Contractor dossier
142 projects on file, including joint ventures this contractor is part of.
Total projects
142
Total budget
₱2.7B
Average progress
98.0%
Completion rate
94.4%
Average risk score
24.4
Low risk on average, out of 100
Flagged as unusual
4
2.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 142 | ₱2.7B | 24.4 | 4 | 98.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 58 | ₱262.4M | 14.4 | 0 | 98.3% |
| Flood Control and Drainage | 35 | ₱1.9B | 37.4 | 1 | 99.1% |
| Roads | 28 | ₱239.5M | 20.5 | 0 | 100.0% |
| Bridges | 14 | ₱126.6M | 21.4 | 0 | 100.0% |
| GAA 2025 SSP | 3 | ₱99.3M | 92.0 | 2 | 84.7% |
| Water Provision and Storage | 3 | ₱23.5M | 26.4 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱91.7M | 91.7 | 1 | 0.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CG0121BASIC INFRASTRUCTURE PROGRAM (BIP): FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION/REHABILITATION OF SAPANG BALEN CREEK, PULUNG BULU SECTION, CITY OF SAN FERNANDO, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱75M | 75% | High risk95 | Flagged0.010 |
| 25CI0054SUSTAINABLE INFRASTRUCTURE PROJECTA ALLEVIATING GAPS (SIPAG); SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION AT BRGY STA TRINIDAD, ANGELES CITY, PAMPANGA | Region III | Pampanga 3rd DEO | On-Going | ₱19.6M | 88% | High risk93 | Flagged0.003 |
| 25CG0069FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - FLOOD MITIGATION STRUCTURE - CONSTRUCTION/ REHABILITATION OF SLOPE PROTECTION WORKS AT BRGY. MALIWALU, BACOLOR, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱91.7M | 0% | High risk92 | Flagged0.009 |
| 25CG0219BASIC INFRASTRUCTURE PROGRAM (BIP): MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - REHABILITATION OF MULTI PURPOSE BUILDING, PARULOG, BACOLOR, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱4.7M | 91% | High risk89 | —-0.002 |
| 25CG0073SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABACAN RIVER, (PHASE I), MEXICO, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱119M | 83% | High risk81 | Flagged0.039 |
| 25CI0080BASIC INFRASTRUCTURE PROGRAM BIP-BIP-MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES; CONSTRUCTION OF MULTIPURPOSE BUILDING IN BRGY BALIBAGO, ANGELES CITY, PAMPANGA | Region III | Pampanga 3rd DEO | On-Going | ₱9.8M | 0% | High risk71 | —-0.007 |
| 25CI0066SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION AT LEONCIA BRGY STO DOMINGO, ANGELES CITY | Region III | Pampanga 3rd DEO | On-Going | ₱28.7M | 84% | High risk70 | —-0.027 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CG0073SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABACAN RIVER, (PHASE I), MEXICO, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱119M | 83% | High risk81 | Flagged0.039 |
| 25CG0121BASIC INFRASTRUCTURE PROGRAM (BIP): FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION/REHABILITATION OF SAPANG BALEN CREEK, PULUNG BULU SECTION, CITY OF SAN FERNANDO, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱75M | 75% | High risk95 | Flagged0.010 |
| 25CG0069FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - FLOOD MITIGATION STRUCTURE - CONSTRUCTION/ REHABILITATION OF SLOPE PROTECTION WORKS AT BRGY. MALIWALU, BACOLOR, PAMPANGA | Region III | Pampanga 1st DEO | On-Going | ₱91.7M | 0% | High risk92 | Flagged0.009 |
| 25CI0054SUSTAINABLE INFRASTRUCTURE PROJECTA ALLEVIATING GAPS (SIPAG); SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION AT BRGY STA TRINIDAD, ANGELES CITY, PAMPANGA | Region III | Pampanga 3rd DEO | On-Going | ₱19.6M | 88% | High risk93 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 24CI0094SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES; CONSTRUCTION OF QUITANGIL CREEK ROAD DIKE, BRGY STA MARIA TO BRGY SAN FRANCISCO, MAB | Region III | Pampanga 3rd DEO | Completed | ₱39.2M | 100% | Medium risk33 | —-0.102 |
| 27 | 23CI0162CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLETORS; WATER SUPPLY SYSTEM: CONSTRUCTION OF SOLAR WATER SYSTEM, BRGY ATLU BOLA, MABALACAT, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱9.6M | 100% | Medium risk33 | —-0.065 |
| 28 | 23CI0028CONST/REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS; CONST. OF REINFORCED CONCRETE SLOPE PROTECTION STRUCTURE ALONG SACOBIA RIVER, MACAPAGAL VILLAGE, MABALACAT, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱49M | 100% | Medium risk33 | —-0.089 |
| 29 | 22CI0036FLOOD MANAGEMENT PROGRAM; CONST/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, IMPROVEMENT OF SLOPE PROTECTION STRUCTURES ALONG QUITANGIL CREEK (DOWNSTREAM), MAGALANG, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱49M | 100% | Medium risk32 | —-0.093 |
| 30 | 22CG0024SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF ROAD, PARULOG AND SAN ANTONIO, BACOLOR, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱28.4M | 100% | Medium risk32 | —-0.103 |
| 31 | 23CI0036FLOOD MANAGEMENT PROGRAM; CONSTRUCTION/MAINTENENCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REPAIR/IMPROVEMENT OF REINFORCED CONCRETE SLOPE PROTECTION ALONG SAPANGBALEN CREEK, BRGY. SAPANGBALEN, MABALACAT CITY, PAMPANGA PHASE 1 | Region III | Pampanga 3rd DEO | Completed | ₱48.9M | 100% | Medium risk32 | —-0.091 |
| 32 | 22CI0092CONVERGENCE AND SPRCIAL SUPPORT PROGRAM: CONST/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES; (ROADS LEVERGING LINKAGES FOR INDUSTRY AND TRADE INFRA PROGRAM-ROLL-IT) NLEX-SCTEX CONNECTING ROADS IN SUPPORT OF FURNITURE, IT-IB | Region III | Pampanga 3rd DEO | Completed | ₱17.2M | 100% | Medium risk32 | —-0.103 |
| 33 | 24CI0001SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUIILDINGS/ FACILITIES, CONSTRUCTION OF REINFORCED CONCRETE SLOPE PROTECTION STRUCTURE WITH GROUNDSILL ALONG SAPANGBALEN CREEK, BARANGAY PULUNG BULU, ANGELES CITY, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱49M | 100% | Medium risk32 | —-0.091 |
| 34 | 24CI0014SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES: CONSTRUCTION OF SLOPE PROTECTION ALONG LEONCIA CREEK-STO DOMINGO, ANGELES CITY | Region III | Pampanga 3rd DEO | Completed | ₱49M | 100% | Medium risk32 | —-0.090 |
| 35 | 23CI0064CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES; REHABILITATION/CONSTRUCTION ALONG DAVID ROAD | Region III | Pampanga 3rd DEO | Completed | ₱19.8M | 100% | Medium risk31 | —-0.105 |
| 36 | 21CG0028LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/ FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING SAN JUAN BAÑO, ARAYAT, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱5.2M | 100% | Medium risk31 | —-0.106 |
| 37 | 22CG0169ASSET PRESERVATION PROGRAM: REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS, TERTIARY ROADS - CANDABA - SN MIGUEL RD. - K0074+000 - K0074+151, CANDABA, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱16.6M | 100% | Medium risk31 | —-0.105 |
| 38 | 24CG0075BASIC INFRASTRUCTURE PROGRAM (BIP): MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, NUEVA VICTORIA, SAN LORENZO, SABANILLA, MEXICO, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱5.6M | 100% | Medium risk31 | —-0.104 |
| 39 | 19CG0004REHABILITATION/ IMPROVEMENT OF TINAJERO AND TALBA ROADS, BACOLOR, PAMPANGA (R.A. 9506- BACOLOR REHABILITATION ACT) | Region III | Pampanga 1st DEO | Completed | ₱11.1M | 100% | Low risk30 | —-0.104 |
| 40 | 23CG0171SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF SAN JUAN BRIDGE NO. 1 ALONG NINOY AQUINO BY-WAY, BARANGAY SAN JU | Region III | Pampanga 1st DEO | Completed | ₱46.5M | 100% | Low risk30 | —-0.062 |
| 41 | 22CI0062BRIDGE PROGRAM-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES; QUITANGIL BRIDGE (BO1950LZ) & ABACAN BRIDGE ALONG (BO1946LZ) MANILA NORTH ROAD, ANGELES CITY AND MABALACAT CITY, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱29.4M | 100% | Low risk30 | —-0.063 |
| 42 | 23CG0224SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - REHABILITATION OF DRAINAGE CANAL AT SANTIAGO, SAN JUAN AND STA. MARIA, STA. ANA, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱14M | 100% | Low risk29 | —-0.093 |
| 43 | 21CI0031FLOOD MANAGEMENT PROGRAM;CONST./MAINT OF FLOOD CONTROL MITIGATION STRUCTURES AND DRAINAGE SYSTEMS,CONST./REHAB OF DRAINAGE SYSTEM AT MABALACAT CITY,PAMPANGA (PHASE 2) | Region III | Pampanga 3rd DEO | Completed | ₱9.4M | 100% | Low risk29 | —-0.091 |
| 44 | 24CG0107BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD INCLUDING DRAINAGE SYSTEM, SITIO MALAYA EXTENSION, DEL PILAR, CITY OF SAN FERNANDO, PAM | Region III | Pampanga 1st DEO | Completed | ₱8.4M | 100% | Low risk29 | —-0.104 |
| 45 | 21CG0249LOCAL INFRASTRUCTURE PROGRAM: LOCAL ROAD AND BRIDGES - LOCAL BRIDGES - CONSTRUCTION OF BRIDGE FROM DELA PAZ NORTE TO LARA, SAN FERNANDO, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱15M | 100% | Low risk29 | —-0.065 |
| 46 | 24CG0295BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES - CONSTRUCTION OF ROAD, MALIWALU-DOLORES, BARANGAY DOLORES, BACOLOR, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱9.4M | 100% | Low risk29 | —-0.104 |
| 47 | 23CI0156CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES: CONCRETING OF DUQUIT COMMON ROADS, BARANGAY DUQUIT, MABALACAT CITY, | Region III | Pampanga 3rd DEO | Completed | ₱4.9M | 100% | Low risk29 | —-0.100 |
| 48 | 23CI0063CONVERGENCE AND SPECIAL SUPPORT PROGRAM; SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES: CONSTRUCTION OF DRAINAGE ALONG BRGY CAPAYA, ANGELES CITY, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱4.9M | 100% | Low risk29 | —-0.088 |
| 49 | 20CG0085BRIDGE PROGRAM: RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - PALAWE BR. (B01471LZ) ALONG JOSE ABAD SANTOS AVE (JASA), CITY OF SAN FERNANDO, PAMPANGA | Region III | Pampanga 1st DEO | Completed | ₱5.4M | 100% | Low risk29 | —-0.063 |
| 50 | 19CI0083LOCAL PROGRAM;CONST/REPAIR/REHAB/IMPROVEMENT OF VARIOUS INFRA INCLUDING LOCAL PROJECTS;CONST OF BOX CULVERT AT PULUNG CACUTUD, ANGELES CITY | Region III | Pampanga 3rd DEO | Completed | ₱11.8M | 100% | Low risk29 | —-0.092 |