACTIVE TRANSPORT BIKE SHARE SYSTEM AND SAFE PATHWAYS PROGRAM IN METROPOLITAN AREAS MAINTENANCE AND UPGRADING OF ACTIVE TRANSPORT INFRASTRUCTURE PHASE I | National Capital Region | National Capital Region | On-Going | ₱105.9M | 90% | High risk65 | Flagged0.022 |
| 19J00083CONSTRUCTION OF NEW BRIDGE- ALONG LABANGAN-PAGADIAN CITY-DUMALINAO ROAD | Region IX | Region IX | On-Going | ₱93.6M | 100% | High risk72 | Flagged0.018 |
| 23H00012OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROG, CONSTN/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF LOBOC RIVER CONTROL STRUCTURE, UGPONG SECTION, LOBOC, BOHOL | Region VII | Region VII | On-Going | ₱214.5M | 62% | High risk67 | Flagged0.017 |
| 21G00059BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 2, SEGMENT 3, PACKAGE A, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱161.8M | 35% | High risk63 | Flagged0.014 |
| 21G00030ROAD WIDENING - BACOLOD NORTH RD K0113+429 - K0114+582 | Region VI | Region VI | On-Going | ₱46M | 0% | Medium risk47 | Flagged0.013 |
| 23HK0064SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SHORE PROTECTION/SEAWALL, BRGY. CAPIÑAHAN, BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 100% | High risk81 | Flagged0.013 |
| 23G00041BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 1, SEGMENT 3, PHASE 3, TALISAY CITY, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱100.4M | 78% | High risk62 | Flagged0.009 |
| 21J00035BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - CONSTRUCTION OF THE MULTI-PURPOSE FACILITY (GYMNASIUM), DAO, PAGADIAN CITY, ZAMBOANGA DEL SUR | Region IX | Region IX | On-Going | ₱181.5M | 100% | High risk65 | Flagged0.004 |
| 18G00093REHABILITATION OF SHORE PROTECTION IN BRGYS. CANJUSA AND TAPONG | Region VI | Region VI | Completed | ₱11.9M | 100% | High risk65 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 17RB0218CONSTRUCTION OF FARM TO MILL ROAD OF SITIO BAYUSAN, BRGY. SAN FERNANDO (STA. 0+000 - STA. 0+851), TALISAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱14.7M | 100% | High risk64 | —-0.012 |
| 77 | 18G00097REHABILITATION OF SHORE PROTECTION AT BRGY. PATIC, BRGY. UTOD, AND BRGY. PALAKA NORTE INCLUDING UPGRADING OF BOX CULVERT | Region VI | Region VI | Completed | ₱9.1M | 100% | High risk63 | Flagged0.001 |
| 78 | 22GI0015CONSTRUCTION OF AGANAN FLOOD CONTROL STRUCTURE (JARO-AGANAN RIVER), BRGY. MAMBAWI, ALIMODIAN, ILOILO | Region VI | Iloilo 4th DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.056 |
| 79 | 17RB0220CONSTRUCTION OF FARM TO MILL ROAD OF NATIONAL HIGHWAY, BRGY. LUNA TO BRGY. ANDRES BONIFACIO (STA. 0+200 - STA. 1+440), CADIZ CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱19.3M | 100% | High risk63 | —-0.010 |
| 80 | 20G00006CONSTRUCTION OF CONCRETE ROAD - BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 2, PACKAGE C, BACOLOD CITY | Region VI | Region VI | Completed | ₱140.4M | 100% | High risk63 | —-0.044 |
| 81 | 21DN0135CONSTRUCTION OF TAYTAY SPORTS COMPLEX TAYTAY, RIZAL | Region IV-A | Rizal 1st DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.087 |
| 82 | 21G00059BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 2, SEGMENT 3, PACKAGE A, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱161.8M | 35% | High risk63 | Flagged0.014 |
| 83 | 17HK0147NATIONAL BUILDING PROGRAM: BUILDINGS AND OTHER STRUCTURES: MULTI-PURPOSE/FACILITIES-CONSTRUCTION OF DPWH NEGROS ORIENTAL 2ND DEO OFFICE BUILDING, CANGMATING, SIBULAN | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱31.1M | 100% | High risk63 | —-0.045 |
| 84 | 22GH0028CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BAROTAC VIEJO RIVER, STA. 4+324.44 - STA. 3+514.10, BRGY. NATIVIDAD, BAROTAC VIEJO, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.056 |
| 85 | 20G00019CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SIPALAY RIVER, SIPALAY CITY, NEGROS OCCIDENTAL | Region VI | Region VI | Completed | ₱96.4M | 100% | High risk62 | —-0.058 |
| 86 | 24GK0190CONSTRUCTION OF DRAINAGE STRUCTURE AT BRGY. MAQUILING, BRGY. MAGSAYSAY AND BRGY. LOPEZ JAENA, SAGAY CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.056 |
| 87 | 19GK0154CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALOGO RIVER (BOTH STREAM) ,ABUT. B VICTORIAS CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱94M | 100% | High risk62 | —-0.052 |
| 88 | 19GK0153CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALOGO RIVER (BOTH STREAM), ABUT. A EB. MAGALONA, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱93.6M | 100% | High risk62 | —-0.052 |
| 89 | 19G00069CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG SIPALAY RIVER, SIPALAY CITY, NEGROS OCCIDENTAL | Region VI | Region VI | Completed | ₱96.5M | 100% | High risk62 | —-0.058 |
| 90 | 22IB0111REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE SECONDARY ROADS, WRIGHT - TAFT - BORONGAN ROAD, K0863+960 - K0864+080 | Region VIII | Eastern Samar DEO | On-Going | ₱94.1M | 85% | High risk62 | —-0.026 |
| 91 | 23GO0017CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF REVETMENT WITH FLOODWALL INCLUDING IMPROVEMENT OF RIVERBANK (WITH ESPLANADE) ALONG SUM-AG RIVER, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.047 |
| 92 | 23HK0088SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF RIVER CONTROL, BRGY. TAMISU, BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱96.5M | 100% | High risk62 | —-0.017 |
| 93 | 23HK0086SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF RIVER CONTROL, POBLACION, AMLAN, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.054 |
| 94 | 22IB0118REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, WRIGHT - TAFT - BORONGAN ROAD K0872+658 - K0872+758 | Region VIII | Eastern Samar DEO | On-Going | ₱94.8M | 100% | High risk62 | —-0.031 |
| 95 | 23G00041BACOLOD NEGROS OCCIDENTAL ECONOMIC HIGHWAY (BANOCEH), SECTION 1, SEGMENT 3, PHASE 3, TALISAY CITY, NEGROS OCCIDENTAL | Region VI | Region VI | On-Going | ₱100.4M | 78% | High risk62 | Flagged0.009 |
| 96 | 17R00021CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS - WIDENING OF PERMANENT BRIDGES, INCLUDING ROW - TO MORE THAN TWO LANES - TAYUM-AN BR. (B00301NR) ALONG BACOLOD-MURCIA-DS BENEDICTO-SN CARLOS CITY RD, MURCIA, NEGROS OCCIDENTAL 3RD LD | Negros Island Region | Negros Occidental 1st DEO | Completed | ₱54.8M | 100% | High risk62 | —-0.032 |
| 97 | 22IB0120REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, WRIGHT - TAFT - BORONGAN ROAD K0872+258 - K0872+358 | Region VIII | Eastern Samar DEO | On-Going | ₱96.1M | 96% | High risk62 | —-0.028 |
| 98 | 22IB0110REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE SECONDARY ROADS, WRIGHT - TAFT - BORONGAN ROAD, K0864+420 - K0864+540 | Region VIII | Eastern Samar DEO | On-Going | ₱96M | 97% | High risk62 | —-0.029 |
| 99 | 23GO0014CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF REVETMENT WITH FLOODWALL INCLUDING IMPROVEMENT OF RIVERBANK ALONG MAGSUNGAY RIVER, BACOLOD CITY, NEGROS OCCIDENTAL | Negros Island Region | Bacolod City DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.056 |
| 100 | 22E00119CLUSTER 20: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-REHAB. OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG ITABIAK-SAN VICENTE ROAD, SAN VICENTE, PALAWAN, 20.1: STA. 167+325-STA. 167+445; 20.2: STA. 169+254-STA. 169+405; 20.3: | Region IV-B | Region IV-B | Completed | ₱257.1M | 100% | High risk61 | —-0.033 |