Contractor dossier
147 projects on file, including joint ventures this contractor is part of.
Total projects
147
Total budget
₱5.8B
Average progress
73.2%
Completion rate
52.4%
Below 70%
Average risk score
53.8
Medium risk on average, out of 100
Flagged as unusual
27
18.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 146 | ₱5.8B | 53.9 | 27 | 73.1% |
| National Capital Region | 1 | ₱33.2M | 45.8 | 0 | 92.3% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 72 | ₱4.6B | 67.5 | 25 | 59.2% |
| Buildings and Facilities | 42 | ₱697.5M | 40.3 | 1 | 83.0% |
| Roads | 29 | ₱424.9M | 40.9 | 0 | 91.7% |
| Bridges | 2 | ₱21.8M | 21.6 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱38.2M | 71.2 | 1 | 50.9% |
| OTHER | 1 | ₱24M | 62.6 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CC0606CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABANGAN CHANNEL, PACKAGE B, BARANGAY SANTA ELENA - BARANGAY TIBAGUIN, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.8M | 0% | High risk83 | Flagged0.058 |
| 24CC0592CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, PACKAGE A, BARANGAY TAAL-BARANGAY SANTO CRISTO, PULILAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.8M | 0% | High risk83 | Flagged0.057 |
| 24CC0604CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAYCAPIZ-TALIPTIP RIVER, PACKAGE B, BARANGAY PEREZ, BULAKAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 0% | High risk83 | Flagged0.057 |
| 24CC0588CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KALERO RIVER, PACAKGE B, BARANGAY PANASAHAN, MALOLOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.8M | 0% | High risk83 | Flagged0.058 |
| 24CC0605CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABANGAN CHANNEL, PACKAGE A, BARANGAY SANTA ELENA - BARANGAY TIBAGUIN, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱96.3M | 100% | High risk83 | Flagged0.030 |
| 24CC0602CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAYCAPIZ-TALIPTIP RIVER, PACKAGE A, BARANGAY PEREZ, BULAKAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱96.5M | 100% | High risk83 | Flagged0.029 |
| 25CC0251CONSTRUCTION OF FLOOD CONTROL STRUCTURE (REVETMENT), PUROK 1 TO PUROK 2, BARANGAY SAN ROQUE, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.7M | 0% | High risk81 | Flagged0.004 |
| 25CC0246CONSTRUCTION OF REINFORCED CONCRETE RIVER WALL ALONG BALAGTAS RIVER, PUROK 1, BARANGAY DALIG, BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.8M | 0% | High risk81 | Flagged0.004 |
| 25CC0301CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PUROK 1, BARANGAY BAGONG SILANG, PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.8M | 0% | High risk81 | Flagged0.004 |
| 25CC0300CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PUROK 3, BARANGAY BULIHAN, PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 78% | High risk81 | —-0.018 |
| 25CC0091CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER AT BARANGAY BULUSAN (PUROK 4 TO PUROK 5), CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.7M | 0% | High risk81 | Flagged0.005 |
| 25CC0249CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT PUROK 1, BARANGAY BULIHAN, PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 0% | High risk81 | Flagged0.004 |
| 25CC0245CONSTRUCTION OF FLOOD CONTROL STRUCTURE (PACKAGE A) AT PUROK 2, BARANGAY MALIS, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 0% | High risk81 | Flagged0.004 |
| 25CC0247CONSTRUCTION OF FLOOD CONTROL STRUCTURE (REVETMENT), PUROK 3 TO PUROK 4, BARANGAY MANATAL, PANDI, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱96.5M | 0% | High risk80 | Flagged0.004 |
| 25CC0197CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER AT BARANGAY SAN MIGUEL (SITIO DULONG DIKE), CALUMPIT BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱96.5M | 0% | High risk79 | Flagged0.005 |
| 25CC0195CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER AT BARANGAY SANTO CRISTO-BARANGAY TAAL, PULILAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱96.5M | 0% | High risk79 | Flagged0.004 |
| 25CC0110CONSTRUCTION OF CONCRETE SLOPE PROTECTION STRUCTURE, PUROK 5, BARANGAY MALIS, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱96.5M | 67% | High risk79 | —-0.012 |
| 25CC0093CONSTRUCTION OF CONCRETE SLOPE PROTECTION STRUCTURE, PUROK 1, BARANGAY PRITIL, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱96.5M | 69% | High risk79 | —-0.012 |
| 24CC0645CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER, BARANGAY MANATAL (PUROK 1), PANDI, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.2M | 71% | High risk79 | Flagged0.029 |
| 24CC0669CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY MALIS (PUROK 4 TO PUROK 5), GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 90% | High risk79 | Flagged0.025 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CC0606CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABANGAN CHANNEL, PACKAGE B, BARANGAY SANTA ELENA - BARANGAY TIBAGUIN, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.8M | 0% | High risk83 | Flagged0.058 |
| 24CC0588CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KALERO RIVER, PACAKGE B, BARANGAY PANASAHAN, MALOLOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.8M | 0% | High risk83 | Flagged0.058 |
| 24CC0604CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAYCAPIZ-TALIPTIP RIVER, PACKAGE B, BARANGAY PEREZ, BULAKAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 0% | High risk83 | Flagged0.057 |
| 24CC0592CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, PACKAGE A, BARANGAY TAAL-BARANGAY SANTO CRISTO, PULILAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.8M | 0% | High risk83 | Flagged0.057 |
| 24CC0656CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABANGAN CHANNEL AT BARANGAY PUGAD, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱69.5M | 0% | High risk76 | Flagged0.050 |
| 24CC0662CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALOLOS RIVER AT PARALUMAN, BARANGAY CANIOGAN, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱69.6M | 0% | High risk77 | Flagged0.049 |
| 24CC0605CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABANGAN CHANNEL, PACKAGE A, BARANGAY SANTA ELENA - BARANGAY TIBAGUIN, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱96.3M | 100% | High risk83 | Flagged0.030 |
| 24CC0602CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAYCAPIZ-TALIPTIP RIVER, PACKAGE A, BARANGAY PEREZ, BULAKAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱96.5M | 100% | High risk83 | Flagged0.029 |
| 24CC0645CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER, BARANGAY MANATAL (PUROK 1), PANDI, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.2M | 71% | High risk79 | Flagged0.029 |
| 24CC0613CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG BOCAUE RIVER, STA. 1+200 - STA. 1+360, BARANGAY TAAL, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱48.2M | 78% | High risk74 | Flagged0.027 |
| 24CC0669CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY MALIS (PUROK 4 TO PUROK 5), GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 90% | High risk79 | Flagged0.025 |
| 24CC0637CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY DAUNGAN (PUROK 1 TO PUROK 3), GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 96% | High risk79 | Flagged0.022 |
| 24CC0594CONSTRUCTION O FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER, PACAKGE A, BARANGAY SAN MIGUEL-BARANGAY MEYSULAO, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱72.4M | 100% | High risk76 | Flagged0.022 |
| 24CC0664CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABANGAN CHANNEL, BARANGAY PALAPAT (PUROK 6 TO PUROK 7), HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.7M | 100% | High risk78 | Flagged0.022 |
| 24CC0649CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAMBOG RIVER, BARANGAY MATIMBO (PUROK BAOG), MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱77.2M | 100% | High risk77 | Flagged0.021 |
| 25CC0091CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER AT BARANGAY BULUSAN (PUROK 4 TO PUROK 5), CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.7M | 0% | High risk81 | Flagged0.005 |
| 25CC0197CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER AT BARANGAY SAN MIGUEL (SITIO DULONG DIKE), CALUMPIT BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱96.5M | 0% | High risk79 | Flagged0.005 |
| 25CC0195CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER AT BARANGAY SANTO CRISTO-BARANGAY TAAL, PULILAN, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱96.5M | 0% | High risk79 | Flagged0.004 |
| 25CC0301CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PUROK 1, BARANGAY BAGONG SILANG, PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.8M | 0% | High risk81 | Flagged0.004 |
| 25CC0245CONSTRUCTION OF FLOOD CONTROL STRUCTURE (PACKAGE A) AT PUROK 2, BARANGAY MALIS, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 0% | High risk81 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 24CC0356CONSTRUCTION OF RIVER PROTECTION STRUCTURE, BARANGAY MALIBONG BATA, PANDI, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱39.6M | 96% | High risk69 | —-0.029 |
| 77 | 25CC0285CONSTRUCTION OF REVETMENT AT BARANGAY CALERO, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱39.2M | 0% | High risk69 | —-0.004 |
| 78 | 24CC0357CONSTRUCTION OF REVETMENT AT CARILLO-ABULALAS ALONG ANGAT RIVER AT HAGONOY, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱38.6M | 100% | High risk69 | —-0.063 |
| 79 | 25CC0214REHABILITATION OF ROAD AT BARANGAY GUGO, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱7.6M | 92% | High risk69 | —-0.039 |
| 80 | 24CC0367CONSTRUCTION OF REVETMENT AT STA. ELENA-SAN PEDRO ALONG ANGAT RIVER AT HAGONOY, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱38.6M | 100% | High risk69 | —-0.063 |
| 81 | 25CC0248CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT PUROK 2, BARANGAY BULIHAN, PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱46.4M | 0% | High risk69 | —-0.004 |
| 82 | 25CC0241CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER PUROK 2, BARANGAY SAN JUAN, BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱46.4M | 0% | High risk69 | —-0.005 |
| 83 | 24CC0413REHABILITATION OF ROAD PUROK 1,2 AND 6, BARANGAY BARANGCA, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱9.9M | 100% | High risk69 | —-0.067 |
| 84 | 21CC0197CONSTRUCTION OF SAN PEDRO-POBLACION ROAD, BISTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱24M | 100% | High risk63 | —-0.041 |
| 85 | 23CC0451CONSTRUCTION OF 2-UNITS 2STRY10CL, STA. ISABEL ES, CITY OF MALOLOS (CAPITAL), BULACAN | Region III | Bulacan 1st DEO | Completed | ₱79.4M | 100% | High risk60 | —-0.014 |
| 86 | 23CC0413CONCRETING OF SAN MIGUEL TO CARILLO FMR, BRGY. SAN MIGUEL AND BRGY. CARILLO, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱5.1M | 100% | Medium risk60 | —-0.013 |
| 87 | 23CC0097CONSTRUCTION OF RIVER CONTROL PROJECT ALONG BOCAUE RIVER, IGULOT SECTION (TRIBUTARY), STA. 05+280 TO STA. 05+610, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | Medium risk56 | —-0.081 |
| 88 | 24C00587BASIC EDUCATIONAL FACILITIES FUND (BEFF)-CONSTRUCTION OF ELEM. AND SECONDARY CLASSROOMS UNDER THE DEPED'S BASIC EDUC. FACILITIES FUND:CONSTRUCTION OF 2-STOREY 6-CLASSROOM SCHOOL BUILDING IN SALACOT ELEM. SCHOOL, BRGY. SALACOT, SAN MIGUEL, BUL. | Region III | Region III | On-Going | ₱19.7M | 100% | Medium risk52 | Flagged0.001 |
| 89 | 25OA0015CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MARALA RIVER, NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | On-Going | ₱33.2M | 92% | Medium risk46 | —-0.054 |
| 90 | 23CC0301CONSTRUCTION OF MULTI-PURPOSE BUILDING, SAN AGUSTIN ELEMENTARY SCHOOL, BARANGAY SAN AGUSTIN, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱49.5M | 41% | Medium risk40 | —-0.033 |
| 91 | 23C00299BASIC INFRASTRUCTURE PROGRAM-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYMNASIUM) MALIBAY ELEM. SCHOOL, BRGY. MALIBAY, SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱14.6M | 100% | Medium risk36 | —-0.061 |
| 92 | 21CC0196REHABILITATION OF ROAD, SANTIAGO, MARQUEZ, GERONA, GERMAN & CAPIRAL STS., DUHAT, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱4.9M | 100% | Medium risk35 | —-0.106 |
| 93 | 21CC0198CONCRETING OF ROAD, BARANGAY BUNDUCAN, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱4.9M | 100% | Medium risk35 | —-0.106 |
| 94 | 21CC0206CONSTRUCTION OF MULTI-PURPOSE BUILDING, POBLACION, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱19.8M | 100% | Medium risk35 | —-0.100 |
| 95 | 24CC0199CONSTRUCTION OF REINFORCED CONCRETE SLOPE REVETMENT AT BARANGAY TIKAY, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱67.5M | 100% | Medium risk35 | —-0.091 |
| 96 | 24CC0121CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY CALIZON, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱19.8M | 100% | Medium risk35 | —-0.104 |
| 97 | 23CC0353CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY SAN ROQUE, PAOMBONG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱19.8M | 100% | Medium risk35 | —-0.104 |
| 98 | 24CD0016CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, BARANGAY PINAGTULAYAN, NORZAGARAY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱48.2M | 100% | Medium risk35 | —-0.094 |
| 99 | 24CC0198CONSTRUCTION OF REINFORCED CONCRETE SLOPE REVETMENT AT BARANGAY BULIHAN, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱62.7M | 100% | Medium risk35 | —-0.091 |
| 100 | 23C00305BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYMNASIUM) BALAONG ELEM. SCHOOL, BRGY. BALAONG, SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱14.6M | 100% | Medium risk35 | —-0.062 |