Contractor dossier
86 projects on file, including joint ventures this contractor is part of.
Total projects
86
Total budget
₱4.4B
Average progress
99.2%
Completion rate
90.7%
Average risk score
53.8
Medium risk on average, out of 100
Flagged as unusual
2
2.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 86 | ₱4.4B | 53.8 | 2 | 99.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 55 | ₱2.4B | 51.9 | 0 | 99.9% |
| Flood Control and Drainage | 19 | ₱1.4B | 55.5 | 0 | 97.1% |
| OTHER | 4 | ₱326.4M | 80.2 | 2 | 100.0% |
| Buildings and Facilities | 4 | ₱187.9M | 46.4 | 0 | 100.0% |
| Bridges | 3 | ₱128.9M | 51.2 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱19M | 56.2 | 0 | 87.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24PB0002002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF KARAGAWAN RIVER FLOOD CONTROL, STA. 81+404 - STA. 82+456 (L/S), KARAGAWAN, K | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱93.6M | 100% | High risk84 | Flagged0.016 |
| 24PB0011ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF APAYAO RIVER FLOOD CONTROL | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱93.6M | 100% | High risk83 | Flagged0.016 |
| 21PC0060CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES SAN SEBASTIAN - SAN JOSE - SAN FRANCISCO ROAD IN SUPPORT OF HANDICRAFT, FURNITURE, PROCESSED HIGH VALUE CROPS, VEGETABLE RICE AND CORN INDUSTRIES, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱47.7M | 100% | High risk79 | —-0.015 |
| 19PF0028CONSTRUCTION OF MISSING LINKS/NEW ROADS, BAGUIO-LA TRINIDAD-ITOGON-SABLAN-TUBA-TUBLAY (BLISTT), LABEY-LACAMEN PROVINCIAL ROAD | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱91.5M | 100% | High risk75 | —-0.016 |
| 24PC0006OO2:PROTECT LIVES AND PROP AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE,BAGUTONG SEC,STA. 30+315-STA.30+831 (R/S) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱134.4M | 100% | High risk67 | —-0.008 |
| 24PC0005OO2:PROTECT LIVES AND PROP AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE, BAGUTONG SEC,STA.29+205-STA.29+760(R/S) | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱142.9M | 100% | High risk67 | —-0.037 |
| 24PC0013OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG- CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCT, SAN MARIANO SECTION, STA.23+808-STA.24+384(R/S) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱143.9M | 98% | High risk66 | —-0.002 |
| 24PC0015OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/ REHAB OF FLOOD MITIGATION FACI W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE,BAROCBOC-SAN MARIANO SEC,STA.22+002-STA.22+578(R/S) | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱143.9M | 100% | High risk65 | —-0.037 |
| 24P00037CONSTRUCTION OF DALIMUNO, BANTAY FLOOD CONTROL ALONG CHICO RIVER (STA. 100+023 - STA. 100+430), BANTAY, TABUK CITY, KALINGA | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱96.5M | 47% | High risk63 | —-0.012 |
| 23PC0029OO 2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS./REHAB./ OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS. OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUC,CAPANNIKIAN SEC,STA 34+440-STA 34+995 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.051 |
| 23PC0032OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG.-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUC,SAN SEBASTIAN SEC,STA 28+085-STA 28+635 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.051 |
| 21P00023LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/ FACILITIES - CONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDING (BENGUET SPORTS COMPLEX AND FACILITIES) AT BARANGAY WANGAL, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱163.4M | 100% | High risk61 | —-0.051 |
| 24PC0019ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - AYAGA-STA. MARCELA-FLORA-LASAM RD - K0679 + 000 - K0680 + 500 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱94.5M | 96% | High risk60 | —-0.034 |
| 23PC0038CSSP-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL SRUCTURE ALONG APAYAO RIVER BASIN, TANGLAGAN SECTION, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.050 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24PB0002002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF KARAGAWAN RIVER FLOOD CONTROL, STA. 81+404 - STA. 82+456 (L/S), KARAGAWAN, K | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱93.6M | 100% | High risk84 | Flagged0.016 |
| 24PB0011ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF APAYAO RIVER FLOOD CONTROL | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱93.6M | 100% | High risk83 | Flagged0.016 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 24PB0002002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF KARAGAWAN RIVER FLOOD CONTROL, STA. 81+404 - STA. 82+456 (L/S), KARAGAWAN, K | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱93.6M | 100% | High risk84 | Flagged0.016 |
| 2 | 24PB0011ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF APAYAO RIVER FLOOD CONTROL | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱93.6M | 100% | High risk83 | Flagged0.016 |
| 3 | 21PC0060CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES SAN SEBASTIAN - SAN JOSE - SAN FRANCISCO ROAD IN SUPPORT OF HANDICRAFT, FURNITURE, PROCESSED HIGH VALUE CROPS, VEGETABLE RICE AND CORN INDUSTRIES, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱47.7M | 100% | High risk79 | —-0.015 |
| 4 | 19PF0028CONSTRUCTION OF MISSING LINKS/NEW ROADS, BAGUIO-LA TRINIDAD-ITOGON-SABLAN-TUBA-TUBLAY (BLISTT), LABEY-LACAMEN PROVINCIAL ROAD | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱91.5M | 100% | High risk75 | —-0.016 |
| 5 | 24PC0006OO2:PROTECT LIVES AND PROP AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE,BAGUTONG SEC,STA. 30+315-STA.30+831 (R/S) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱134.4M | 100% | High risk67 | —-0.008 |
| 6 | 24PC0005OO2:PROTECT LIVES AND PROP AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE, BAGUTONG SEC,STA.29+205-STA.29+760(R/S) | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱142.9M | 100% | High risk67 | —-0.037 |
| 7 | 24PC0013OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG- CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCT, SAN MARIANO SECTION, STA.23+808-STA.24+384(R/S) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱143.9M | 98% | High risk66 | —-0.002 |
| 8 | 24PC0015OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/ REHAB OF FLOOD MITIGATION FACI W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE,BAROCBOC-SAN MARIANO SEC,STA.22+002-STA.22+578(R/S) | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱143.9M | 100% | High risk65 | —-0.037 |
| 9 | 24P00037CONSTRUCTION OF DALIMUNO, BANTAY FLOOD CONTROL ALONG CHICO RIVER (STA. 100+023 - STA. 100+430), BANTAY, TABUK CITY, KALINGA | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱96.5M | 47% | High risk63 | —-0.012 |
| 10 | 23PC0029OO 2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS./REHAB./ OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS. OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUC,CAPANNIKIAN SEC,STA 34+440-STA 34+995 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.051 |
| 11 | 23PC0032OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG.-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUC,SAN SEBASTIAN SEC,STA 28+085-STA 28+635 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.051 |
| 12 | 21P00023LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/ FACILITIES - CONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDING (BENGUET SPORTS COMPLEX AND FACILITIES) AT BARANGAY WANGAL, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱163.4M | 100% | High risk61 | —-0.051 |
| 13 | 24PC0019ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - AYAGA-STA. MARCELA-FLORA-LASAM RD - K0679 + 000 - K0680 + 500 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱94.5M | 96% | High risk60 | —-0.034 |
| 14 | 23PC0038CSSP-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL SRUCTURE ALONG APAYAO RIVER BASIN, TANGLAGAN SECTION, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.050 |
| 15 | 23PC0046CSSP-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER BASIN, NAMALTUGAN SECTION, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.051 |
| 16 | 19PB0010NETWORK DEVELOPMENT- PAVING OF UNPAVED ROADS- TERTIARY ROADS APAYAO-ILOCOS NORTE RD | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱93.6M | 100% | Medium risk59 | —-0.067 |
| 17 | 23PC0037CSSP-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER BASIN, CADACLAN SECTION, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱93.4M | 100% | Medium risk59 | —-0.050 |
| 18 | 21P00045ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS / NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, LABEY - LACAMEN PROVINCIAL ROAD (SECTION 4B OF BLI | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱193M | 100% | Medium risk58 | —-0.052 |
| 19 | 21P00010ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS / NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, LABEY - LACAMEN PROVINCIAL ROAD (SECTION 4A OF BLIS | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.8M | 100% | Medium risk58 | —-0.060 |
| 20 | 19PF0012ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE- SECONDARY ROADS- GUREL-BOKOD-KABAYAN-BUGUIAS-ABATAN ROAD, K0353+320-K035 | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱95.5M | 100% | Medium risk57 | —-0.077 |
| 21 | 20PB0027NETWORK DEVELOPMENT-PAVING OF UNPAVED ROADS- TERTIARY ROADS APAYAO-ILOCOS NORTE RD K0636+831 - K0638+831 | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.064 |
| 22 | 24PC0007CSSP-CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - ANNINIPAN - PANTAY PANTAY ROAD IN SUPPORT OF RICE, CORN AND BANANA INDUS | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱47.5M | 100% | Medium risk57 | —-0.042 |
| 23 | 23PC0028ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES - TERTIARY ROADS - APAYAO-ILOCOS NORTE ROAD- K0651+666 - K0651+699 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱48M | 100% | Medium risk56 | —-0.077 |
| 24 | 24PC0069CSSP-CONS/IMPROVEMENT OF ACCESS RDS LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES(RDS LEVERAGING LINKAGES FOR INDUSTRY & TRADE INFRA PROG-ROLL-IT)-SAN SEBASTIAN-SAN JOSE-SAN FRANCISCO RD IN SUPPORT OF HANDICRAFT,FURNITURE,PROCESSED HIGH VALUE CROPS,VEGET | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱19M | 88% | Medium risk56 | —-0.026 |
| 25 | 21PC0014CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADE, INDUSTRIES AND ECONOMIC ZONES STA. MARIA-MALLIG ROAD IN SUPPORT OF FURNITURE, HANDICRAFTS, BANANA, RICE, CORN AND TOURISM INDUSTRIES | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.4M | 100% | Medium risk56 | —-0.070 |