Contractor dossier
86 projects on file, including joint ventures this contractor is part of.
Total projects
86
Total budget
₱4.4B
Average progress
99.2%
Completion rate
90.7%
Average risk score
53.8
Medium risk on average, out of 100
Flagged as unusual
2
2.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 86 | ₱4.4B | 53.8 | 2 | 99.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 55 | ₱2.4B | 51.9 | 0 | 99.9% |
| Flood Control and Drainage | 19 | ₱1.4B | 55.5 | 0 | 97.1% |
| OTHER | 4 | ₱326.4M | 80.2 | 2 | 100.0% |
| Buildings and Facilities | 4 | ₱187.9M | 46.4 | 0 | 100.0% |
| Bridges | 3 | ₱128.9M | 51.2 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱19M | 56.2 | 0 | 87.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24PB0002002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF KARAGAWAN RIVER FLOOD CONTROL, STA. 81+404 - STA. 82+456 (L/S), KARAGAWAN, K | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱93.6M | 100% | High risk84 | Flagged0.016 |
| 24PB0011ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF APAYAO RIVER FLOOD CONTROL | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱93.6M | 100% | High risk83 | Flagged0.016 |
| 21PC0060CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES SAN SEBASTIAN - SAN JOSE - SAN FRANCISCO ROAD IN SUPPORT OF HANDICRAFT, FURNITURE, PROCESSED HIGH VALUE CROPS, VEGETABLE RICE AND CORN INDUSTRIES, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱47.7M | 100% | High risk79 | —-0.015 |
| 19PF0028CONSTRUCTION OF MISSING LINKS/NEW ROADS, BAGUIO-LA TRINIDAD-ITOGON-SABLAN-TUBA-TUBLAY (BLISTT), LABEY-LACAMEN PROVINCIAL ROAD | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱91.5M | 100% | High risk75 | —-0.016 |
| 24PC0006OO2:PROTECT LIVES AND PROP AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE,BAGUTONG SEC,STA. 30+315-STA.30+831 (R/S) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱134.4M | 100% | High risk67 | —-0.008 |
| 24PC0005OO2:PROTECT LIVES AND PROP AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE, BAGUTONG SEC,STA.29+205-STA.29+760(R/S) | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱142.9M | 100% | High risk67 | —-0.037 |
| 24PC0013OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG- CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCT, SAN MARIANO SECTION, STA.23+808-STA.24+384(R/S) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱143.9M | 98% | High risk66 | —-0.002 |
| 24PC0015OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/ REHAB OF FLOOD MITIGATION FACI W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE,BAROCBOC-SAN MARIANO SEC,STA.22+002-STA.22+578(R/S) | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱143.9M | 100% | High risk65 | —-0.037 |
| 24P00037CONSTRUCTION OF DALIMUNO, BANTAY FLOOD CONTROL ALONG CHICO RIVER (STA. 100+023 - STA. 100+430), BANTAY, TABUK CITY, KALINGA | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱96.5M | 47% | High risk63 | —-0.012 |
| 23PC0029OO 2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS./REHAB./ OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS. OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUC,CAPANNIKIAN SEC,STA 34+440-STA 34+995 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.051 |
| 23PC0032OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG.-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUC,SAN SEBASTIAN SEC,STA 28+085-STA 28+635 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.051 |
| 21P00023LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/ FACILITIES - CONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDING (BENGUET SPORTS COMPLEX AND FACILITIES) AT BARANGAY WANGAL, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱163.4M | 100% | High risk61 | —-0.051 |
| 24PC0019ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - AYAGA-STA. MARCELA-FLORA-LASAM RD - K0679 + 000 - K0680 + 500 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱94.5M | 96% | High risk60 | —-0.034 |
| 23PC0038CSSP-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL SRUCTURE ALONG APAYAO RIVER BASIN, TANGLAGAN SECTION, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.050 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24PB0002002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF KARAGAWAN RIVER FLOOD CONTROL, STA. 81+404 - STA. 82+456 (L/S), KARAGAWAN, K | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱93.6M | 100% | High risk84 | Flagged0.016 |
| 24PB0011ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF APAYAO RIVER FLOOD CONTROL | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱93.6M | 100% | High risk83 | Flagged0.016 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 21PC0049CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION-KABANGWELAN ROAD LEADING TO VILLAMOR FALLS, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.8M | 100% | Medium risk52 | —-0.076 |
| 52 | 22PB0011NETWORK DEVELOPMENT PROGRAM - PAVING OF UNPAVED ROADS - TERTIARY ROAD, APAYAO-ILOCOS NORTE RD K0635+714+1000 | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱20.7M | 100% | Medium risk51 | —-0.080 |
| 53 | 23PC0036ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS,SLOPE COLLAPSE, AND LANDSLIDES-TERTIARY ROADS-CLAVERIA-CALANASAN-KABUGAO ROAD- K0677+904 - K0677+982 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱44.1M | 100% | Medium risk51 | —-0.075 |
| 54 | 22PC0060ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES-TERTIARY ROADS-CLAVERIA-CALANASAN-KABUGAO ROAD - K0632+194-K0632+310 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱90.6M | 100% | Medium risk51 | —-0.063 |
| 55 | 22PC0059ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES-TERTIARY ROADS-CLAVERIA-CALANASAN-KABUGAO ROAD-K0632+007-K0632+194 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱91.4M | 100% | Medium risk51 | —-0.067 |
| 56 | 21PB0003NETWORK DEVELOPMENT- PAVING OF UNPAVED ROADS-TERTIARY ROADS, APAYAO-ILOCOS NORTE RD(S00622LZ), K0635+406 - K0635+714 | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱12.1M | 100% | Medium risk51 | —-0.079 |
| 57 | 19PF0020ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE- CONSTRUCTION OF TUBLAY CENTRAL FLOOD CONTROL | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱57.9M | 100% | Medium risk51 | —-0.064 |
| 58 | 22PB0003NETWORK DEVELOPMENT PROGRAM - PAVING OF UNPAVED ROADS - TERTIARY ROADS, APAYAO-ILOCOS NORTE RD K0631 + 851 - K0632 + 063 | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱8.9M | 100% | Medium risk51 | —-0.079 |
| 59 | 22PC0001ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES-TERTIARY ROADS CLAVERIA-CALANASAN-KABUGAO ROAD - K0666+475-K0666+606 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱86M | 100% | Medium risk51 | —-0.069 |
| 60 | 22PB0032NETWORK DEVELOPMENT PROGRAM-OFF CARRIAGEWAY IMPROVEMENT-TERTIARY ROADS,APAYAO-ILOCOS NORTE ROAD-K061 | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱12.5M | 100% | Medium risk51 | —-0.078 |
| 61 | 23PC0006ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES - TERTIARY ROADS-CLAVERIA-CALANASAN-KABUGAO ROAD - K0686+000 - K0686+082 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱44.1M | 100% | Medium risk50 | —-0.076 |
| 62 | 23PC0048ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES-TERTIARY ROADS-CLAVERIA-CALANASAN-KABUGAO RD-K0662+667-K0662+742 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱82.1M | 100% | Medium risk50 | —-0.072 |
| 63 | 23PB0002FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF BADDUAT RIVER FLOOD CONTROL ALONG APAYAO-ABULUG RIVER BASIN, STA. 83+292 - STA.83+532, KABUGAO, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.064 |
| 64 | 22PC0055(CSSP)-CONST./IMPR. OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROLL-IT) - SAN SEBASTIAN-SAN JOSE-SAN FRANCISCO ROAD IN SUPPORT OF HANDICRAFT, FURNITURE, PROCESSED HIGH VALUE CROPS, VEGETABLE RICE AND CORN INDUSTRIES, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱24.2M | 100% | Medium risk50 | —-0.034 |
| 65 | 22PC0036ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES-SALAGUNTING BR. 1 (B01049LZ) ALONG CLAVERIA-CALANASAN-KABUGAO RD. | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱48.4M | 100% | Medium risk50 | —-0.038 |
| 66 | 22PB0018FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF APAYAO RIVER FLOOD CONTROL STRUCTURES, STA. 82+292-STA.82+592, BRGY. NAGBABALAYAN, KABUGAO, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱23.9M | 100% | Medium risk49 | —-0.065 |
| 67 | 23PC0022ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES-TERTIARY ROADS-CLAVERIA-CALANASAN-KABUGAO ROAD - K0643+829 - K0643+867 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱48M | 100% | Medium risk49 | —-0.075 |
| 68 | 21PC0032ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPES COLLAPSE AND LANDSLIDES-TERTIARY ROADS CLAVERIA-CALANASAN-KABUGAO ROAD K0634+640-K0634+892 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱49M | 100% | Medium risk48 | —-0.065 |
| 69 | 19PE0088CONSTRUCTION (COMPLETION) OF 3-STOREY BUILDING OF REGIONAL INTERNAL AFFAIRS HEADQUARTERS, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱16.7M | 100% | Medium risk48 | —-0.079 |
| 70 | 21PC0035LOCAL ROADS AND BRIDGES-LOCAL ROADS-LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION/IMPROVEMENT OF SINIGPIT BARANGAY ROAD, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱5M | 100% | Medium risk47 | —-0.075 |
| 71 | 21PI0100RESTORATION/CONSN OF SLOPE PROTECTION WORKS AND UPGRADING OF PERIMETER RD IN BRY POBLACION, BAUKO, MOUNTAIN PROVINCE WHICH WAS DAMAGED BY TYPHOONS QUINTA, ROLLY AND ULYSSES IN 2020 | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱38.6M | 100% | Medium risk47 | —-0.028 |
| 72 | 19PE0021REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE: CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - SPECIFIC LOCATIONS ALONG SHILAN - BECKEL ROAD (S00385LZ), K0262+036 - K0262+890, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱45.3M | 100% | Medium risk45 | —-0.080 |
| 73 | 20PF0014CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS & PRINCIPAL RIVERS: CONSTRUCTION OF PASDONG FLOOD CONTROL | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱8.9M | 100% | Medium risk44 | —-0.069 |
| 74 | 19PF0002CONSTRUCTION OF FLOOD MITIGATION STRUCTURE- CONSTRUCTION OF STO. NINO FLOOD CONTROL, BRGY. AMBASSADOR, TUBLAY, BENGUET | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱17.9M | 100% | Medium risk44 | —-0.068 |
| 75 | 20PE0050CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJORRIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD MITIGATIONSTRUCTURE ALONG AGNO RIVER BASIN, TAAL-BENGAO SECTION, BRGY. AMBUKLAO, BOKOD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱9.7M | 100% | Medium risk44 | —-0.070 |