Opening the dossier…
Opening the dossier…
Contractor dossier
261 projects on file, including joint ventures this contractor is part of.
Total projects
261
Total budget
₱9.9B
Average progress
97.0%
Completion rate
92.0%
Average risk score
43.7
Medium risk on average, out of 100
Flagged as unusual
18
6.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-B | 165 | ₱6.5B | 42.8 | 9 | 99.4% |
| Region I | 23 | ₱976.1M | 52.5 | 8 | 79.8% |
| Negros Island Region | 20 | ₱897.1M | 52.6 | 0 | 96.4% |
| Region X | 18 | ₱52M | 9.7 | 0 | 100.0% |
| Region IV-A | 17 | ₱414.7M | 60.3 | 0 | 100.0% |
| Region XII | 5 | ₱243.2M | 31.3 | 0 | 100.0% |
| Region XI | 4 | ₱252.1M | 56.0 | 0 | 100.0% |
| National Capital Region | 3 | ₱132.7M | 50.0 | 0 | 69.0% |
| Region II | 2 | ₱42.8M | 43.1 | 0 | 100.0% |
| Region III | 1 | ₱28.7M | 78.6 | 1 | 100.0% |
| Region V | 1 | ₱110M | 65.3 | 0 | 62.5% |
| Region VII | 1 | ₱188M | 64.2 | 0 | 100.0% |
| Cordillera Administrative Region | 1 | ₱23.6M | 59.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 117 | ₱6.6B | 49.3 | 5 | 98.5% |
| Bridges | 47 | ₱901.9M | 40.7 | 1 | 98.2% |
| Buildings and Facilities | 44 | ₱372.1M | 21.7 | 7 | 92.7% |
| Flood Control and Drainage | 40 | ₱1.5B | 48.3 | 0 | 99.7% |
| OTHER | 4 | ₱149.4M | 75.2 | 3 | 85.8% |
| Water Provision and Storage | 4 | ₱17.5M | 38.5 | 0 | 100.0% |
| Bridges, Roads | 2 | ₱152.7M | 52.8 | 0 | 100.0% |
| GAA 2025 OO-1 | 1 | ₱83.8M | 94.3 | 1 | 41.7% |
| GAA 2025 SSP | 1 | ₱9.9M | 93.8 | 1 | 85.5% |
| GAA 2025 OO-2 | 1 | ₱101.1M | 93.1 | 0 | 47.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25A00267CONSTRUCTION OF MISSING LINKS/ NEW ROADS, SAN MANUEL (PANGASINAN) - ITOGON (BENGUET) ROAD, PANGASINAN (PACKAGE 6) | Region I | Region I | On-Going | ₱83.8M | 42% | High risk94 | Flagged0.018 |
| 25EF0095CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BRGY. CALATEGAS, NARRA, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱9.9M | 85% | High risk94 | Flagged0.033 |
| 25HK0059ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CALINDAGAN AND BARANG | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱101.1M | 48% | High risk93 | —-0.001 |
| 17CD0377CONCRETING OF FMR FROM KALAWAKAN PROPER TO PINTONG DUHAT, BRGY. KALAWAKAN, DOÑA REMEDIOS TRINIDAD, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱28.7M | 100% | High risk79 | Flagged0.008 |
| 17EB0086CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS- NEW CONSTRUCTION OF PERMANENT BRIDGES - IRIRON BR. ALONG JCT. MWCR LABANGAN-MURTHA-JCT IRIRON RD (PHASE II) | Region IV-B | Mindoro Occidental DEO | Completed | ₱92.6M | 100% | High risk76 | Flagged0.010 |
| 17LA0021WIDENING OF BANKEROHAN BRIDGE (B00071MN) INCLUDING APPROACHES, MONTEVISTA ALONG DAANG MAHARLIKA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱19.1M | 100% | High risk73 | —-0.018 |
| 25A00548CONVERGENCE AND SPECIAL SUPPORT PROGRAM - RAINWATER COLLECTOR SYSTEM | Region I | Region I | On-Going | ₱9M | 43% | High risk73 | Flagged0.011 |
| 24A00529REPAIR/REHABILITATION OF SCHOOL BUILDINGS WHICH WERE DAMAGED BY TYPHOON EGAY - CLUSTER I | Region I | Region I | Completed | ₱31.4M | 100% | High risk69 | —-0.079 |
| 17DG0006MFO1-CONST OF SLOPE PROTECTION ALONG TAG-TAAL LAKE ROAD, TAGAYTAY CITY; 7TH LD | Region IV-A | Cavite 2nd DEO | Completed | ₱29M | 100% | High risk67 | —-0.060 |
| 17DL0049B. MFO 2 - FLOOD MANAGEMENT SERVICES 1. CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS D. CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURES, SILANG RIVER, LOPEZ, QUEZON 4TH LD | Region IV-A | Quezon 4th DEO | Completed | ₱18.8M | 100% | High risk67 | —-0.057 |
| 17DL0050B. MFO 2 - FLOOD MANAGEMENT SERVICES 1. CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS F. CONSTRUCTION/REHABILITATION OF SANGIRIN RIVERBANK PROTECTION, PEREZ, QUEZON 4TH LD | Region IV-A | Quezon 4th DEO | Completed | ₱18.8M | 100% | High risk67 | —-0.058 |
| 17DG0010MFO1-ASPHALT OVERLAY W/ CORRECTIONS ALONG MARAGONDON-MAG-AMUYONG RD,MARAGONDON AND ALFONSO,CAVITE | Region IV-A | Cavite 2nd DEO | Completed | ₱34.2M | 100% | High risk67 | —-0.064 |
| 17DG0023MFO1-ASPHALT OVERLAY ALONG MAR-MAG-AMUYONG RD K0065+702-K0067-275,K0069+661-K0070+795-K0071+000 | Region IV-A | Cavite 2nd DEO | Completed | ₱27.6M | 100% | High risk67 | —-0.069 |
| 17DL0048B. MFO 2 - FLOOD MANAGEMENT SERVICES 1. CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS E. CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURES, TALOLONG RIVER, LOPEZ, QUEZON 4TH LD | Region IV-A | Quezon 4th DEO | Completed | ₱18.8M | 100% | High risk67 | —-0.057 |
| 17DL0078B. MFO2-FLOOD MANAGEMENT SERVICES 1. CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS A. CONSTRUCTION OF FRENZA RIVER PROTECTION (RIPRAPPING OF RIVERBANK), GUINAYANGAN, QUEZON 4TH LD | Region IV-A | Quezon 4th DEO | Completed | ₱14.9M | 100% | High risk67 | —-0.058 |
| 17DL0051B. MFO 2 - FLOOD MANAGEMENT SERVICES 1. CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS G. REHABILITATION OF RIVERBANK PROTECTION AT BRGY. VILLA VICTORIA, ALABAT, QUEZON 4TH LD | Region IV-A | Quezon 4th DEO | Completed | ₱18.8M | 100% | High risk67 | —-0.058 |
| 18HJ0051ORGANIZATIONAL OUTCOME 2: PROJECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL ALONG HIBOLANGAN RIVER (DOWNSTREAM) | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱27.9M | 100% | High risk66 | —-0.043 |
| 17HJ0008CONSTRUCTION OF POBLACION FLOOD CONTROL ALONG DUMAGUETE NORTH ROAD, BINDOY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱13.9M | 100% | High risk66 | —-0.044 |
| 23F00013OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-TAGKAWAYAN-LABO DIVERSION ROAD, LABO SECTION, CAMARINES NORTE, LABO, CAMARINES NORTE 1ST LEGISLATIVE DISTRICT | Region V | Region V | On-Going | ₱110M | 62% | High risk65 | —-0.041 |
| 17HJ0015CONSTRUCTION OF CABUGAN FLOOD CONTROL ALONG DUMAGUETE NORTH ROAD, BINDOY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱9.3M | 100% | High risk65 | —-0.043 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25EF0095CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BRGY. CALATEGAS, NARRA, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱9.9M | 85% | High risk94 | Flagged0.033 |
| 24A00648REHABILITATION/REPAIR/RETROFITTING OF BUILDINGS - MARIANO MARCOS STATE UNIVERSITY | Region I | Region I | On-Going | ₱32.6M | 25% | Medium risk52 | Flagged0.029 |
| 24AB0103CONSTRUCTION OF 4STY12CL & 4STY8CL SOLSONA NATIONAL HIGH SCHOOL, SOLSONA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱61.1M | 54% | Medium risk58 | Flagged0.025 |
| 17E00087WIDENING OF PUERTO PRINCESA SOUTH ROAD (PPSR) FROM TWO (2) LANES TO SIX (6) LANES INCLUDING DRAINAGE STRUCTURES AND OTHER ANCILLARY WORKS, KO191+000 TO KO192+803; KO193+000 TO KO195+175, PALAWAN | Region IV-B | Region IV-B | Completed | ₱154.6M | 100% | Medium risk52 | Flagged0.020 |
| 17E00089WIDENING OF PUERTO PRINCESA SOUTH ROAD (PPSR) FROM TWO (2) LANES TO SIX (6) LANES INCLUDING DRAINAGE STRUCTURES AND OTHER ANCILLARY WORKS, KO202+370.00 TO KO205+400.00; KO205+548.00 TO KO206+835.00, PALAWAN | Region IV-B | Region IV-B | Completed | ₱169.2M | 100% | Medium risk51 | Flagged0.020 |
| 25A00267CONSTRUCTION OF MISSING LINKS/ NEW ROADS, SAN MANUEL (PANGASINAN) - ITOGON (BENGUET) ROAD, PANGASINAN (PACKAGE 6) | Region I | Region I | On-Going | ₱83.8M | 42% | High risk94 | Flagged0.018 |
| 24A00578COMPLETION/EQUIPPING OF SUPER HEALTH CENTERS - ESMERALDA, BALUNGAO SUPER HEALTH CENTER, PANGASINAN | Region I | Region I | On-Going | ₱6M | 39% | Medium risk48 | Flagged0.014 |
| 24A00571COMPLETION/EQUIPPING OF SUPER HEALTH CENTERS - ASINGAN SUPER HEALTH CENTER, PANGASINAN | Region I | Region I | On-Going | ₱5.9M | 55% | Medium risk48 | Flagged0.013 |
| 24A00581COMPLETION/EQUIPPING OF SUPER HEALTH CENTERS - LAWAK, TAYUG SUPER HEALTH CENTER, PANGASINAN | Region I | Region I | On-Going | ₱5.9M | 53% | Medium risk47 | Flagged0.012 |
| 24A00582COMPLETION/EQUIPPING OF SUPER HEALTH CENTERS - SAN VICENTE, UMINGAN SUPER HEALTH CENTER, PANGASINAN | Region I | Region I | On-Going | ₱5.9M | 51% | Medium risk48 | Flagged0.011 |
| 25A00548CONVERGENCE AND SPECIAL SUPPORT PROGRAM - RAINWATER COLLECTOR SYSTEM | Region I | Region I | On-Going | ₱9M | 43% | High risk73 | Flagged0.011 |
| 17EB0086CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS- NEW CONSTRUCTION OF PERMANENT BRIDGES - IRIRON BR. ALONG JCT. MWCR LABANGAN-MURTHA-JCT IRIRON RD (PHASE II) | Region IV-B | Mindoro Occidental DEO | Completed | ₱92.6M | 100% | High risk76 | Flagged0.010 |
| 17E00041ROAD UPGRADING (UNPAVED TO PAVED) OF QUEZON-PUNTA BAJA ROAD K0178+811-K0181+1003; K0182+123-K0182+984; K0188+235-K0189+429, QUEZON, PALAWAN | Region IV-B | Region IV-B | Completed | ₱143.4M | 100% | Medium risk56 | Flagged0.008 |
| 17CD0377CONCRETING OF FMR FROM KALAWAKAN PROPER TO PINTONG DUHAT, BRGY. KALAWAKAN, DOÑA REMEDIOS TRINIDAD, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱28.7M | 100% | High risk79 | Flagged0.008 |
| 17E00092WIDENING OF PUERTO PRINCESA SOUTH ROAD FROM 2 LANES TO 6 LANES INCLUDING DRAINAGE STRUCTURES AND OTHER ANCILLARY WORKS K0223+250 - K0225+988, PALAWAN | Region IV-B | Region IV-B | Completed | ₱133.7M | 100% | Medium risk50 | Flagged0.006 |
| 17E00083WIDENING OF PPSR FROM TWO (2) LANES TO SIX (6) LANES INCLUDING DRAINAGE STRUCTURES AND OTHER ANCILLARY WORKS K0094+606-K0096+508; K0096+534-;0097+328, PALAWAN | Region IV-B | Region IV-B | Completed | ₱137.8M | 100% | Medium risk60 | Flagged0.005 |
| 24EB0029WIDENING OF PERMANENT BRIDGE - SUGSUGIN BR. (B00112MR) ALONG MINDORO WEST COASTAL RD | Region IV-B | Mindoro Occidental DEO | On-Going | ₱64.3M | 21% | Medium risk50 | Flagged0.005 |
| 16EF0127CONST. OF 2-UNITS (1STY5CL) BUGSUK NHS MANGSEE ANNEX, BALABAC, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱9.3M | 100% | Medium risk33 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 226 | 21M00126CONSTRUCTION OF ROAD BRGY. CAMPO DAMALUSAY, STA. 0+000.00 - STA 0+760.00, PAGLAT, MAGUINDANAO | Region XII | Region XII | Completed | ₱11M | 100% | Low risk26 | —-0.083 |
| 227 | 18A00106CONSTRUCTION/REHABILITATION OF WATER SUPPLY, SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS-RAIN WATER COLLECTOR SYSTEM, CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS) IN REGION I | Region I | Region I | Completed | ₱3.3M | 100% | Low risk23 | —-0.047 |
| 228 | 18EB0101NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT-TERTIARY ROADS, JCT MWCR-SAN JOSE AIRPORT-JCT BUBOG RD - K0238+(-100) - K0238+146 (S00148MR), SAN JOSE, OCC. MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱4.4M | 100% | Low risk23 | —-0.075 |
| 229 | 18EG0064RETROFITTING/STRENGTHENING OF TAGBARUNGIS BR. (B00182PW) ALONG PUERTO PRINCESA SOUTH ROAD, PUERTO PRINCESA CITY, PALAWAN | Region IV-B | Palawan 3rd DEO | Completed | ₱3.3M | 100% | Low risk22 | —-0.036 |
| 230 | 17KK0198CONSTRUCTION OF 2STY 8CL, UMAGOS ES, LAGONGLONG, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱17.9M | 100% | Low risk21 | —-0.024 |
| 231 | 17EA0072REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, BANUYO BRIDGE (B00018MQ) ALONG MARINDUQUE CIRCUMFE | Region IV-B | Marinduque DEO | Completed | ₱1.1M | 100% | Low risk20 | —-0.028 |
| 232 | 17EA0062REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, IHATUB BRIDGE (B00029MQ) ALONG MARINDUQUE CIRCUMFE | Region IV-B | Marinduque DEO | Completed | ₱1.6M | 100% | Low risk20 | —-0.027 |
| 233 | 17EA0073REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, BACONG-BACONG BRIDGE (B00020MQ) ALONG MARINDUQUE C | Region IV-B | Marinduque DEO | Completed | ₱1.3M | 100% | Low risk20 | —-0.028 |
| 234 | 17EA0041REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, BUANGAN BRIDGE (B00009MQ) ALONG MARINDUQUE CIRCUMF | Region IV-B | Marinduque DEO | Completed | ₱995.1K | 100% | Low risk20 | —-0.028 |
| 235 | 17EA0074REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, ANTIPOLO BRIDGE (B00017MQ) ALONG MARINDUQUE CIRCUM | Region IV-B | Marinduque DEO | Completed | ₱1.4M | 100% | Low risk20 | —-0.028 |
| 236 | 17KK0148CONSTRUCTION OF 2STY 4CL, KALIPAY NHS, GINGOOG CITY, MIS. OR. | Region X | Misamis Oriental 1st DEO | Completed | ₱9.7M | 100% | Low risk19 | —-0.025 |
| 237 | 17KK0041CONST. OF MPB, BAUK-BAUK, BALINGOAN, MIS. OR. | Region X | Misamis Oriental 1st DEO | Completed | ₱3.8M | 100% | Low risk19 | —-0.073 |
| 238 | 18EF0034CONST. OF MULTI-PURPOSE BUILDING (CLOSED MPB), BRGY. SOWANGAN, QUEZON, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱1.5M | 100% | Low risk11 | —-0.060 |
| 239 | 18KK0012CONSTRUCTION OF MPB, BRGY. TAMA, MAGSAYSAY, MIS. OR. | Region X | Misamis Oriental 1st DEO | Completed | ₱2.8M | 100% | Low risk11 | —-0.094 |
| 240 | 18KK0018CONST. OF MPB, BRGY. MABINI, BINUANGAN, MIS. OR. | Region X | Misamis Oriental 1st DEO | Completed | ₱2.3M | 100% | Low risk11 | —-0.096 |
| 241 | 21EF0017CONST. OF MULTI-PURPOSE BUILDING (BRGY. HALL), BRGY. ANTIPULUAN, NARRA, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱1.9M | 100% | Low risk11 | —-0.062 |
| 242 | 18EF0026CONST. OF TAGUSAO ELEM. SCHOOL, BRGY. TAGUSAO, QUEZON, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱984.9K | 100% | Low risk10 | —-0.060 |
| 243 | 21EF0004CONSTRUCTION OF ONE-CLASSROOM SCHOOL BUILDING BATO-BATO ELEMENTARY SCHOOL, BRGY. BATO-BATO, NARRA, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱1.4M | 100% | Low risk10 | —-0.062 |
| 244 | 18EF0018CONSTRUCTION OF ONE (1) CLASSROOM BUILDING IN SO. GOTOK ELEMENTARY SCHOOL, BRGY. SANDOVAL, BATARAZA | Region IV-B | Palawan 2nd DEO | Completed | ₱984.6K | 100% | Low risk10 | —-0.059 |
| 245 | 18EF0017CONSTRUCTION OF ONE (1) CLASSROOM BUILDING IN MARANGAS WEST ELEMENTARY SCHOOL, MARANGAS BATARAZA | Region IV-B | Palawan 2nd DEO | Completed | ₱984.6K | 100% | Low risk10 | —-0.058 |
| 246 | 18EF0012CONST. OF MALIS ELEM. SCHOOL, BRGY. MALIS, BROOKE'S POINT, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱988K | 100% | Low risk10 | —-0.059 |
| 247 | 18EF0009CONST. OF LABOG ELEM. SCHOOL, BRGY. LABOG, SOFRONIO ESPAÑOLA, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱979.6K | 100% | Low risk10 | —-0.062 |
| 248 | 18EF0016CONSTRUCTION OF ONE (1) CLASSROOM BUILDING IN LAMANE ELEMENTARY SCHOOL, ARAMAYWAN, QUEZON | Region IV-B | Palawan 2nd DEO | Completed | ₱984.6K | 100% | Low risk9 | —-0.063 |
| 249 | 18EF0032CONST. OF MULTI-PURPOSE BUILDING, BRGY. CLASAGUEN, BROOKE'S POINT, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱988.2K | 100% | Low risk9 | —-0.061 |
| 250 | 17KK0232COMPLETION OF SCHOOL BUILDING, 2STY 6CL, CALUBO IS, KINOGUITAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱263.6K | 100% | Low risk4 | —-0.021 |