Contractor dossier
454 projects on file, including joint ventures this contractor is part of.
Total projects
454
Total budget
₱29.7B
Average progress
98.0%
Completion rate
90.1%
Average risk score
50.8
Medium risk on average, out of 100
Flagged as unusual
23
5.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 157 | ₱11.7B | 52.0 | 17 | 97.5% |
| Region IV-A | 126 | ₱6B | 53.6 | 2 | 96.8% |
| Region III | 55 | ₱3.9B | 47.4 | 1 | 98.2% |
| Region XII | 38 | ₱3.2B | 42.0 | 0 | 99.9% |
| Region IV-B | 29 | ₱2.1B | 47.3 | 3 | 100.0% |
| National Capital Region | 24 | ₱1B | 50.0 | 0 | 100.0% |
| Region X | 10 | ₱783.8M | 50.6 | 0 | 100.0% |
| Region IX | 7 | ₱318M | 60.1 | 0 | 100.0% |
| Region VI | 2 | ₱48.9M | 60.1 | 0 | 100.0% |
| Region VII | 2 | ₱159.6M | 52.8 | 0 | 100.0% |
| Region XIII | 2 | ₱292.5M | 48.2 | 0 | 100.0% |
| Region VIII | 1 | ₱57.4M | 52.5 | 0 | 100.0% |
| Region I | 1 | ₱71.2M | 51.4 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 170 | ₱14.8B | 52.0 | 12 | 97.4% |
| Flood Control and Drainage | 107 | ₱6.4B | 50.6 | 1 | 99.1% |
| Buildings and Facilities | 79 | ₱3B | 46.7 | 0 | 96.2% |
| Bridges | 58 | ₱2B | 39.8 | 0 | 100.0% |
| OTHER | 29 | ₱2.2B | 71.8 | 5 | 99.3% |
| Bridges, Roads | 9 | ₱1.2B | 65.3 | 4 | 97.0% |
| GAA 2025 SSP | 1 | ₱96.5M | 95.1 | 1 | 86.9% |
| Water Provision and Storage | 1 | ₱3.2M | 24.6 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CM0017CSSP, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD AT CASTILLEJOS, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱96.5M | 87% | High risk95 | Flagged0.013 |
| 19LH0027ROAD WIDENING ALONG DAVAO-BUKIDNON ROAD, K1632+000 TO K1633+252; K1634+420 TO K1634+960, 3RD CONGRESSIONAL DISTRICT, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱96.5M | 100% | High risk80 | —-0.016 |
| 17L00067WIDENING/RECONST./IMPVT. OF BYPASS RD @ JCT. DAANG MAHARLIKA-LICANAN-BUNAWAN-MAHAYAG-INDANGAN-CABANT | Region XI | Region XI | Completed | ₱142.5M | 100% | High risk80 | Flagged0.018 |
| 25CM0048CSSP, BIP, MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI-PURPOSE BUILDING (MUNICIPAL HALL) PHASE 2 BARANGAY SAN JUAN, CASTILLEJOS, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱97.9M | 51% | High risk80 | —-0.006 |
| 17L00004REHAB./RECONST./WIDENING OF DAANG MAHARLIKA (MN) INCL. SLOPE PROTECTION (BRGY. CANOCOTAN-BRGY. BINCU | Region XI | Region XI | Completed | ₱207.6M | 100% | High risk79 | Flagged0.022 |
| 17L00023REHAB./RECONST./WIDENING OF DAANG MAHARLIKA (MN) INCL. SLOPE PROTECTION (BRGY. BINCUNGAN SECT.) DAVA | Region XI | Region XI | Completed | ₱165.4M | 100% | High risk79 | Flagged0.017 |
| 17L00055CONC./WIDENING/IMPVT. OF BYPASS ROAD @ JCT. DAANG MAHARLIKA RD-MUDIANG-MALAGAMOT-INDANGAN-CABANTIAN- | Region XI | Region XI | Completed | ₱151.1M | 100% | High risk79 | Flagged0.016 |
| 18M00022CONSTRUCTION OF CONCRETE ROAD AND GRAVEL ROAD TUPI-SARANGANI ROAD (NHW JCT. TUPI-JCT LINAN MIASONG ROAD), PACKAGE A, TUPI, SOUTH COTABATO | Region XII | Region XII | Completed | ₱192.9M | 100% | High risk78 | —-0.003 |
| 19D00063PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG CARMONA RIVER, PHASE VII, WEST SIDE, CARMONA, CAVITE | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk77 | Flagged0.015 |
| 17LA0015WIDENING OF HAGUIMITAN BRIDGE (B00063MN) INCLUDING APPROACHES AND RRW, MONKAYO ALONG DAANG MAHARLIKA (MN), COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱73.1M | 100% | High risk77 | —-0.014 |
| 24DO0091ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MORONG BYPASS ROAD, RIZAL | Region IV-A | Rizal 2nd DEO | On-Going | ₱96.5M | 80% | High risk76 | Flagged0.008 |
| 17K00058CONST. OF TANGUB-BONIFACIO BYPASS RD INCL.ROW & BR,MIS.OCC. 2ND LD | Region X | Region X | Completed | ₱87.8M | 100% | High risk76 | —-0.008 |
| 18DD0001ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT, OFF-CARRIAGEWAY IMPROVEMENT, TERTIARY ROADS, SAN JUAN-LAIYA RD - K0150+262 - K0150+723, K0150+739 - K0151+808, K0151+815 - K0152+940, SAN JUAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱96.5M | 100% | High risk74 | —-0.031 |
| 23EB0014REPLACEMENT OF PERMANENT WEAK BRIDGE-ARAANG BUHAY BR. (B00194MR) ALON G MINDORO WEST COASTAL RD | Region IV-B | Mindoro Occidental DEO | Completed | ₱91.7M | 100% | High risk74 | —-0.006 |
| 25CM0018CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD AT SUBIC, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱76.7M | 92% | High risk74 | —-0.032 |
| 17J00048CONSTRUCTION OF FLOOD CONTROL STRUCTURE (POBLACION SIDE) ALONG LAYAWAN RIVER, POLANCO, ZAMBOANGA DEL NORTE, BEG. OF PROJECT: 1 + 047.00, END OF PROJECT: 1 + 571.30, NET LENGTH: 524.30 LN.M. | Region IX | Region IX | Completed | ₱96.5M | 100% | High risk74 | —-0.028 |
| 17LC0003IMPROVEMENT/WIDENING ALONG TAGUM CITY DIVERSION ROAD INCLUDING RROW. K1461+177.411-K1461+640, K1461+640-K1462+690, K1462+690-K1462+705, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱46.3M | 100% | High risk73 | —-0.025 |
| 17LA0037WIDENING OF LINDA BRIDGE (B00077MN) INCLUDING APPROACHES, NABUNTURAN ALONG DAANG MAHARLIKA (MN), COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱42.6M | 100% | High risk73 | —-0.023 |
| 18LC0015WIDENING OF CAMBAOGO BRIDGE (B015870MN) ALONG ASUNCION-SAN ISIDRO-LAAK-VERUELA ROAD INCLUDING ROW, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱16M | 100% | High risk73 | —-0.025 |
| 17LA0044WIDENING OF TAGMANOK BRIDGE (B00079MN) INCLUDING APPROACHES, MAWAB ALONG DAANG MAHARLIKA (MN), COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱36.1M | 100% | High risk73 | —-0.024 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 20L00110ROAD UPGRADING OF NHJ BUSO - SO. PAYPAY - TAGBINONGA - SO. CALATAGAN, CALAPAGAN - SO. MATIGDAO, MARAYAG - SO. CALINAWAN, TAOCANGA ROAD, PACKAGE 2, DAVAO ORIENTAL | Region XI | Region XI | On-Going | ₱172.7M | 96% | High risk69 | Flagged0.026 |
| 17E00090WIDENING OF PUERTO PRINCESA SOUTH ROAD (PPSR) FROM TWO (2) LANES TO SIX (6) LANES INCLUDING DRAINAGE STRUCTURES AND OTHER ANCILLARY WORKS, KO207+040.00 TO KO207+121.00; KO207+167.00 TO KO209+194.00; KO209+648.00 TO KO212+000.00, PALAWAN | Region IV-B | Region IV-B | Completed | ₱189.9M | 100% | Medium risk51 | Flagged0.025 |
| 17E00091WIDENING OF PUERTO PRINCESA SOUTH ROAD FROM 2LANES TO 6 LANES INCLUDING DRAINAGE STRUCTURES AND OTHER ANCILLARY WORKS K0212+000 - K0215+738; K0216+000 - K0216+531, PALAWAN | Region IV-B | Region IV-B | Completed | ₱193.5M | 100% | Medium risk51 | Flagged0.023 |
| 17L00004REHAB./RECONST./WIDENING OF DAANG MAHARLIKA (MN) INCL. SLOPE PROTECTION (BRGY. CANOCOTAN-BRGY. BINCU | Region XI | Region XI | Completed | ₱207.6M | 100% | High risk79 | Flagged0.022 |
| 17L00067WIDENING/RECONST./IMPVT. OF BYPASS RD @ JCT. DAANG MAHARLIKA-LICANAN-BUNAWAN-MAHAYAG-INDANGAN-CABANT | Region XI | Region XI | Completed | ₱142.5M | 100% | High risk80 | Flagged0.018 |
| 17E00088WIDENING OF PUERTO PRINCESA SOUTH ROAD (PPSR) FROM TWO (2) LANES TO SIX (6) LANES INCLUDING DRAINAGE STRUCTURES AND OTHER ANCILLARY WORKS, KO195+290.00 TO KO199+789.00, PALAWAN | Region IV-B | Region IV-B | Completed | ₱169.9M | 100% | Medium risk52 | Flagged0.018 |
| 20L00109ROAD UPGRADING OF NHJ BUSO - SO. PAYPAY - TAGBINONGA - SO. CALATAGAN, CALAPAGAN - SO. MATIGDAO, MARAYAG - SO. CALINAWAN, TAOCANGA ROAD, PACKAGE 1, DAVAO ORIENTAL | Region XI | Region XI | On-Going | ₱140.7M | 87% | High risk69 | Flagged0.018 |
| 17L00023REHAB./RECONST./WIDENING OF DAANG MAHARLIKA (MN) INCL. SLOPE PROTECTION (BRGY. BINCUNGAN SECT.) DAVA | Region XI | Region XI | Completed | ₱165.4M | 100% | High risk79 | Flagged0.017 |
| 20L00032RECONSTRUCTION TO CONCRETE PAVEMENT - JCT. R MAGSAYSAY AVE. - L. MA. GUERRERO ST. - GUZMAN ST. - VINZON ST. - T. PALMA GIL ST. - JCT. DACUDAO - JCT. J.P. CABAGUIO AVE., DAVAO CITY | Region XI | Region XI | On-Going | ₱214.5M | 91% | High risk66 | Flagged0.017 |
| 18L00142IMPVT./CONC. OF JCT. DAVAO-BUKIDNON ROAD (CALINAN SECT.)-WANGAN-SUBASTA-TAGAKPAN-TUNGKALAN-TAGURANO- | Region XI | Region XI | On-Going | ₱164.6M | 95% | High risk69 | Flagged0.016 |
| 17L00055CONC./WIDENING/IMPVT. OF BYPASS ROAD @ JCT. DAANG MAHARLIKA RD-MUDIANG-MALAGAMOT-INDANGAN-CABANTIAN- | Region XI | Region XI | Completed | ₱151.1M | 100% | High risk79 | Flagged0.016 |
| 18L00065WIDENING (2 INTO 4 LANES) OF BYPASS RD AT JCT. DAANG MAHARLIKA-LICANAN-BUNAWAN-MAHAYAG-INDANGAN-CABA | Region XI | Region XI | On-Going | ₱222.1M | 99% | High risk66 | Flagged0.015 |
| 19D00063PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG CARMONA RIVER, PHASE VII, WEST SIDE, CARMONA, CAVITE | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk77 | Flagged0.015 |
| 25CM0017CSSP, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD AT CASTILLEJOS, ZAMBALES | Region III | Zambales 2nd DEO | On-Going | ₱96.5M | 87% | High risk95 | Flagged0.013 |
| 20L00091CONSTRUCTION OF CONCRETE BRIDGE - TALAGUTONG - BALUNTAYA - TICULON - LITTLE BAGUIO DIVERSION ROAD, PACKAGE C, DAVAO OCCIDENTAL | Region XI | Region XI | On-Going | ₱143.7M | 95% | High risk66 | Flagged0.012 |
| 24DO0091ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MORONG BYPASS ROAD, RIZAL | Region IV-A | Rizal 2nd DEO | On-Going | ₱96.5M | 80% | High risk76 | Flagged0.008 |
| 22L00057CONSTRUCTION OF CONCRETE ROAD - MAWAB - NABUNTURAN ROAD (NUEVO ILOCO - STA. MONICA, MAINIT ROAD, NABUNTURAN), PACKAGE 1, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱207M | 100% | High risk64 | Flagged0.006 |
| 18L00032ROAD UPGRADING (GRAVEL TO PAVED) OF DEMOLOC-LITTLE BAGUIO-ALABEL RD INCL. ROW (DATU DANWATA SECT.),K | Region XI | Region XI | On-Going | ₱165.6M | 100% | High risk66 | Flagged0.005 |
| 22L00134ROAD WIDENING AT SPECIFIC LOCATIONS ALONG SURIGAO - DAVAO COASTAL RD. (S01376MN), K1795+185 - K1804+334, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱170.8M | 78% | High risk65 | Flagged0.003 |
| 22L00018CONSTRUCTION OF GRAVEL ROAD - BYPASS ROAD AT JCT. DAVAO CITY DIVERSION ROAD - TIGATTO ROAD - JCT. DAVAO CITY DIVERSION ROAD, DAVAO CITY | Region XI | Region XI | On-Going | ₱63.6M | 12% | Medium risk55 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 276 | 21E00067REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG ITABIAK-SAN VICENTE ROAD, KO170+300.00-KO170+580.00, SAN VICENTE, PALAWAN | Region IV-B | Region IV-B | Completed | ₱75M | 100% | Medium risk48 | —-0.068 |
| 277 | 21E00065REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG ITABIAK - SAN VICENTE ROAD, KO169+403.00 - KO169+592.00, PALAWAN | Region IV-B | Region IV-B | Completed | ₱75.3M | 100% | Medium risk48 | —-0.068 |
| 278 | 18LH0040CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD AT JCT. DAVAO-BUKIDNON ROAD (HIGHWAY TUGBOK PROPER) TO TACUNAN LEADING TO DECA WAKEBOARD INCLUDING BRIDGE, BRGY. TUGBOK, TUGBOK DISTRICT, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱44.6M | 100% | Medium risk48 | —-0.065 |
| 279 | 19DD0060ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE- REPLACEMENT OF PERMANENT WEAK BRIDGES, CALUBCUB BR. (B03111LZ) ALONG SN JUAN- LAIYA RD. | Region IV-A | Batangas 4th DEO | Completed | ₱28.5M | 100% | Medium risk48 | —-0.068 |
| 280 | 18DD0270LOCAL PROGRAM,LOCAL INFRASTRUCTURE PROGRAM,BUILDINGS AND OTHER STRUCTURES,MULTIPURPOSE/FACILITIES,CONSTRUCTION/REPAIR/REHABILITATION OF MULTI-PURPOSE BUILDING IN BARANGAY CALUBCUB 1 NATIONAL HIGH SCHOOL-SENIOR HIGH,SAN JUAN,BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱5.9M | 100% | Medium risk48 | —-0.105 |
| 281 | 18DN0097OO2: CONSTRUCTION/DEEPENING OF BULAW RIVER, BRGY. MUNTING DILAW, ANTIPOLO CITY | Region IV-A | Rizal 1st DEO | Completed | ₱46.6M | 100% | Medium risk48 | —-0.084 |
| 282 | 22MI0090WIDENING OF PERMANENT BRIDGES KABACAN BR. (B01482MN) ALONG MATALAM-LAMPAYAN-ANTIPAS RD | Region XII | Region XII | Completed | ₱142.6M | 100% | Medium risk48 | —-0.030 |
| 283 | 23LF0072KADUNGONAN PARALLEL BR. ALONG SURIGAO DEL SUR BDRY-DAVAO OR COASTAL RD, BAGANGA, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱41.3M | 100% | Medium risk48 | —-0.005 |
| 284 | 23LF0095MANAT PARALLEL BR. ALONG SURIGAO DEL SUR BDRY - DAVAO OR COASTAL RD, BOSTON, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱44.9M | 100% | Medium risk48 | —-0.005 |
| 285 | 18LD0031CONSTRUCTION OF CONCRETE REVETMENT ALONG DIGOS RIVER, DIGOS BRIDGE 2, COGON SECTION, DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱47.5M | 100% | Medium risk48 | —-0.076 |
| 286 | 24DN0110CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - MANILA EAST ROAD - K0036+515 - K0038+012 RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱44.5M | 79% | Medium risk48 | —-0.061 |
| 287 | 20LA0166CONSTRUCTION OF REVETMENT ALONG MAWAB RIVER, BRGY. POBLACION, MAWAB COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱52.1M | 100% | Medium risk48 | —-0.071 |
| 288 | 17K00216CONST. OF BY-PASSES/DIVERSION ROADS,SH BY-PASS RD(CLIMBING LANES)INCL. ROW,CARMEN-PUERTO SECT.,CDOC | Region X | Region X | Completed | ₱157.8M | 100% | Medium risk48 | —-0.024 |
| 289 | 21DI0081CONSTRUCTION OF FOOT BRIDGE AT NATIONAL HIGHWAY, BARANGAY SALA, CABUYAO CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱11.9M | 100% | Medium risk48 | —-0.061 |
| 290 | 18DD0040ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, WIDENING OF PERMANENT BRIDGES, PINAGSIBAAN BR. 2 (B02998LZ) ALONG ROSARIO - SAN JUAN RD, ROSARIO, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱23.5M | 100% | Medium risk47 | —-0.068 |
| 291 | 16OG0226IMPROVEMENT/ REHABILITATION OF DRAINAGE SYSTEM ALONG C. BENITEZ (COL. B. SERRANO TO N. DOMINGO) QC.. | National Capital Region | Quezon City 2nd DEO | Completed | ₱18.4M | 100% | Medium risk47 | —-0.064 |
| 292 | 18DD0067ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, WIDENING OF PERMANENT BRIDGES, PUNLAAN BR. (B03116LZ) ALONG SAN JUAN - LAIYA RD., SAN JUAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱11.8M | 100% | Medium risk47 | —-0.068 |
| 293 | 17OB0127CONSTRUCTION OF SAPANG LIWANAG DRAINAGE OUTFALL VIA LUIS ST. AND MERCEDES AVENUE, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱18.5M | 100% | Medium risk47 | —-0.045 |
| 294 | 18DO0077ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-WIDENING OF PERMANENT BRIDGES-SAMPALOC BR. (B02778LZ) ALONG MARIKINA INFNTA ROAD TANAY, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱23.5M | 100% | Medium risk47 | —-0.066 |
| 295 | 18DL0247FY 2017 DPWH INFRASTRUCTURE PROJECTS MFO 1 - NATIONAL ROAD NETWORK SERVICES CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, REPLACEMENT OF PERMANENT WEAK BRIDGES PANDANAN BRIDGE ALONG DAANG MAHARLIKA (PHASE II), CALAUAG, QUEZON PROVINCE | Region IV-A | Quezon 4th DEO | Completed | ₱23.1M | 100% | Medium risk47 | —-0.064 |
| 296 | 16MH0045CONSTRUCTION OF FLOOD CONTROL (ALA RIVER BASIN) K0+000 - K0+200 SECTION 1, K0+618.5+798.5 SECTION 2, DALADAP, ESPERANZA, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱38.5M | 100% | Medium risk47 | —-0.044 |
| 297 | 17MH0035CONSTRUCTION OF FLOOD CONTROL (ALA RIVER BASIN), K0+000 - K0+380, ESPERANZA, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱36.2M | 100% | Medium risk47 | —-0.049 |
| 298 | 21DP0068LOCAL PROGRAM - CONSTRUCTION OF ROAD LEADING TO PANDIN LAKE, BARANGAY STO. ANGEL, SAN PABLO CITY, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱34.3M | 100% | Medium risk47 | —-0.108 |
| 299 | 21OG0084REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - ELLIPTICAL RD - K0013 + 038 - K0013 + 236, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱35.4M | 100% | Medium risk47 | —-0.099 |
| 300 | 18DD0190LOCAL PROGRAM, CONST./REPAIR/REHAB/ IMPV'T. OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL RODAS AND BRIDGES, LOCAL ROADS, CONST. OF ROAD LEADING TO DECLARED TOURUST DESTINATION, HUGOM-MALABRIGO (HUGOM SECTION) ROAD, SAN JUAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱39.1M | 100% | Medium risk47 | —-0.106 |