Contractor dossier
203 projects on file, including joint ventures this contractor is part of.
Total projects
203
Total budget
₱15.3B
Average progress
95.8%
Completion rate
87.2%
Average risk score
57.9
Medium risk on average, out of 100
Flagged as unusual
12
5.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 191 | ₱14.4B | 58.3 | 12 | 95.9% |
| National Capital Region | 6 | ₱352.9M | 53.9 | 0 | 86.9% |
| Region IV-B | 5 | ₱559.8M | 51.7 | 0 | 100.0% |
| Region V | 1 | ₱13.7M | 45.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 127 | ₱9.9B | 56.7 | 0 | 96.9% |
| Flood Control and Drainage | 29 | ₱1.7B | 53.6 | 0 | 100.0% |
| Bridges | 29 | ₱1.6B | 53.0 | 1 | 96.5% |
| GAA 2025 SSP | 10 | ₱1.3B | 95.7 | 10 | 84.0% |
| OTHER | 3 | ₱539.2M | 74.5 | 1 | 66.7% |
| Bridges, Roads | 2 | ₱241.6M | 70.6 | 0 | 100.0% |
| Buildings and Facilities | 2 | ₱14.9M | 46.8 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱9.8M | 47.4 | 0 | 0.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DE0103CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, IMPROVEMENT OF ROAD, MAHACOT WEST - MAHACOT | Region IV-A | Batangas 2nd DEO | On-Going | ₱144.8M | 84% | High risk96 | Flagged0.015 |
| 25DE0095CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, IMPROVEMENT OF ROAD, DULANGAN-TALON-ABIACAO | Region IV-A | Batangas 2nd DEO | On-Going | ₱144.8M | 87% | High risk96 | Flagged0.015 |
| 25DE0101CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, IMPROVEMENT OF ROAD, ALAGAO-MALINDIG ROAD, | Region IV-A | Batangas 2nd DEO | On-Going | ₱144.8M | 82% | High risk96 | Flagged0.016 |
| 25DE0102CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, IMPROVEMENT OF ROAD, BARANGAY MALINDIG, BAU | Region IV-A | Batangas 2nd DEO | On-Going | ₱144.8M | 83% | High risk96 | Flagged0.016 |
| 25DE0096CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, IMPROVEMENT OF ROAD, MANGGAHAN-SAN MARTIN-S | Region IV-A | Batangas 2nd DEO | On-Going | ₱144.8M | 84% | High risk96 | Flagged0.015 |
| 25DE0099CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, IMPROVEMENT OF ROAD, APLAYA-SANTO DOMINGO-S | Region IV-A | Batangas 2nd DEO | On-Going | ₱144.8M | 81% | High risk96 | Flagged0.018 |
| 25DE0098CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, IMPROVEMENT OF ROAD, BARANGAY I, BAUAN, BAT | Region IV-A | Batangas 2nd DEO | On-Going | ₱144.8M | 82% | High risk96 | Flagged0.016 |
| 25DE0107CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, REHABILITATION OF DUMANTAY - MAHACOT ROAD, | Region IV-A | Batangas 2nd DEO | On-Going | ₱96.5M | 91% | High risk96 | Flagged0.006 |
| 25DE0100CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, IMPROVEMENT OF ROAD, BARANGAY IV, BAUAN, BA | Region IV-A | Batangas 2nd DEO | On-Going | ₱96.5M | 82% | High risk96 | Flagged0.008 |
| 25DE0108CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, REHABILITATION OF ROAD, BARANGAY TINGGA ITA | Region IV-A | Batangas 2nd DEO | On-Going | ₱96.5M | 83% | High risk96 | Flagged0.007 |
| 25DE0191CONCRETING OF BRGY. NAGTALUNTONG FMR (PHASE I), BRGY. NAGTALUNTONG, LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱14.9M | 0% | High risk86 | Flagged0.060 |
| 17D00058MFO-3 MAINT. & CONST. SERVICES OF OTHER INFRA. CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS, & DECLARED TOURISM DESTINATIONS TO DECLARED TOURISM DESTINATIONS LOBO-MALABRIGO-LAIYA-SAN JUAN ROAD, INCL. BRIDGE, LOBO, BATANGAS | Region IV-A | Region IV-A | Completed | ₱96.5M | 100% | High risk74 | —-0.049 |
| 16DE0187MFO-2 FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL STRUCTURE ALONG LOBO RIVERBANKS, POBLACION, LOBO, BATANGAS, 2ND LD | Region IV-A | Batangas 2nd DEO | Completed | ₱77.2M | 100% | High risk73 | —-0.052 |
| 16DE0186MFO-2 FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL STRUCTURE ALONG LOBO RIVERBANKS, TAYUMAN, LOBO, BATANGAS, 2ND LD | Region IV-A | Batangas 2nd DEO | Completed | ₱77.2M | 100% | High risk73 | —-0.052 |
| 20DD0058ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS- TERTIARY ROADS, SN JUAN-LAIYA RD - K0146+433 - K0147+688, K0147+705 - K0148+631 | Region IV-A | Batangas 4th DEO | Completed | ₱81.4M | 100% | High risk72 | —-0.036 |
| 20D00065FY 2020 DPWH INFRA . PROGRAM, LOCAL PROGRAM CONST./REPAIR/REHAB./IMPVT. OF VARIOUS INFRASTRUCTURE INCL. LOCAL PROJECTS NATIONAL ROADS AND BRIDGES NATIONAL ROADS ONSTRUCTION OF CONCRETE ROAD (PACKAGE II) LOBO-MALABRIGO- LAIYA-SAN JUAN ROAD, LOBO, BATANGAS | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk72 | —-0.047 |
| 16DE0185MFO-2 FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL STRUCTURE ALONG CALUMPANG RIVER, BATANGAS CITY, 5TH LD | Region IV-A | Batangas 2nd DEO | Completed | ₱49M | 100% | High risk71 | —-0.059 |
| 17D00009ASSET PRESERVATION OF NATI'L. ROADS PREV. MAINT. BASED ON PAVEMENT MGMT. SYSTEM/HIGHWAY DEV'T. MNGMT.-4 (HDM-4) TERTIARY ROADS BAUAN-MABINI RD. (S01947LZ), BATANGAS | Region IV-A | Region IV-A | Completed | ₱134.9M | 100% | High risk71 | —-0.054 |
| 18D00017FY 2018 DPWH INFRA. PROGRAM: ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NAT'L. ROAD SYSTEM, NETWORK DEV'T. PROGRAM, CONST. OF BY-PASSES & DIVERSION ROADS, STAR TOLLWAY-PINAMUCAN BY-PASS ROAD, PACKAGE B, INCL. BRIDGE, SLOPE PROT. & ROW, BATANGAS | Region IV-A | Region IV-A | Completed | ₱145.1M | 100% | High risk67 | —-0.053 |
| 22D00089CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LOBO RIVER (UPSTREAM), BARANGAY TAYUMAN, LOBO, BATANGAS | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk67 | —-0.059 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DE0191CONCRETING OF BRGY. NAGTALUNTONG FMR (PHASE I), BRGY. NAGTALUNTONG, LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱14.9M | 0% | High risk86 | Flagged0.060 |
| 25DE0099CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, IMPROVEMENT OF ROAD, APLAYA-SANTO DOMINGO-S | Region IV-A | Batangas 2nd DEO | On-Going | ₱144.8M | 81% | High risk96 | Flagged0.018 |
| 25DE0101CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, IMPROVEMENT OF ROAD, ALAGAO-MALINDIG ROAD, | Region IV-A | Batangas 2nd DEO | On-Going | ₱144.8M | 82% | High risk96 | Flagged0.016 |
| 25DE0098CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, IMPROVEMENT OF ROAD, BARANGAY I, BAUAN, BAT | Region IV-A | Batangas 2nd DEO | On-Going | ₱144.8M | 82% | High risk96 | Flagged0.016 |
| 25DE0102CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, IMPROVEMENT OF ROAD, BARANGAY MALINDIG, BAU | Region IV-A | Batangas 2nd DEO | On-Going | ₱144.8M | 83% | High risk96 | Flagged0.016 |
| 25DE0095CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, IMPROVEMENT OF ROAD, DULANGAN-TALON-ABIACAO | Region IV-A | Batangas 2nd DEO | On-Going | ₱144.8M | 87% | High risk96 | Flagged0.015 |
| 25DE0103CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, IMPROVEMENT OF ROAD, MAHACOT WEST - MAHACOT | Region IV-A | Batangas 2nd DEO | On-Going | ₱144.8M | 84% | High risk96 | Flagged0.015 |
| 25DE0096CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, IMPROVEMENT OF ROAD, MANGGAHAN-SAN MARTIN-S | Region IV-A | Batangas 2nd DEO | On-Going | ₱144.8M | 84% | High risk96 | Flagged0.015 |
| 24D00172RETROFITTING OF BRIDGE (PHASE III), BOLBOK FLYOVER, BATANGAS CITY, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱289.5M | 77% | High risk67 | Flagged0.009 |
| 25DE0100CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, IMPROVEMENT OF ROAD, BARANGAY IV, BAUAN, BA | Region IV-A | Batangas 2nd DEO | On-Going | ₱96.5M | 82% | High risk96 | Flagged0.008 |
| 25DE0108CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, REHABILITATION OF ROAD, BARANGAY TINGGA ITA | Region IV-A | Batangas 2nd DEO | On-Going | ₱96.5M | 83% | High risk96 | Flagged0.007 |
| 25DE0107CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, REHABILITATION OF DUMANTAY - MAHACOT ROAD, | Region IV-A | Batangas 2nd DEO | On-Going | ₱96.5M | 91% | High risk96 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 16DE0144CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, REHABILITATION /MAJOR REPAIR OF PERMANENT BRIDGES, BIGA BR. 1 (B03032LZ) ALONG BATANGAS -LOBO ROAD | Region IV-A | Batangas 2nd DEO | Completed | ₱15M | 100% | Medium risk55 | —-0.038 |
| 102 | 20DE0042ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS, LOBO-MALABRIGO-SN JUAN RD - K0163+626 - K0165+099, K0166+474 - K0166+719 | Region IV-A | Batangas 2nd DEO | Completed | ₱88.8M | 100% | Medium risk54 | —-0.097 |
| 103 | 24D00033CONSTRUCTION OF BY-PASS AND DIVERSION ROADS STAR TOLLWAY - PINAMUCAN BYPASS, PACKAGE O, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱86M | 0% | Medium risk54 | —-0.028 |
| 104 | 23D00070CONSTRUCTION OF BATANGAS ACCESS ZONE - WEST SIDE (PHASE 1), BATANGAS CITY, SAN PASCUAL AND BAUAN BATANGAS | Region IV-A | Region IV-A | On-Going | ₱74.3M | 100% | Medium risk54 | —-0.056 |
| 105 | 22D00069FY 2022 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BY-PASS AND DIVERSION ROADS BATANGAS CITY-SAN PASCUAL-BAUAN DIVERSION ROAD, PACKAGE G, BATANGAS | Region IV-A | Region IV-A | Completed | ₱80.5M | 100% | Medium risk54 | —-0.094 |
| 106 | 18DE0156ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE PRIMARY ROADS, MANILA BATANGAS ROAD K0096+159 K0097+420; K0100+340 K0100+600; K0100+616 K0100+965 | Region IV-A | Batangas 2nd DEO | Completed | ₱75.3M | 100% | Medium risk54 | —-0.098 |
| 107 | 18DE0158ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE, SECONDARY ROADS, BATANGAS PORT DIVERSION RD K0102+194 K0104+082 | Region IV-A | Batangas 2nd DEO | Completed | ₱86.8M | 100% | Medium risk54 | —-0.098 |
| 108 | 19DE0067ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT, BATANGAS-LOBO RD, K0111+253 - K0111+852, K0112+852 - K0113+929 | Region IV-A | Batangas 2nd DEO | Completed | ₱74.3M | 100% | Medium risk54 | —-0.101 |
| 109 | 22DE0073ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING - SECONDARY ROADS, LOBO-MALABRIGO-SN JUAN RD - K0160+500 - K0160+740, K0160+874 - K0161+416 | Region IV-A | Batangas 2nd DEO | Completed | ₱56.6M | 100% | Medium risk54 | —-0.102 |
| 110 | 20DE0123LOCAL INFRASTRUCTURE PROGRAM REHAB/ IMPROVEMENT/ASPHALT OVERLAY ALITAGTAG ROAD (SAN PASCUAL SECTION), BRGY. MATAAS NA LUPA, GELERANG KAWAYAN, SAN PASCUAL, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱59.4M | 100% | Medium risk54 | —-0.100 |
| 111 | 18DE0157ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION, PREVENTIVE MAINTENANCE, SECONDARY ROADS, LOBO-MALABRIGO-SN JUAN RD. K0161+835 K0166+106 | Region IV-A | Batangas 2nd DEO | Completed | ₱85.9M | 100% | Medium risk54 | —-0.093 |
| 112 | 22DE0070ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/NEW ROADS, LOBO-MALABRIGO-LAIYA-SAN JUAN ROAD, PACKAGE II, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱72.4M | 100% | Medium risk54 | —-0.099 |
| 113 | 22DE0069ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/NEW ROADS, LOBO-MALABRIGO-LAIYA-SAN JUAN ROAD, PACKAGE III, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱72.4M | 100% | Medium risk54 | —-0.099 |
| 114 | 22DE0068ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/NEW ROADS, LOBO-MALABRIGO-LAIYA-SAN JUAN ROAD, PACKAGE XII, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱77.2M | 100% | Medium risk54 | —-0.100 |
| 115 | 19D00036FY 2019 DPWH INFRASTRUCTURE PROGRAM CONVERGENCE AND SPECIAL SUPPORT PROGRAMCONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONSLOBO - MALABRIGO - LAIYA - SAN JUAN ROAD,PACKAGE II, LOBO, BATANGAS | Region IV-A | Region IV-A | Completed | ₱67.5M | 100% | Medium risk54 | —-0.100 |
| 116 | 16DE0132CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, RETROFITTING / STRENGTHENING OF PAVEMENT BRIDGES, PATAY BR. (B03046LZ) ALONG BATANGAS-QUEZON RD | Region IV-A | Batangas 2nd DEO | Completed | ₱13.6M | 100% | Medium risk54 | —-0.038 |
| 117 | 22DE0110ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, BAUAN-MABINI RD - K0176+050 - K0176+200 | Region IV-A | Batangas 2nd DEO | Completed | ₱56.7M | 100% | Medium risk54 | —-0.102 |
| 118 | 22DE0033ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALON | Region IV-A | Batangas 2nd DEO | Completed | ₱79.1M | 100% | Medium risk53 | —-0.069 |
| 119 | 21DE0039ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BARANGAY FABRICA, LOBO RIVE | Region IV-A | Batangas 2nd DEO | Completed | ₱86.9M | 100% | Medium risk53 | —-0.077 |
| 120 | 22DE0034ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALON | Region IV-A | Batangas 2nd DEO | Completed | ₱78.5M | 100% | Medium risk53 | —-0.078 |
| 121 | 21DE0040ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION/REHABILITATION OF LOBO RIVER FLO | Region IV-A | Batangas 2nd DEO | Completed | ₱57.9M | 100% | Medium risk53 | —-0.085 |
| 122 | 22DE0072ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF BANK PROTECTION/FLOOD CONTROL STRUCTURE ALONG LOBO-MALABR | Region IV-A | Batangas 2nd DEO | Completed | ₱86.9M | 100% | Medium risk53 | —-0.079 |
| 123 | 21E00053CONSTRUCTION OF NAUJAN-POLA BYPASS ROAD-MELGAR B TO MONTELAGO TO MONTEMAYOR, STA. 0+000.00-STA. 2+040.00, NAUJAN, ORIENTAL MINDORO | Region IV-B | Region IV-B | Completed | ₱96.5M | 100% | Medium risk53 | —-0.081 |
| 124 | 19E00011WIDENING OF PUERTO PRINCESA NORTH ROAD (PPNR), KO141+100.00 - KO142+472.00, ROXAS, PALAWAN | Region IV-B | Region IV-B | Completed | ₱101.2M | 100% | Medium risk53 | —-0.063 |
| 125 | 22DE0091CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, POBLACION, SAN LUIS, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱78.4M | 100% | Medium risk52 | —-0.081 |